5 buyers · 63 tenders · checked 2026-10-03

MDOT MTA: Purple Line P3 $9.847bn; Light Rail Modernization $1.571bn (52 vehicles, CBTC, Cromwell facility); seven solicitations above $5m Sept 2026.

Everything here is free. One market edition opens in full with one email. Open your free edition

2Metro systems operating
5Buyers tracked
62Tenders tracked
5Cities tracked
Live pipeline
$9.85bn Purple Line total Board-authorised contract amount, $5,762.6m MDOT MTA six-year capital programme, $1.57bn Light Rail Modernization Program, $552.0m Metro railcar and signal replacement, $505.7m MARC Penn Line improvements, $481.7m Howard Street Tunnel, $224.4m Red Line development; 62 tracked procurements
Technology areas
Rolling-stock hardware, Signalling & train control, Track & civil, Electrification, Digital operations, Predictive maintenance, Cybersecurity, AI inspection

Key figures

MDOT MTA six-year capital progr…$5,762.6 millionMDOT MTA six-year capital programme in the draft FY2027-FY2032 Consolidated Transportation Program, of which $5,252.0m is the Major Construction Program and $168.8m the Major Development & Evaluation Program; MDOT's whole six-year capital programme is $21,933.2m
2 sources · all primary
  • ● Maryland Department of Transportation · DRAFT FY2027-FY2032 Consolidated Transportation Program, Maryland Transit Administration chapter (capital programme summary and 58 project pages with total estimated cost, expended through close year and six-year cash flow) (published 2026 · checked 2026-09-14)
  • ● Maryland Department of Transportation · DRAFT FY2027-FY2032 Consolidated Transportation Program, MDOT Operating and Capital Program Summary (capital programme by modal administration and fiscal year) (published 2026 · checked 2026-09-14)
Total Board-authorised Purple L…$9,847,350,319Total Board-authorised Purple Line P3 contract amount in year-of-expenditure dollars after eight modifications, covering construction, thirty years of operations and maintenance and the repayment of construction debt; the original 2016 authorisation was $5,590,000,000 (Board of Public Works, 13 March 2024, item 14-GM-MOD, Attachment 1)
1 source · primary
  • ● Maryland Board of Public Works · Department of Transportation Action Agenda, 13 March 2024, item 14-GM-MOD: Purple Line P3 Agreement Modification No. 8, with Attachment 1, the full history of contract authorisations (published 2024-03-13 · checked 2026-09-14)
Purple Line opening as MTA's ow…late 2027Purple Line opening as MTA's own project page states it; the Board of Public Works approved a 234-day extension of the Revenue Service Availability Deadline from Spring 2027 to Winter 2027 on 13 March 2024, and MTA records major construction nearing completion with testing and operator training under way
3 sources · all primary
  • ● MDOT Maryland Transit Administration · Purple Line - Project Overview: 16-mile light rail line, 21 stations (11 in Prince George's County, 10 in Montgomery County), connections to Metrorail, MARC and Amtrak, slated to open in late 2027 (published 2026 · checked 2026-09-14)
  • ● Maryland Board of Public Works · Department of Transportation Action Agenda, 13 March 2024, item 14-GM-MOD: Purple Line P3 Agreement Modification No. 8, with Attachment 1, the full history of contract authorisations (published 2024-03-13 · checked 2026-09-14)
  • ● Maryland Department of Transportation · DRAFT FY2027-FY2032 Consolidated Transportation Program, Maryland Transit Administration chapter (capital programme summary and 58 project pages with total estimated cost, expended through close year and six-year cash flow) (published 2026 · checked 2026-09-14)
Aggregate sum payable from MDOT…$250,000,000Aggregate sum payable from MDOT and MTA to Purple Line Transit Partners under the Settlement Agreement approved by the Board of Public Works on 16 December 2020, of which the first portion, $100,000,000, was payable on or before 31 December 2020; the agreement also settled the parties' claims and set the process for selecting a replacement design-build contractor
1 source · primary
  • ● Maryland Board of Public Works · Department of Transportation Action Agenda, 16 December 2020, item 14-GM-MOD: Purple Line P3 Agreement PUR-16-017-PP, Settlement Agreement and Second Amendment (published 2020-12-16 · checked 2026-09-14)
Light Rail Modernization Progra…$1,571,246 thousandLight Rail Modernization Program total estimated cost in the draft FY2027-FY2032 capital programme - 52 low-floor vehicles replacing the 52 cars of 1992, a new train control system, all 33 stations, new track, power and control systems and two maintenance facilities, complete in 2034
2 sources · all primary
  • ● Maryland Department of Transportation · DRAFT FY2027-FY2032 Consolidated Transportation Program, Maryland Transit Administration chapter (capital programme summary and 58 project pages with total estimated cost, expended through close year and six-year cash flow) (published 2026 · checked 2026-09-14)
  • ● MDOT Maryland Transit Administration · Light Rail Modernization Program - programme page (52 low-floor vehicles, all 33 stations, seven-minute headways, programme timeline to 2034, Industry Day of 26 June) (published 2026 · checked 2026-09-14)
MDOT MTA solicitations open on…7 of 18MDOT MTA solicitations open on eMaryland Marketplace Advantage at 09:28 EDT on 14 September 2026 (the Riverside environmental IFB closed later that day, leaving six) that are rail-scope and clear the US$5 million market floor, out of eighteen records with the status Open returned by a sub-agency filter of J05, MDOT MTA. The eleven not carried are, in full: Motorola radios (BPM058825); an HPE server equipment task order (BPM058738); an artificial-intelligence firearms-detection request for information (BPM058423); the sale, removal and disposal of 23 surplus transit coaches (BPM058513); the agency-wide Homeland Security surveillance and video management system upgrade at estimated cost class E, $2.5m-$5m (BPM058701); the Metro Charles Center dewatering discharge pipe replacement at class B, $100k-$500k (BPM058652); the LTR South 5kV signal power replacement, which publishes no class and no scope that evidences the floor (BPM057518) - the exclusion was tested rather than assumed: all three of MTA's look-ahead schedules of August 2026 were searched on 14 September 2026 for a matching line and none exists, the construction schedule's six LTR lines being Arial Fiber Optic Cables Replacement (class D), Catenary Rehabilitation Phase 2 (H), Repairs to Bridge and Warning Sign Structures (D), North End Track Refurbishment (H), Roof Replacement at Various Locations (cost class TBD) and Substation Breaker Rehabilitation (C), so no MTA cost class exists for this solicitation at all; Metro T&C room power distribution (BPM058044), the Light Rail CBD fibre replacement (BPM058041), whose own eMMA record carries a Project Cost Class of 'D - $1,000,000 to $2,500,000', below the floor - the class is read from the solicitation record itself, not inferred from a look-ahead line, and the record's scope is the construction of pathways and fibre optic cable from Hamburg Station to the North Avenue Maintenance Facility, splicing into the existing 144-strand aerial cable on the catenaries because the existing 84-strand cable has reached the end of its life. It is MTA's re-advertisement of the solicitation the agency cancelled, and the link is observed rather than inferred: the cancelled BPM051411 is contract T-1466-0140 and carries a Cancellation Notice attachment, the file 'T-1466-0140- Cancellation notice.pdf' of 19 February 2026, while the open BPM058041 is contract T-1466-0140R, the same 'R' re-advertisement convention MTA uses on T-1720-0150R and T-1986-0350R, both carried in this file; and a bus-garage lower window repair (BPM058261) at class D, $1m-$2.5m; and one record whose due date was 21 April 2021 (BPM023296), whose issuing-agency column reads Maryland Department of Transportation rather than Maryland Transit Administration
6 sources · all primary
  • ● eMaryland Marketplace Advantage (eMMA) · Public Solicitations browse, filtered to Sub Agency J05 Maryland Transit Administration (Ivalua grid; 18 records with Status = Open on 14 September 2026, and the full LRMP / Light Rail / rail keyword histories) (published 2026-09 · checked 2026-09-14)
  • ● eMaryland Marketplace Advantage (eMMA) · BPM058041 - Light Rail CBD Fiber Replacement, contract T-1466-0140R; Invitation for Bid, Functional Area 1 / Round 3, status Open, due 21 October 2026; Project Cost Class on the record reads 'D - $1,000,000 to $2,500,000' (published 2026-09-04 · checked 2026-09-14)
  • ● eMaryland Marketplace Advantage (eMMA) · BPM051411 - Light Rail CBD Fiber Replacement - Cancelled, contract T-1466-0140; Invitation for Bid, Functional Area 1 / Round 10, status Closed, award status Cancelled. The record carries a Cancellation Notice attachment, the file 'T-1466-0140- Cancellation notice.pdf', dated 19 February 2026 (published 2026-02-19 · checked 2026-09-14)
  • ● MDOT Maryland Transit Administration · Current and Upcoming Solicitations - Construction Contracts, August 2026 (look-ahead schedule with mode, project title, procurement method, estimated advertisement date, estimated notice to proceed and estimated cost class) (published 2026-08 · checked 2026-09-14)
  • ● MDOT Maryland Transit Administration · Current and Upcoming Solicitations - On-Call Master Contracts, August 2026 (look-ahead schedule with estimated cost class) (published 2026-08 · checked 2026-09-14)
  • ● MDOT Maryland Transit Administration · Upcoming A&E Solicitations, 19 August 2026 (anticipated contract numbers, number of contracts, approximate total contract authority, duration and procurement method) (published 2026-08-19 · checked 2026-09-14)
MTA annual ridership in FY2026…5.6m / 5.3m / 4.2mMTA annual ridership in FY2026 as published on its own capital-programme pages: Light Rail exceeded 5.6 million, MARC exceeded 5.3 million and Metro exceeded 4.2 million
1 source · primary
  • ● Maryland Department of Transportation · DRAFT FY2027-FY2032 Consolidated Transportation Program, Maryland Transit Administration chapter (capital programme summary and 58 project pages with total estimated cost, expended through close year and six-year cash flow) (published 2026 · checked 2026-09-14)
Double-stack clearance achieved…22 of 22 sitesDouble-stack clearance achieved at all 22 sites in May 2026 on the Howard Street Tunnel Project; CSX is operating daily double-stack trains in and out of the Port of Baltimore and remaining construction is expected to wrap up in Spring 2027, against a state capital line of $481,704 thousand of which $470,347 thousand was expended through the close of FY2025
2 sources · all primary
  • ● Maryland Department of Transportation · DRAFT FY2027-FY2032 Consolidated Transportation Program, Maryland Port Administration chapter (Howard Street Tunnel Project, Port of Baltimore Rail Capacity Modernization Project, Reduced Emission Locomotives for CSX Curtis Bay Yard) (published 2026 · checked 2026-09-14)
  • ● Maryland Department of Transportation · DRAFT FY2027-FY2032 Consolidated Transportation Program, Multimodal Freight Projects chapter (Howard Street Tunnel completion, Ports America Chesabeake investment at Seagirt, the Eastern Shore freight rail P3, the Maryland Freight Rail Grant Program) (published 2026 · checked 2026-09-14)
Red Line development and evalua…$224,354 thousand, mode under considerationRed Line development and evaluation budget - $156,458 thousand of planning and $67,896 thousand of engineering, with no right-of-way, utility or construction phase funded. MTA's project site records light rail announced as the mode in summer 2024; the draft FY2027-FY2032 capital programme says the options under consideration include a full 14-mile light rail project, a phased light rail project and revisiting bus rapid transit, with public engagement ongoing after open houses in May 2026
2 sources · all primary
  • ● Maryland Department of Transportation · DRAFT FY2027-FY2032 Consolidated Transportation Program, Maryland Transit Administration chapter (capital programme summary and 58 project pages with total estimated cost, expended through close year and six-year cash flow) (published 2026 · checked 2026-09-14)
  • ● MDOT Maryland Transit Administration · Baltimore Red Line project site - project milestones from the June 2023 relaunch to the spring 2026 open houses (published 2026 · checked 2026-09-14)
Maryland entries on the Federal…0 rail of 2Maryland entries on the Federal Transit Administration's Capital Investment Grants dashboard, last updated Thursday 10 September 2026: MD 355 Central Flash Bus Rapid Transit (New Starts project development) and Veirs Mill Road BRT (Small Starts project development), both in Montgomery County and both bus. No Maryland rail project appears on the list
1 source · primary
  • ● Federal Transit Administration · Current Capital Investment Grants Program and Expedited Project Delivery Pilot Program Projects (the CIG Dashboard published under 49 U.S.C. 5309(r)), last updated Thursday 10 September 2026 (published 2026-09-10 · checked 2026-09-14)
The Federal Railroad Administra…no Maryland corridorThe Federal Railroad Administration's Corridor ID Program Monthly Obligation Status Report, last updated Tuesday 31 March 2026, names no Maryland corridor in any of its four categories - new high-speed rail, new conventional rail, existing route with extension, or existing route. The nearest sponsors are the Delaware Transit Corporation's Diamond State Line and Virginia's Commonwealth and Washington-to-Bristol corridors
2 sources · all primary
  • ● Federal Railroad Administration · Corridor ID Program Monthly Obligation Status Report, last updated Tuesday 31 March 2026 (three pages; every corridor, sponsor and Step 1/2/3 obligation) (published 2026-03-31 · checked 2026-09-14)
  • ● Federal Railroad Administration · Corridor ID Obligation Status Report (eLibrary landing page) (published 2026-04 · checked 2026-09-14)
Maryland's six-year share of th…$3,303.6 millionMaryland's six-year share of the Washington Metropolitan Area Transit Authority's Capital Improvement Program in the draft FY2027-FY2032 Consolidated Transportation Program, against a total estimated cost of $5,642,642 thousand with $3,834,872 thousand expended through the close of FY2025; WMATA's FY2027-FY2032 programme was adopted by its Board on 23 April 2026 and includes rail car replacement and track and rail structure rehabilitation. WMATA is an Atlas body in the District of Columbia file and its procurement is not duplicated here
1 source · primary
  • ● Maryland Department of Transportation · DRAFT FY2027-FY2032 Consolidated Transportation Program, Washington Metropolitan Area Transit Authority chapter (Maryland's share of WMATA's Capital Improvement Program) (published 2026 · checked 2026-09-14)
First-round awards under the Ma…$1.2 million to five projectsFirst-round awards under the Maryland Freight Rail Grant Program in late 2025, supporting rail rehabilitation, resilience, corridor preservation and improvements for rail-served businesses; a further $3.35 million is available for awards through 2030. Every award is below the US$5 million market floor and none is carried as a tender
1 source · primary
  • ● Maryland Department of Transportation · DRAFT FY2027-FY2032 Consolidated Transportation Program, Multimodal Freight Projects chapter (Howard Street Tunnel completion, Ports America Chesabeake investment at Seagirt, the Eastern Shore freight rail P3, the Maryland Freight Rail Grant Program) (published 2026 · checked 2026-09-14)
Sum of the published not-to-exc…$681,440,000Sum of the published not-to-exceed ceilings of the eleven MDOT MTA professional-services contract series carried in this file, as the Board of Public Works most recently authorised each of them. On-Call Architecture and Engineering AE-23-002, $168,000,000 across eight contracts; Open-End General Engineering Consultant AE-22-003, $100,000,000 across four; Project Planning AE-22-002, $90,000,000 across six; Open-End Program / Project Management Consultant AE-24-001, $60,000,000 across three as advertised, of which only Contract B at $20,000,000 is approved; Safety Management Systems AE-23-003, $60,000,000 across five; Rolling Stock and Associated Equipment Services AE-22-001, $51,000,000 across the three contracts approved on 8 January 2025; Communications and Security System Engineering AE-19-002, $45,440,000 across three after the modification of 22 April 2026; On-Call Systems Engineering AE-20-003, $45,000,000 across three after the modification of 19 August 2026; Open-End Trackwork Engineering AE-19-003, $36,000,000 across four after the modification of 22 April 2026; On-Call Construction Management and Inspection AE-20-001 Contract B, $15,500,000; and On-Call Systems Engineering AE-19-005-SBE-D, $10,500,000. These are ceilings, not spend, and MTA publishes no spend against any of them; the total is a total of ceilings and of nothing else. It includes $40,000,000 of AE-24-001 capacity that the Board had not yet approved as of 14 September 2026
10 sources · all primary
  • ● Maryland Board of Public Works · Department of Transportation Action Agenda, 22 July 2026, items 4-AE, 5-C, 6-C and 7-C: On-Call A&E AE-23-002-E&H, RAISE East-West Transit Priority Project Phase 1, Light Rail Maple/Twin Oaks Grade Crossing & Drainage Repairs, and Light Rail Catenary Poles Replacement, each with its bid tabulation (published 2026-07-22 · checked 2026-09-14)
  • ● Maryland Board of Public Works · Department of Transportation Action Agenda, 11 June 2025, item 5-AE: Open-End General Engineering Consultant (GEC) Services, AE-22-003-A, B, C and D (published 2025-06-11 · checked 2026-09-14)
  • ● Maryland Board of Public Works · Department of Transportation Action Agenda, 22 April 2026, items 7-AE and 10-C: Project Planning for MTA Bus, Light Rail, Metro, MARC, Commuter Bus & Mobility Capital Projects (AE-22-002-B&D) and Fast Forward Bus Stop ADA Improvements (published 2026-04-22 · checked 2026-09-14)
  • ● Maryland Board of Public Works · Department of Transportation Action Agenda published in advance of the Board's meeting of 16 September 2026 (3,434,483 bytes, 218pp), item 5-AE at pp.78-80: Open-End Program / Project Management Consultant Services AE-24-001-A&C - Gannett Fleming-Hill Joint Venture (Contract A, $25,000,000 NTE) and WSP-Wallace Montgomery - A Joint Venture for AE-24-001 (Contract C, $15,000,000 NTE), $40,000,000 NTE aggregate, proposed term 10/08/2026-10/07/2031, closing with the unmarked 'BOARD OF PUBLIC WORKS THIS ITEM WAS: APPROVED DISAPPROVED DEFERRED WITHDRAWN'. The Board's 2026 document listing, read the same day, carried the agenda for that date and no summary, transcript or audio recording: the meeting had not taken place (published 2026-09-16 · checked 2026-09-14)
  • ● Maryland Board of Public Works · Department of Transportation Action Agenda, 8 January 2025, item 2-AE: Rolling Stock and Associated Equipment Services, AE-22-001-A, C and D (published 2025-01-08 · checked 2026-09-14)
  • ● Maryland Board of Public Works · Department of Transportation Action Agenda, 2 July 2025, items 9-C, 11-M and 12-M: Light Rail Catenary Surge Protection Device Replacement, Light Rail Vehicle Interior Cleaning and Light Rail Building Maintenance (published 2025-07-02 · checked 2026-09-14)
  • ● Maryland Board of Public Works · Department of Transportation Action Agenda, 6 August 2025 (3,658,079 bytes, 205pp): item 6-AE, Safety Management Systems Services AE-23-003-D (published 2025-08 · checked 2026-09-14)
  • ● Maryland Board of Public Works · Department of Transportation Action Agenda, 27 August 2025 (5,318,290 bytes, 257pp): item 5-AE, Safety Management Systems Services AE-23-003-C (published 2025-08 · checked 2026-09-14)
  • ● Maryland Board of Public Works · Department of Transportation Action Agenda, 19 August 2026, item 2-AE: Open-End Program / Project Management Consultant Services, AE-24-001-B (published 2026-08-19 · checked 2026-09-14)
  • ● Maryland Board of Public Works · Department of Transportation Action Agenda, 23 April 2025 (4,981,970 bytes, 195pp): item 3-AE-MOD, On-Call Construction Management & Inspection Services for Statewide Construction Projects AE-20-001-B (published 2025-04 · checked 2026-09-14)

Buyers

BuyerTypeTendersContracts awarded
Maryland Transit AdministrationTransit authority6043
Maryland Port AdministrationDevelopment authority31
Purple Line Transit Partners LLCPPP concessionaire02
Maryland Board of Public WorksOther00
Maryland Department of TransportationState DOT00

Tenders

TenderBuyerStatusValue bandNext key date
Maryland Light Rail Modernization Program, three tranches · 3 partsMDOT MTAOpen (mixed across parts)Varies by partCloses July 2026
Light Rail Modernization Program Tranche 3 Cromwell FacilityMDOT MTAOpenestimated cost class L: over $100 million, in MTA's own construction look-ahead of August 2026; MTA publishes no contract valuePublished July 2026
Light Rail Modernization Program Tranche 2 33 stationsMDOT MTAPre-bidestimated cost class L: over $100 million, in MTA's own construction look-ahead of August 2026; MTA publishes no contract value
Light Rail Modernization Program Tranche 1 vehicles controlMDOT MTABids closedestimated cost class M, 'M: >$500M', in MTA's own construction look-ahead of August 2026 - an open-ended class with no published ceiling; eMMA gives the same solicitation a Project Cost Class of 'H - Over $15,000,000'
Light Rail Metro Facilities Ancillary maintenance constructionMDOT MTAOpenestimated cost class H: $15 million to $30 million, for the matching line in MTA's own on-call master contract look-ahead of August 2026; MTA publishes no contract value
MARC Mechanical Ancillary maintenance construction master contractMDOT MTAOpenestimated cost class G: $10 million to $15 million, for the matching line in MTA's own on-call master contract look-ahead of August 2026; MTA publishes no contract value
MDOT Freight Rail P3 concession Maryland and DelawareMDOT MTAOpenvalue not published - MDOT publishes no figure for the concession
MTA Elevator Modernization design-build forty elevatorsMDOT MTABids closedestimated cost class J: $50 million to $75 million, in MTA's own construction look-ahead of August 2026; MTA publishes no contract value
MARC Riverside Yard environmental upgrades tank flotation dieselMDOT MTABids closedestimated cost class F: $5 million to $10 million, for the matching line in MTA's own construction look-ahead of August 2026; MTA publishes no contract valueBids closed September 2026 · award expected
Metro SubwayLink Reisterstown Plaza East interlocking reconstructionMDOT MTABids closedestimated cost class G: $10 million to $15 million, in MTA's own construction look-ahead of August 2026; MTA publishes no contract valueBids closed September 2026 · award expected
Purple Line Bethesda New Carrollton design-build P3MDOT MTAIn executionover $1bnContract runs to December 2057
MARC Improvements Penn Line Amtrak Northeast CorridorMDOT MTAIn execution$500m–1bn
MARC CSX Access Agreement Camden BrunswickMDOT MTAIn execution$100–500mAwarded June 2021
Frederick Douglass Tunnel Maryland Amtrak B&P Tunnel replacementMDOT MTAIn execution$100–500m
Howard Street Tunnel Reconstruction and Bridge ClearanceMPAIn execution$100–500m
MARC Improvements Camden Brunswick Lines CSX corridorsMDOT MTAIn execution$100–500m
On-Call Architecture and Engineering Services MTA major projectsMDOT MTAIn execution$100–500m
MTA Communications Security System Engineering ServicesMDOT MTAIn execution$25–100mContract runs to December 2026
Construction General Purpose Ancillary MTA bus rail maintenanceMDOT MTAIn execution$25–100mAwarded July 2026
Elevator escalator maintenance testing SubwayLink RailLink busMDOT MTAIn execution$25–100mAwarded December 2025
MARC New Maintenance Yard ConstructionMDOT MTAIn execution$25–100mAwarded October 2025
Metro SubwayLink facilities janitorial servicesMDOT MTAIn execution$25–100mAwarded May 2025
MTA On-Call Systems Engineering, three IDIQ contractsMDOT MTAIn execution$25–100mContract runs to February 2028
Open-End General Engineering Consultant Services MTA major projectsMDOT MTAIn execution$25–100mAwarded June 2025
Open-End Program Project Management Consultant Services MTAMDOT MTAIn execution$25–100m
MARC Light Rail Metro Trackwork Engineering ServicesMDOT MTAIn execution$25–100mContract runs to December 2027
Project Planning MTA Bus Rail Metro MARC MobilityMDOT MTAIn execution$25–100m
Rolling Stock Associated Equipment Services MTA locomotives vehiclesMDOT MTAIn execution$25–100mAwarded January 2025
MTA Safety Management Systems ServicesMDOT MTAIn execution$25–100mContract runs to September 2030
Susquehanna River Bridge replacement Maryland Amtrak Northeast CorridorMDOT MTAIn execution$25–100mCompletion 2032
MARC CSX Master License AgreementMDOT MTAIn execution$5–25mAwarded June 2021
Light rail vehicle interior cleaningMDOT MTAIn execution$5–25mAwarded July 2025
MARC Ancillary Repairs Maintenance and ConstructionMDOT MTAIn execution$5–25mAwarded June 2023
MARC Penn Line stations snow and ice removalMDOT MTAIn execution$5–25mAwarded September 2025
MARC positive train control Electronic Train Management SystemMDOT MTAIn execution$5–25mAwarded March 2025
MTA On-Call Construction Management and InspectionMDOT MTAIn execution$5–25mAwarded June 2022
MTA On-Call Systems Engineering, small business contractMDOT MTAIn execution$5–25mAwarded October 2022
Light Rail Modernization Program fifty-two vehicles thirty-three stationsMDOT MTAPlannedover $1bn
Metro SubwayLink railcar replacement train control overhaulsMDOT MTAPlanned$500m–1bnTarget 2031
Baltimore Red Line Woodlawn Bayview downtown BaltimoreMDOT MTAPlanned$100–500m
Light rail vehicle overhaulMDOT MTAPlanned$100–500mTarget 2032
MARC coaches MARC III MARC IV fleet overhaulMDOT MTAPlanned$100–500m
MARC locomotives MP36PH-3C overhaul Massachusetts Bay TransportationMDOT MTAPlanned$100–500mTarget 2032
MARC maintenance layover storage facilities Martin State AirportMDOT MTAPlanned$100–500m
Metro Light Rail maintenance of way annual renewalMDOT MTAPlanned$100–500m
Fare collection system and equipment replacementMDOT MTAPlanned$25–100mTarget 2032
Light RailLink systems overhauls and replacementsMDOT MTAPlanned$25–100mTarget 2032
Light RailLink trackwork overhauls and replacementMDOT MTAPlanned$25–100m
Metro Mondawmin Transit Hub Station UpgradesMDOT MTAPlanned$25–100mTarget 2032
Metro SubwayLink interlocking renewalsMDOT MTAPlanned$25–100mTarget 2032
Metro SubwayLink maintenance facility improvementsMDOT MTAPlanned$25–100mTarget 2032
Metro SubwayLink systems overhauls and replacementsMDOT MTAPlanned$25–100mTarget 2032
Metro SubwayLink tunnel repairs and improvementsMDOT MTAPlanned$25–100mTarget 2032
Southern Maryland Rapid Transit Grade-Separated TransitwayMDOT MTAPlanned$25–100mTarget 2032
MTA Radio Telecommunications Upgrade Maryland FiRSTMDOT MTAPlanned$5–25mTarget 2032
Baltimore Penn Station multimodal access improvements RAISE grantMDOT MTAPlanned$5–25mTarget 2032
MARC BWI 4th Track Marshall Airport stationMDOT MTAPlanned$5–25m
MARC BWI Rail Station Upgrades and RepairsMDOT MTAPlanned$5–25mTarget 2032
MARC Penn-Camden Connector Northeast Corridor CSX Camden LineMDOT MTAPlanned$5–25m
MARC Stations Service Studies and Rail ModellingMDOT MTAPlanned$5–25mTarget 2032
Metro SubwayLink Station Rehabilitation ProgramMDOT MTAPlanned$5–25mTarget 2032
Port of Baltimore Rail Capacity ModernizationMPAPlanned$5–25m
CSX Curtis Bay Yard Reduced Emission LocomotivesMPAPlanned$5–25mTarget 2028
MARC MP36PH-3C GP-40 locomotive overhaul cancelledMDOT MTACancelledno value published - the eMMA record carries neither a contract value nor a Project Cost Class

Cities

CityNetwork statusNetworks
Baltimoreoperational - Metro SubwayLink heavy rail, the Central Light Rail Line (Light RailLink) with 33 stations, MARC commuter rail on the Penn, Camden and Brunswick lines at Baltimore Penn and Camden stations, Amtrak's Northeast Corridor at Baltimore Penn Station, and CSX and Norfolk Southern freight through the Howard Street Tunnel and the Port of BaltimoreMetro SubwayLink; Light RailLink; MARC Penn Line; MARC Camden Line; MARC Brunswick Line; Amtrak Northeast Corridor
Silver Springunder construction and operational - the Purple Line's Silver Spring Transit Center station is under construction, alongside WMATA Metrorail's Red Line and MARC's Brunswick LinePurple Line (under construction); WMATA Metrorail Red Line; MARC Brunswick Line
Bethesdaunder construction and operational - the Purple Line's western terminus, with an elevator shaft connecting to WMATA Metrorail's Red Line 150 feet below downtown BethesdaPurple Line (under construction); WMATA Metrorail Red Line
College Parkunder construction and operational - Purple Line construction on the University of Maryland campus with embedded track and overhead catenary on Campus Drive, alongside WMATA Metrorail's Green Line and MARC's Camden LinePurple Line (under construction); WMATA Metrorail Green Line; MARC Camden Line
New Carrolltonunder construction and operational - the Purple Line's eastern terminus, with WMATA Metrorail's Orange Line, MARC's Penn Line and AmtrakPurple Line (under construction); WMATA Metrorail Orange Line; MARC Penn Line; Amtrak Northeast Corridor

Players with a footprint here

PlayerKindFootprint
Kimley-HornEngineering consultantProject presence
RK&KEngineering consultantProject presence
SchindlerOtherProject presence
Brawner BuildersCivil contractorProject presence
GFT InfrastructureEngineering consultantProject presence
JMTEngineering consultantProject presence
WRAEngineering consultantProject presence

Withheld in the free surface

  • Capex in this region (3)
  • Market narrative
  • Notes

Full detail withheld: 3 fields. In the United States edition · See a fully open example

  • Procurement routes note
  • Board reporting note

Full detail withheld: 2 fields. In the United States edition · See a fully open example

Sources

  • ● City of Baltimore, Bureau of Procurement · Bid Opportunities - thirteen open bids on 14 September 2026, none of them rail (published 2026-09 · checked 2026-09-14)
  • ● Maryland Board of Public Works · Department of Transportation Action Agenda, 13 March 2024, item 14-GM-MOD: Purple Line P3 Agreement Modification No. 8, with Attachment 1, the full history of contract authorisations (published 2024-03-13 · checked 2026-09-14)
  • ● Maryland Board of Public Works · Department of Transportation Action Agenda, 22 April 2026, items 7-AE and 10-C: Project Planning for MTA Bus, Light Rail, Metro, MARC, Commuter Bus & Mobility Capital Projects (AE-22-002-B&D) and Fast Forward Bus Stop ADA Improvements (published 2026-04-22 · checked 2026-09-14)
  • ● Maryland Board of Public Works · Department of Transportation Action Agenda, 18 June 2026, item 8-AE: On-Call Architecture and Engineering Services, AE-23-002-A, B, C, D, F and G, with the full technical scoring table (published 2026-06-18 · checked 2026-09-14)
  • ● Maryland Board of Public Works · Board of Public Works Meeting Documents - agenda, summary, audio recording, transcript and public comments by year (?year=YYYY) (published 2026 · checked 2026-09-14)
  • ● Maryland Department of Transportation · DRAFT FY2027-FY2032 Consolidated Transportation Program, Maryland Transportation Authority chapter (34 project pages, none of them rail) (published 2026 · checked 2026-09-14)
  • ● Maryland Department of Transportation · Capital Programming - index of the Consolidated Transportation Program, the draft FY2027-FY2032 CTP and the archived adopted programmes (published 2026 · checked 2026-09-14)
  • ● eMaryland Marketplace Advantage (eMMA) · BPM053120 - LTR Vehicle & Train Control Modernization (LRMP Tranche 1), contract T-8000-2157, Round 12, status Responses Opened, due 22 June 2026; Project Cost Class 'H - Over $15,000,000' (published 2026-05-28 · checked 2026-09-14)
  • ● eMaryland Marketplace Advantage (eMMA) · BPM056756 - Request for Proposals for Concession of Services for MDOT-Owned Freight Railroad Lines on Maryland's Eastern Shore and in Delaware through Public-Private Partnership (P3), Functional Area 1 / Round 5, status Open, due 10 November 2026 (published 2026-09-04 · checked 2026-09-14)
  • ● eMaryland Marketplace Advantage (eMMA) · BPM057988 - LTR Cromwell Maintenance & Storage Facility Modernization Project (LRMP Tranche 3), contract T-2443-0150, RFP Double Envelope, status Open, due 12 November 2026 (published 2026-08-11 · checked 2026-09-14)
  • ● eMaryland Marketplace Advantage (eMMA) · Public Contracts browse, filtered to J05 Maryland Transit Administration (contract name, supplier, effective and expiry dates; no value field) (published 2026-09 · checked 2026-09-14)
  • ● eMaryland Marketplace Advantage (eMMA) · Public Solicitations browse, filtered to Sub Agency J05 Maryland Transit Administration (Ivalua grid; 18 records with Status = Open on 14 September 2026, and the full LRMP / Light Rail / rail keyword histories) (published 2026-09 · checked 2026-09-14)
  • ● Federal Railroad Administration · Corridor ID Obligation Status Report (eLibrary landing page) (published 2026-04 · checked 2026-09-14)
  • ● Federal Railroad Administration · Corridor ID Program Monthly Obligation Status Report, last updated Tuesday 31 March 2026 (three pages; every corridor, sponsor and Step 1/2/3 obligation) (published 2026-03-31 · checked 2026-09-14)
  • ● Federal Transit Administration · Current Capital Investment Grants Program and Expedited Project Delivery Pilot Program Projects (the CIG Dashboard published under 49 U.S.C. 5309(r)), last updated Thursday 10 September 2026 (published 2026-09-10 · checked 2026-09-14)
  • ● BidNet Direct / Maryland Purchasing Group · Montgomery County bid opportunities - ten open solicitations on 14 September 2026, none of them rail (published 2026-09 · checked 2026-09-14)
  • ● Montgomery County Government, Office of Procurement · Formal Solicitations - all Montgomery County solicitations are issued through BidNet's Maryland Purchasing Group (published 2026 · checked 2026-09-14)
  • ● MDOT Maryland Transit Administration · Upcoming A&E Solicitations, 19 August 2026 (anticipated contract numbers, number of contracts, approximate total contract authority, duration and procurement method) (published 2026-08-19 · checked 2026-09-14)
  • ● MDOT Maryland Transit Administration · Current and Upcoming Solicitations - Construction Contracts, August 2026 (look-ahead schedule with mode, project title, procurement method, estimated advertisement date, estimated notice to proceed and estimated cost class) (published 2026-08 · checked 2026-09-14)
  • ● MDOT Maryland Transit Administration · Current and Upcoming Solicitations - On-Call Master Contracts, August 2026 (look-ahead schedule with estimated cost class) (published 2026-08 · checked 2026-09-14)
  • ● Maryland Department of General Services, Office of State Procurement · procurement.maryland.gov - the Office of State Procurement is the primary procurement unit for all delegated procurements from the Board of Public Works except transportation and transportation-related procurements (published 2026 · checked 2026-09-14)
  • ● US General Services Administration · SAM.gov public search service (index=opp) - federal contract opportunities (published 2026-09 · checked 2026-09-14)

Browse: the Atlas · United States · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.