MARC locomotives MP36PH-3C overhaul Massachusetts Bay Transportation
MARC locomotives - mid-life overhaul of 26 MP36PH-3C diesels and a new locomotive procurement run jointly with the Massachusetts Bay Transportation Authority
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Buyer
- Maryland Transit Administration
- Where
- Maryland · Baltimore
- Segments
- Rolling stock
- Technology areas
- Rolling-stock hardware, Predictive maintenance, Electrification
- Status
- Planned — MTA's draft FY2027-FY2032 Consolidated Transportation Program, published for the autumn 2026 consultation, records the MARC MP36PH-3C locomotive mid-life overhaul of 26 locomotives and the MARC new locomotives procurement as in procurement, the latter including a joint procurement with the Massachusetts Bay Transportation Authority.
- Value band
- $100–500m
- Currency
- USD
- Key dates (month)
- In procurement 2026 · Programme end 2032
Status in full
Read more
MTA's draft FY2027-FY2032 Consolidated Transportation Program, published for the autumn 2026 consultation, records the MARC MP36PH-3C locomotive mid-life overhaul of 26 locomotives and the MARC new locomotives procurement as in procurement, the latter including a joint procurement with the Massachusetts Bay Transportation Authority. The overhaul is no longer in procurement: MTA's own solicitation for it, BPM054272, was cancelled, and eMaryland Marketplace Advantage showed it in September 2026 as Closed with the award status Cancelled against a close date of September 2026. It is carried as a separate cancelled record. No award is published against this line.
Next step
Withheld in the free surface
- Full scope
- Exact value
- How the figure was arrived at
- Key dates (2)
- Published bidders
Full detail withheld: 5 fields. In the United States edition · See a fully open example
3 sources · all primary
- ● Maryland Department of Transportation · DRAFT FY2027-FY2032 Consolidated Transportation Program, Maryland Transit Administration chapter (capital programme summary and 58 project pages with total estimated cost, expended through close year and six-year cash flow) (published 2026 · checked 2026-09-14)
- ● Maryland Department of Transportation · FINAL FY2026-FY2031 Consolidated Transportation Program, full report (the adopted six-year capital programme; MTA project pages at pp. MTA-1 onward) (published 2025 · checked 2026-09-14)
- ● eMaryland Marketplace Advantage (eMMA) · BPM054272 - MARC MP36PH3C Locomotive Overhaul CANCELLED, contract solicitation for the mid-life overhaul of the MARC MP36PH-3C locomotives, extended by Addendum 6 to the GP-40 fleet; RFP Double Envelope Proposal, Functional Area 1 / Round 9, status Closed, award status Cancelled, due and close date 9 September 2026. Fourteen attachment records; no value field, no Project Cost Class field and no cancellation-notice document on the record (published 2026-09-09 · checked 2026-09-14)
Related tenders
Same buyer first, then the same segment in this market.
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Light Rail Modernization Program Tranche 3 Cromwell Facility | MDOT MTA | Open | estimated cost class L: over $100 million, in MTA's own construction look-ahead of August 2026; MTA publishes no contract value | Published July 2026 |
| MDOT Freight Rail P3 concession Maryland and Delaware | MDOT MTA | Open | value not published - MDOT publishes no figure for the concession | |
| MTA Elevator Modernization design-build forty elevators | MDOT MTA | Bids closed | estimated cost class J: $50 million to $75 million, in MTA's own construction look-ahead of August 2026; MTA publishes no contract value |
Show all 6 related tenders
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Light Rail Metro Facilities Ancillary maintenance construction | MDOT MTA | Open | estimated cost class H: $15 million to $30 million, for the matching line in MTA's own on-call master contract look-ahead of August 2026; MTA publishes no contract value | |
| MARC Mechanical Ancillary maintenance construction master contract | MDOT MTA | Open | estimated cost class G: $10 million to $15 million, for the matching line in MTA's own on-call master contract look-ahead of August 2026; MTA publishes no contract value | |
| Metro SubwayLink Reisterstown Plaza East interlocking reconstruction | MDOT MTA | Bids closed | estimated cost class G: $10 million to $15 million, in MTA's own construction look-ahead of August 2026; MTA publishes no contract value | Bids closed September 2026 · award expected |
Browse: the Atlas · United States · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.