Tender · Planned
? How to use this page

How to use a tender page

  1. What is being bought, for how much, and what happens next.
  2. Next step tells you the procedure and where the notice is; Watch to follow deadlines and the award.
  3. Full scope, exact values, dates and bidders open with this market's edition, with a calendar export.

Light RailLink systems overhauls and replacements

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Buyer
Maryland Transit Administration
Where
Maryland · Baltimore
Segments
Electrification, Signalling, Telecoms
Technology areas
Signalling & train control, Digital operations
Status
Planned — The line fell from the adopted FY2026-FY2031 programme to the draft, because MTA reassigned the traction power substation major rehabilitation project to the Light Rail Modernization Program.
Value band
$25–100m
Currency
USD
Key dates (month)
Programme end 2032

Status in full

Read more

The line fell from the adopted FY2026-FY2031 programme to the draft, because MTA reassigned the traction power substation major rehabilitation project to the Light Rail Modernization Program. Two light rail systems solicitations sat below the market floor on eMMA in September 2026 and are not carried as records: the Light Rail CBD fibre replacement (BPM058041) and Metro T&C room power distribution (BPM058044), each at MTA's estimated cost class D. Both are named in full, with the other nine excluded records, in the market block's open-solicitations list.

Next step

Planned — target 2032.

Read the notice: Maryland Department of Transportation ↗

Withheld in the free surface

  • Full scope
  • Exact value
  • How the figure was arrived at
  • Key dates (1)
  • Published bidders

Full detail withheld: 5 fields. In the United States edition · See a fully open example

2 sources · all primary
  • ● Maryland Department of Transportation · DRAFT FY2027-FY2032 Consolidated Transportation Program, Maryland Transit Administration chapter (capital programme summary and 58 project pages with total estimated cost, expended through close year and six-year cash flow) (published 2026 · checked 2026-09-14)
  • ● Maryland Department of Transportation · FINAL FY2026-FY2031 Consolidated Transportation Program, full report (the adopted six-year capital programme; MTA project pages at pp. MTA-1 onward) (published 2025 · checked 2026-09-14)

Related tenders

Same buyer first, then the same segment in this market.

TenderBuyerStatusValue bandNext key date
Light Rail Modernization Program Tranche 3 Cromwell FacilityMDOT MTAOpenestimated cost class L: over $100 million, in MTA's own construction look-ahead of August 2026; MTA publishes no contract valuePublished July 2026
MDOT Freight Rail P3 concession Maryland and DelawareMDOT MTAOpenvalue not published - MDOT publishes no figure for the concession
MTA Elevator Modernization design-build forty elevatorsMDOT MTABids closedestimated cost class J: $50 million to $75 million, in MTA's own construction look-ahead of August 2026; MTA publishes no contract value
Show all 6 related tenders
TenderBuyerStatusValue bandNext key date
Light Rail Metro Facilities Ancillary maintenance constructionMDOT MTAOpenestimated cost class H: $15 million to $30 million, for the matching line in MTA's own on-call master contract look-ahead of August 2026; MTA publishes no contract value
MARC Mechanical Ancillary maintenance construction master contractMDOT MTAOpenestimated cost class G: $10 million to $15 million, for the matching line in MTA's own on-call master contract look-ahead of August 2026; MTA publishes no contract value
Metro SubwayLink Reisterstown Plaza East interlocking reconstructionMDOT MTABids closedestimated cost class G: $10 million to $15 million, in MTA's own construction look-ahead of August 2026; MTA publishes no contract valueBids closed September 2026 · award expected

Browse: the Atlas · United States · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.