? How to use this page
How to use a tender page
- What is being bought, for how much, and what happens next.
- Next step tells you the procedure and where the notice is; Watch to follow deadlines and the award.
- Full scope, exact values, dates and bidders open with this market's edition, with a calendar export.
Metro SubwayLink systems overhauls and replacements
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Buyer
- Maryland Transit Administration
- Where
- Maryland · Baltimore
- Segments
- Electrification, Signalling, Telecoms
- Technology areas
- Signalling & train control, Digital operations
- Status
- Planned — MTA records an increase with the addition of substation breaker refurbishment and the corrosion control programme, and a reduction in the funds for the tunnel stray current monitoring system for fiscal capacity reasons.
- Value band
- $25–100m
- Currency
- USD
- Key dates (month)
- Programme end 2032
Status in full
Read more
MTA records an increase with the addition of substation breaker refurbishment and the corrosion control programme, and a reduction in the funds for the tunnel stray current monitoring system for fiscal capacity reasons. MTA's construction look-ahead carries several Metro systems items for advertisement in 2026 and 2027, among them T&C Room Power Distribution and Substation ETS Installation, both at an estimated cost class and therefore below the market floor.
Next step
Withheld in the free surface
- Full scope
- Exact value
- How the figure was arrived at
- Key dates (1)
- Published bidders
Full detail withheld: 5 fields. In the United States edition · See a fully open example
3 sources · all primary
- ● Maryland Department of Transportation · DRAFT FY2027-FY2032 Consolidated Transportation Program, Maryland Transit Administration chapter (capital programme summary and 58 project pages with total estimated cost, expended through close year and six-year cash flow) (published 2026 · checked 2026-09-14)
- ● Maryland Department of Transportation · FINAL FY2026-FY2031 Consolidated Transportation Program, full report (the adopted six-year capital programme; MTA project pages at pp. MTA-1 onward) (published 2025 · checked 2026-09-14)
- ● MDOT Maryland Transit Administration · Current and Upcoming Solicitations - Construction Contracts, August 2026 (look-ahead schedule with mode, project title, procurement method, estimated advertisement date, estimated notice to proceed and estimated cost class) (published 2026-08 · checked 2026-09-14)
Related tenders
Same buyer first, then the same segment in this market.
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Light Rail Modernization Program Tranche 3 Cromwell Facility | MDOT MTA | Open | estimated cost class L: over $100 million, in MTA's own construction look-ahead of August 2026; MTA publishes no contract value | Published July 2026 |
| MDOT Freight Rail P3 concession Maryland and Delaware | MDOT MTA | Open | value not published - MDOT publishes no figure for the concession | |
| MTA Elevator Modernization design-build forty elevators | MDOT MTA | Bids closed | estimated cost class J: $50 million to $75 million, in MTA's own construction look-ahead of August 2026; MTA publishes no contract value |
Show all 6 related tenders
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Light Rail Metro Facilities Ancillary maintenance construction | MDOT MTA | Open | estimated cost class H: $15 million to $30 million, for the matching line in MTA's own on-call master contract look-ahead of August 2026; MTA publishes no contract value | |
| MARC Mechanical Ancillary maintenance construction master contract | MDOT MTA | Open | estimated cost class G: $10 million to $15 million, for the matching line in MTA's own on-call master contract look-ahead of August 2026; MTA publishes no contract value | |
| Metro SubwayLink Reisterstown Plaza East interlocking reconstruction | MDOT MTA | Bids closed | estimated cost class G: $10 million to $15 million, in MTA's own construction look-ahead of August 2026; MTA publishes no contract value | Bids closed September 2026 · award expected |
Browse: the Atlas · United States · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.