European Union · Country
? How to use this page
How to use a region page
- Counts and the pipeline for this region come first; the tabs list its buyers, players and tenders.
- Cities on the map open their own pages.
- Capex, pipeline value and the market narrative open with this market's edition.
Luxembourg
9 buyers · 34 tenders · checked 2026-10-03
271 km network, CFL operator; nineteen lines ETCS Level 1, 25 kV 50 Hz electrified; public transport free since March 2020; five procedures open September.
Everything here is free. One market edition opens in full with one email. Open your free edition
0Metro systems operating
9Buyers tracked
34Tenders tracked
- Live pipeline
- About EUR 252m of published value across the 20 of the 34 records tracked here that carry a figure; fourteen records carry no value because the buyer publishes none, and one of those fourteen is the one procedure open on 14 September 2026 that clears the Atlas €5 million floor on its published scope. The total is the sum of one figure per record — the contract value the award notice publishes, or the procedure estimate where the procedure closed without an award — and comes to EUR 251,766,802.92, counting at EUR 5,430,779.82 the one record whose award notice prints that figure in three fields and a ten-times-larger transcription of the same digits in a fourth. The largest single figure is the EUR 53,521,280 interlocking contract for Bettembourg and Dudelange, then EUR 44,234,281.44 for the Howald platform and marshalling-yard package, EUR 18,693,817.42 for the Rodange depot design and EUR 16,832,878.01 for the Hollerich station design. Against that, the State published programme values the contracts sit inside are far larger: EUR 292,013,570 excluding VAT for the new Luxembourg–Bettembourg line, EUR 98 million from the Fonds du Rail for Ettelbruck, and statutory ceilings of EUR 114,900,000 and EUR 99,100,000 for the two tram extensions
- Technology areas
- Track & civil, Electrification, Signalling & train control, Rolling-stock hardware, Digital operations, Predictive maintenance, Cybersecurity
Key figures
Luxembourg's railway lines and…271 km · 262 km electrified
3 sources · all primary
- ● Eurostat, rail_if_line_na — Luxembourg · Length of electric and non-electric railway lines by nature of transport, read through the Eurostat dissemination API on 14 September 2026. Luxembourg 2024: total lines 271 km, of which electrified 262 km and non-electrified 9 km; by nature of transport, 237 km passengers and freight, 0 km passengers only and 34 km freight only, of which 25 km of the freight-only lines are electrified and 9 km are not (published 2026 · checked 2026-09-14)
- ● Network Statement 2027 (DRR 2027), Administration des chemins de fer · 220-page English network statement, version 1.0 of 19 September 2025 (Appendix 2A dated 22 September 2025), published by the ACF and downloaded as a 7.33 MB PDF, HTTP 200, on 14 September 2026. Section 1.1: 'In accordance with the modified law of 6 June 2019 relating to the management, access, and use of the railway infrastructure and the regulation of the railway market, the Railway Administration ACF exercises the functions of the pricing body and capacity allocation of the national rail infrastructure. The National Railway infrastructure is managed for the state of Luxembourg by the Societe Nationale des Chemins de Fer Luxembourgeois ... in accordance with the Grand Duchy regulation of 6 November 2009 about the management contract of the railway infrastructure's approval and the collective convention on the building management dependent on the railway infrastructure signed on 7th May 2009 between the State and the Societe Nationale des Chemins de Fer Luxembourgeois. The CFL, as an infrastructure manager, is therefore, among other things, responsible for traffic regulations.' Section 1.3.3: 'The function of the independent national regulatory body for the railway sector will be fulfilled by l'Institut Luxembourgeois de Regulation (ILR).' Section 2.3.1 track typologies: single track 100.319 km, double track 160.327 km, multiple tracks 0 km. Section 2.3.2: 'The entire national rail network is standard gauge, e=1435mm.' Section 2.3.5: all lines category D4, 22.5 t per axle and 8.0 t per metre. Section 2.3.8: passenger trains at most 16 vehicles, 64 axles, 800 tonnes and 430 m; freight trains never above 850 m. Section 2.3.12: 'CFL commissioned the GSM-R digital mobile radio network on December 9, 2018.' Section 5.3.2.2: the unit charge directly attributable to operating a train path is EUR 2.771 per train-km for 2026 against EUR 2.651 for 2025, all prices excluding VAT; section 5.3.2.3 states 'Lines declared to be saturated: none'. Section 7.2 lists the service-facility categories and points to the Rail Facilities Portal. Appendix 2A carries a data sheet per line for twenty lines (1, 1a, 1b, 2b, 3, 4, 5, 6, 6a, 6b, 6c, 6d, 6e, 6f, 6g, 6h, 6j, 6k, 7, 8); nineteen of them give the speed control system as ETCS L1 (line 4 is written 'ETCS Level 1'), and line 6e Esch/Alzette-Audun-le-Tiche, 2.7 km of single track limited to 40 km/h, gives it as ETCS L0. Nineteen lines are electrified at 25 kV or 2x25 kV AC 50 Hz; line 2b Ettelbruck-Bissen, 8.7 km of single track, gives Traction Energy 'System none'. Published contact desks: ACF Division Sillons Guichet Unique, 1 Porte de France, L-4360 Esch-sur-Alzette, +352 261912 23, oss@acf.etat.lu; ACF Division Interoperabilite et Securite, +352 261912 35 or 33, vehicle-authorisation@acf.etat.lu; ACF Division Interoperabilite et Securite ferroviaire, +352 261912 27, certification@acf.etat.lu; network-statement enquiries projets.europe@acf.etat.lu; ILR Service Ferroviaire, 17 rue du Fosse, L-1536 Luxembourg, +352 28 228 228, fax +352 28 228 229, ferroviaire@ilr.lu; licensing information at Ministere de la Mobilite et des Travaux publics, Departement des transports, L-2938 Luxembourg, +352 247-84400, info@mt.public.lu; CFL Direction Gestion Infrastructure, B.P. 1803, L-1018 Luxembourg, +352 2489 4512, GI.Courrier@cfl.lu; CFL Direction Gestion Infrastructure Division Planification Exploitation GI-PE4, +352 2489 5464, gi.ate@cfl.lu; CFL Service Exploitation Infrastructure Supervision Trafic, 16 route de Thionville, L-2610 Luxembourg, +352 2489 3335, ei.supervisiontrafic@cfl.lu; CFL terminals s.a., Terminal Intermodal, Z.A.E. Wolser E, L-3474 Dudelange, +352 4996 0108, access@cfl-terminals.lu and info@cfl-terminals.lu; Societe du Port de Mertert S.A., L-6688 Mertert, +352 74 04 64, info@portmertert.lu. Section 1.7 records that the national network is part of the North Sea-Rhine-Mediterranean rail freight corridor and that the ACF is a member of RailNetEurope (published 2025-09-19 · checked 2026-09-14)
- ● CFL Group — Chiffres cles (2025) · The group's own key-figures page at groupe.cfl.lu, read 14 September 2026, headed 'Chiffres cles (2025)'. Infrastructure management: 628 km de voies ferrees principales; 68 gares et arrets; '100% Equipement ETCS reseau ferre luxembourgeois'; 27 gares et arrets labellises EUREWELCOME; '382,6 mio. EUR (TVAC) Investissements de l'Etat dans l'infrastructure'; 1,000 trains per day Monday to Friday; 1,175 aiguillages; 26 tunnels. Passenger activity: 89.60 per cent punctuality of passenger trains on the CFL network; 31.4 million passengers carried per year; 68 stations and stops; 547 million passenger-km; '100 %' ETCS equipment; 3.34 million bus passengers; 293,993 seats; 83 buses, 38 locomotives, 63 multiple units. Employer: 5,345 group staff, 353,668 training hours, 466 hires, 84.10 per cent men and 15.90 per cent women (published 2026 · checked 2026-09-14)
Luxembourg is a 25 kV 50 Hz alt…25 kV 50 Hz AC · 19 of 20 lines
2 sources · all primary
- ● Network Statement 2027 (DRR 2027), Administration des chemins de fer · 220-page English network statement, version 1.0 of 19 September 2025 (Appendix 2A dated 22 September 2025), published by the ACF and downloaded as a 7.33 MB PDF, HTTP 200, on 14 September 2026. Section 1.1: 'In accordance with the modified law of 6 June 2019 relating to the management, access, and use of the railway infrastructure and the regulation of the railway market, the Railway Administration ACF exercises the functions of the pricing body and capacity allocation of the national rail infrastructure. The National Railway infrastructure is managed for the state of Luxembourg by the Societe Nationale des Chemins de Fer Luxembourgeois ... in accordance with the Grand Duchy regulation of 6 November 2009 about the management contract of the railway infrastructure's approval and the collective convention on the building management dependent on the railway infrastructure signed on 7th May 2009 between the State and the Societe Nationale des Chemins de Fer Luxembourgeois. The CFL, as an infrastructure manager, is therefore, among other things, responsible for traffic regulations.' Section 1.3.3: 'The function of the independent national regulatory body for the railway sector will be fulfilled by l'Institut Luxembourgeois de Regulation (ILR).' Section 2.3.1 track typologies: single track 100.319 km, double track 160.327 km, multiple tracks 0 km. Section 2.3.2: 'The entire national rail network is standard gauge, e=1435mm.' Section 2.3.5: all lines category D4, 22.5 t per axle and 8.0 t per metre. Section 2.3.8: passenger trains at most 16 vehicles, 64 axles, 800 tonnes and 430 m; freight trains never above 850 m. Section 2.3.12: 'CFL commissioned the GSM-R digital mobile radio network on December 9, 2018.' Section 5.3.2.2: the unit charge directly attributable to operating a train path is EUR 2.771 per train-km for 2026 against EUR 2.651 for 2025, all prices excluding VAT; section 5.3.2.3 states 'Lines declared to be saturated: none'. Section 7.2 lists the service-facility categories and points to the Rail Facilities Portal. Appendix 2A carries a data sheet per line for twenty lines (1, 1a, 1b, 2b, 3, 4, 5, 6, 6a, 6b, 6c, 6d, 6e, 6f, 6g, 6h, 6j, 6k, 7, 8); nineteen of them give the speed control system as ETCS L1 (line 4 is written 'ETCS Level 1'), and line 6e Esch/Alzette-Audun-le-Tiche, 2.7 km of single track limited to 40 km/h, gives it as ETCS L0. Nineteen lines are electrified at 25 kV or 2x25 kV AC 50 Hz; line 2b Ettelbruck-Bissen, 8.7 km of single track, gives Traction Energy 'System none'. Published contact desks: ACF Division Sillons Guichet Unique, 1 Porte de France, L-4360 Esch-sur-Alzette, +352 261912 23, oss@acf.etat.lu; ACF Division Interoperabilite et Securite, +352 261912 35 or 33, vehicle-authorisation@acf.etat.lu; ACF Division Interoperabilite et Securite ferroviaire, +352 261912 27, certification@acf.etat.lu; network-statement enquiries projets.europe@acf.etat.lu; ILR Service Ferroviaire, 17 rue du Fosse, L-1536 Luxembourg, +352 28 228 228, fax +352 28 228 229, ferroviaire@ilr.lu; licensing information at Ministere de la Mobilite et des Travaux publics, Departement des transports, L-2938 Luxembourg, +352 247-84400, info@mt.public.lu; CFL Direction Gestion Infrastructure, B.P. 1803, L-1018 Luxembourg, +352 2489 4512, GI.Courrier@cfl.lu; CFL Direction Gestion Infrastructure Division Planification Exploitation GI-PE4, +352 2489 5464, gi.ate@cfl.lu; CFL Service Exploitation Infrastructure Supervision Trafic, 16 route de Thionville, L-2610 Luxembourg, +352 2489 3335, ei.supervisiontrafic@cfl.lu; CFL terminals s.a., Terminal Intermodal, Z.A.E. Wolser E, L-3474 Dudelange, +352 4996 0108, access@cfl-terminals.lu and info@cfl-terminals.lu; Societe du Port de Mertert S.A., L-6688 Mertert, +352 74 04 64, info@portmertert.lu. Section 1.7 records that the national network is part of the North Sea-Rhine-Mediterranean rail freight corridor and that the ACF is a member of RailNetEurope (published 2025-09-19 · checked 2026-09-14)
- ● transports.public.lu — Eurocap-Rail · The ministry's own page, last modified 5 August 2024. Eurocap-Rail aims at the rail interconnection of the three European seat cities, Brussels, Luxembourg and Strasbourg; the Luxembourg interest lies chiefly in improving the line towards Brussels. The Commission placed the project on the priority TEN-T list on 1 October 2003, confirmed by the Transport Council on 5 December 2003. On the Brussels-Luxembourg section the line has been re-electrified at 25 kV 50 Hz AC in Luxembourg and the new signalling centre at Kleinbettingen station has entered service, that project having been subsidised by the Commission; in Belgium the line has been modernised and re-electrified between the Belgian-Luxembourg border and Namur, with seven curves improved, works complete between the border and Libramont and between Ciney and Namur and in progress between Libramont and Grupont and between Haversin and Ciney. CFL and SNCB are studying the operation of the line after the works (published 2024-08-05 · checked 2026-09-14)
CFL states flatly that 'depuis…ETCS Level 1 on 19 of 20 lines
4 sources · all primary
- ● CFL Group — projet European Train Control System (ETCS) · CFL's own project page, project start 2003, project end 2017, locality 'Tout le reseau': 'Depuis le 20 juillet 2017, l'entierete du reseau ferre luxembourgeois est equipee du systeme europeen de controle de trains ETCS niveau 1, autorise par l'Administration des Chemins de Fer.' The page describes the trackside balises and the on-board computer and DMI, and states 'La realisation du systeme ETCS sur le reseau ferre luxembourgeois a ete cofinancee par l'Union Europeenne' without naming a programme or a figure (published 2026 · checked 2026-09-14)
- ● CFL Group — Chiffres cles (2025) · The group's own key-figures page at groupe.cfl.lu, read 14 September 2026, headed 'Chiffres cles (2025)'. Infrastructure management: 628 km de voies ferrees principales; 68 gares et arrets; '100% Equipement ETCS reseau ferre luxembourgeois'; 27 gares et arrets labellises EUREWELCOME; '382,6 mio. EUR (TVAC) Investissements de l'Etat dans l'infrastructure'; 1,000 trains per day Monday to Friday; 1,175 aiguillages; 26 tunnels. Passenger activity: 89.60 per cent punctuality of passenger trains on the CFL network; 31.4 million passengers carried per year; 68 stations and stops; 547 million passenger-km; '100 %' ETCS equipment; 3.34 million bus passengers; 293,993 seats; 83 buses, 38 locomotives, 63 multiple units. Employer: 5,345 group staff, 353,668 training hours, 466 hires, 84.10 per cent men and 15.90 per cent women (published 2026 · checked 2026-09-14)
- ● Network Statement 2027 (DRR 2027), Administration des chemins de fer · 220-page English network statement, version 1.0 of 19 September 2025 (Appendix 2A dated 22 September 2025), published by the ACF and downloaded as a 7.33 MB PDF, HTTP 200, on 14 September 2026. Section 1.1: 'In accordance with the modified law of 6 June 2019 relating to the management, access, and use of the railway infrastructure and the regulation of the railway market, the Railway Administration ACF exercises the functions of the pricing body and capacity allocation of the national rail infrastructure. The National Railway infrastructure is managed for the state of Luxembourg by the Societe Nationale des Chemins de Fer Luxembourgeois ... in accordance with the Grand Duchy regulation of 6 November 2009 about the management contract of the railway infrastructure's approval and the collective convention on the building management dependent on the railway infrastructure signed on 7th May 2009 between the State and the Societe Nationale des Chemins de Fer Luxembourgeois. The CFL, as an infrastructure manager, is therefore, among other things, responsible for traffic regulations.' Section 1.3.3: 'The function of the independent national regulatory body for the railway sector will be fulfilled by l'Institut Luxembourgeois de Regulation (ILR).' Section 2.3.1 track typologies: single track 100.319 km, double track 160.327 km, multiple tracks 0 km. Section 2.3.2: 'The entire national rail network is standard gauge, e=1435mm.' Section 2.3.5: all lines category D4, 22.5 t per axle and 8.0 t per metre. Section 2.3.8: passenger trains at most 16 vehicles, 64 axles, 800 tonnes and 430 m; freight trains never above 850 m. Section 2.3.12: 'CFL commissioned the GSM-R digital mobile radio network on December 9, 2018.' Section 5.3.2.2: the unit charge directly attributable to operating a train path is EUR 2.771 per train-km for 2026 against EUR 2.651 for 2025, all prices excluding VAT; section 5.3.2.3 states 'Lines declared to be saturated: none'. Section 7.2 lists the service-facility categories and points to the Rail Facilities Portal. Appendix 2A carries a data sheet per line for twenty lines (1, 1a, 1b, 2b, 3, 4, 5, 6, 6a, 6b, 6c, 6d, 6e, 6f, 6g, 6h, 6j, 6k, 7, 8); nineteen of them give the speed control system as ETCS L1 (line 4 is written 'ETCS Level 1'), and line 6e Esch/Alzette-Audun-le-Tiche, 2.7 km of single track limited to 40 km/h, gives it as ETCS L0. Nineteen lines are electrified at 25 kV or 2x25 kV AC 50 Hz; line 2b Ettelbruck-Bissen, 8.7 km of single track, gives Traction Energy 'System none'. Published contact desks: ACF Division Sillons Guichet Unique, 1 Porte de France, L-4360 Esch-sur-Alzette, +352 261912 23, oss@acf.etat.lu; ACF Division Interoperabilite et Securite, +352 261912 35 or 33, vehicle-authorisation@acf.etat.lu; ACF Division Interoperabilite et Securite ferroviaire, +352 261912 27, certification@acf.etat.lu; network-statement enquiries projets.europe@acf.etat.lu; ILR Service Ferroviaire, 17 rue du Fosse, L-1536 Luxembourg, +352 28 228 228, fax +352 28 228 229, ferroviaire@ilr.lu; licensing information at Ministere de la Mobilite et des Travaux publics, Departement des transports, L-2938 Luxembourg, +352 247-84400, info@mt.public.lu; CFL Direction Gestion Infrastructure, B.P. 1803, L-1018 Luxembourg, +352 2489 4512, GI.Courrier@cfl.lu; CFL Direction Gestion Infrastructure Division Planification Exploitation GI-PE4, +352 2489 5464, gi.ate@cfl.lu; CFL Service Exploitation Infrastructure Supervision Trafic, 16 route de Thionville, L-2610 Luxembourg, +352 2489 3335, ei.supervisiontrafic@cfl.lu; CFL terminals s.a., Terminal Intermodal, Z.A.E. Wolser E, L-3474 Dudelange, +352 4996 0108, access@cfl-terminals.lu and info@cfl-terminals.lu; Societe du Port de Mertert S.A., L-6688 Mertert, +352 74 04 64, info@portmertert.lu. Section 1.7 records that the national network is part of the North Sea-Rhine-Mediterranean rail freight corridor and that the ACF is a member of RailNetEurope (published 2025-09-19 · checked 2026-09-14)
- ● TED notice 702761-2024 · Contract-award notice, CFL, 'Erneuerung der Stellwerke im Bahnhof Bettembourg'. Negotiated with prior call. total-value and BT-161-NoticeResult 53,521,280; winner-name and organisation-name-tenderer both 'Hitachi Rail GTS Deutschland'; winner-selection-status selec-w; LOT-0001; contract concluded 15 October 2024; internal reference 2402561. Lot description: 'Systementwicklung, Projektierung, Lieferung, Montage und Inbetriebnahme von integrierten Stellwerken mit zentralem ETCS Level 1 Full Supervision und vereinfachter Aussensignalisierung zur Neuausruestung der Bahnhoefe Bettembourg und Dudelange des luxemburgischen Eisenbahnnetzes, sowie Umbauten und der Lieferung und Reparatur von Ersatzteilen.' No subcontractor named (published 2024-11-18 · checked 2026-09-14)
Network parameters from the Net…1,435 mm · category D4 on every line · 850 m freight trains
1 source · primary
- ● Network Statement 2027 (DRR 2027), Administration des chemins de fer · 220-page English network statement, version 1.0 of 19 September 2025 (Appendix 2A dated 22 September 2025), published by the ACF and downloaded as a 7.33 MB PDF, HTTP 200, on 14 September 2026. Section 1.1: 'In accordance with the modified law of 6 June 2019 relating to the management, access, and use of the railway infrastructure and the regulation of the railway market, the Railway Administration ACF exercises the functions of the pricing body and capacity allocation of the national rail infrastructure. The National Railway infrastructure is managed for the state of Luxembourg by the Societe Nationale des Chemins de Fer Luxembourgeois ... in accordance with the Grand Duchy regulation of 6 November 2009 about the management contract of the railway infrastructure's approval and the collective convention on the building management dependent on the railway infrastructure signed on 7th May 2009 between the State and the Societe Nationale des Chemins de Fer Luxembourgeois. The CFL, as an infrastructure manager, is therefore, among other things, responsible for traffic regulations.' Section 1.3.3: 'The function of the independent national regulatory body for the railway sector will be fulfilled by l'Institut Luxembourgeois de Regulation (ILR).' Section 2.3.1 track typologies: single track 100.319 km, double track 160.327 km, multiple tracks 0 km. Section 2.3.2: 'The entire national rail network is standard gauge, e=1435mm.' Section 2.3.5: all lines category D4, 22.5 t per axle and 8.0 t per metre. Section 2.3.8: passenger trains at most 16 vehicles, 64 axles, 800 tonnes and 430 m; freight trains never above 850 m. Section 2.3.12: 'CFL commissioned the GSM-R digital mobile radio network on December 9, 2018.' Section 5.3.2.2: the unit charge directly attributable to operating a train path is EUR 2.771 per train-km for 2026 against EUR 2.651 for 2025, all prices excluding VAT; section 5.3.2.3 states 'Lines declared to be saturated: none'. Section 7.2 lists the service-facility categories and points to the Rail Facilities Portal. Appendix 2A carries a data sheet per line for twenty lines (1, 1a, 1b, 2b, 3, 4, 5, 6, 6a, 6b, 6c, 6d, 6e, 6f, 6g, 6h, 6j, 6k, 7, 8); nineteen of them give the speed control system as ETCS L1 (line 4 is written 'ETCS Level 1'), and line 6e Esch/Alzette-Audun-le-Tiche, 2.7 km of single track limited to 40 km/h, gives it as ETCS L0. Nineteen lines are electrified at 25 kV or 2x25 kV AC 50 Hz; line 2b Ettelbruck-Bissen, 8.7 km of single track, gives Traction Energy 'System none'. Published contact desks: ACF Division Sillons Guichet Unique, 1 Porte de France, L-4360 Esch-sur-Alzette, +352 261912 23, oss@acf.etat.lu; ACF Division Interoperabilite et Securite, +352 261912 35 or 33, vehicle-authorisation@acf.etat.lu; ACF Division Interoperabilite et Securite ferroviaire, +352 261912 27, certification@acf.etat.lu; network-statement enquiries projets.europe@acf.etat.lu; ILR Service Ferroviaire, 17 rue du Fosse, L-1536 Luxembourg, +352 28 228 228, fax +352 28 228 229, ferroviaire@ilr.lu; licensing information at Ministere de la Mobilite et des Travaux publics, Departement des transports, L-2938 Luxembourg, +352 247-84400, info@mt.public.lu; CFL Direction Gestion Infrastructure, B.P. 1803, L-1018 Luxembourg, +352 2489 4512, GI.Courrier@cfl.lu; CFL Direction Gestion Infrastructure Division Planification Exploitation GI-PE4, +352 2489 5464, gi.ate@cfl.lu; CFL Service Exploitation Infrastructure Supervision Trafic, 16 route de Thionville, L-2610 Luxembourg, +352 2489 3335, ei.supervisiontrafic@cfl.lu; CFL terminals s.a., Terminal Intermodal, Z.A.E. Wolser E, L-3474 Dudelange, +352 4996 0108, access@cfl-terminals.lu and info@cfl-terminals.lu; Societe du Port de Mertert S.A., L-6688 Mertert, +352 74 04 64, info@portmertert.lu. Section 1.7 records that the national network is part of the North Sea-Rhine-Mediterranean rail freight corridor and that the ACF is a member of RailNetEurope (published 2025-09-19 · checked 2026-09-14)
Luxembourg rail traffic in 2025…31.44m passengers · 7.30m tonnes
4 sources · all primary
- ● Eurostat, rail_pa_total — Luxembourg · Rail passengers transported, read through the Eurostat dissemination API on 14 September 2026. Luxembourg: 28,688 thousand passengers and 505 million passenger-km in 2023; 31,263 thousand and 556 million in 2024; 31,441 thousand and 547 million in 2025 (published 2026 · checked 2026-09-14)
- ● Eurostat, rail_go_total — Luxembourg · Rail freight transport, read through the Eurostat dissemination API on 14 September 2026. Luxembourg: 7,135 thousand tonnes and 228 million tonne-km in 2023; 6,689 thousand and 216 million in 2024; 7,299 thousand and 214 million in 2025 (published 2026 · checked 2026-09-14)
- ● CFL Group — Chiffres cles (2025) · The group's own key-figures page at groupe.cfl.lu, read 14 September 2026, headed 'Chiffres cles (2025)'. Infrastructure management: 628 km de voies ferrees principales; 68 gares et arrets; '100% Equipement ETCS reseau ferre luxembourgeois'; 27 gares et arrets labellises EUREWELCOME; '382,6 mio. EUR (TVAC) Investissements de l'Etat dans l'infrastructure'; 1,000 trains per day Monday to Friday; 1,175 aiguillages; 26 tunnels. Passenger activity: 89.60 per cent punctuality of passenger trains on the CFL network; 31.4 million passengers carried per year; 68 stations and stops; 547 million passenger-km; '100 %' ETCS equipment; 3.34 million bus passengers; 293,993 seats; 83 buses, 38 locomotives, 63 multiple units. Employer: 5,345 group staff, 353,668 training hours, 466 hires, 84.10 per cent men and 15.90 per cent women (published 2026 · checked 2026-09-14)
- ● CFL, press release on the 2025 annual report, 15 June 2026 · Four-page press release from the CFL Service Communication, 16 boulevard d'Avranches, L-1160 Luxembourg, dated Luxembourg, 15 June 2026, downloaded as a PDF on 14 September 2026. Investment: 'investissements propres a 158,9 millions d'euros notamment pour l'acquisition de nouveaux trains ou d'investissements dans l'infrastructure ferroviaire pour le compte du Fonds du rail a 327,1 millions d'euros'. Group finances: turnover EUR 1.311 billion in 2025 against EUR 1.215 billion in 2024, up 7.9 per cent; net result a record EUR 35.3 million against EUR 25.6 million. Staff 5,345 (5,199 in 2024) and 466 hires (503). Passengers: 31.4 million, up 0.6 per cent; punctuality 89.6 per cent against 90.8 per cent in 2024, 90.4 per cent excluding strikes on neighbouring networks, and 91.4 per cent over the first five months of 2026. Freight activities turnover EUR 291.3 million, up 3.7 per cent; Groupe CFL multimodal's first positive net result for many years at EUR 3.0 million (a loss of EUR 1.8 million in 2024); Groupe CFL cargo a record net result of EUR 13.3 million, up EUR 6.1 million; Lorry-Rail EUR 8.7 million and Groupe Luxport EUR 1.4 million. Rolling stock: 10 new Coradia trains entered service in 2025 and the full refurbishment of 10 TER2N-ng units was completed, with the other 11 decided; 'En juin 2026, 22 trains Coradia sont en service (17 de la serie 2400 avec 334 places assises par train et 5 de la serie 2450 avec 692 places par train)'; 'En 2025, les CFL ont finalise le cahier des charges en vue de la commande de la prochaine serie de nouveaux trains (serie 2500)'. Network: CFL worked on the network for 270 days in 2025 against 264 in 2024, and 'les deux parties ayant signe, fin 2025, un nouveau contrat de gestion de l'infrastructure ferroviaire pour la periode 2026 - 2040', allocating means on performance criteria and covering the daily management of 1,000 trains a day. Projects: the new Luxembourg-Bettembourg line, 'mise en service prevue a l'automne 2027', and the Howald mobility hub advanced substantially in 2025, a second platform was placed at Howald and the works at the south head of Luxembourg station were completed (published 2026-06-15 · checked 2026-09-14)
Public transport in Luxembourg…free since 1 March 2020
1 source · primary
- ● transports.public.lu — Train · The ministry's own page on rail passenger transport, last modified 18 September 2025: the train serves most of the territory on a star network centred on Luxembourg City with cross-border links to Germany, Belgium and France. 'Depuis le 1er mars 2020, les transports publics sont gratuits au Luxembourg, sur l'ensemble du territoire national, pour tous les modes de transport, qu'il s'agisse des bus, des trains (excepte 1e classe) ou des trams. Cette mesure s'applique aux residents, aux travailleurs transfrontaliers et aux touristes.' (published 2025-09-18 · checked 2026-09-14)
CFL's own 2025 figures for inve…€327.1m through the Fonds du Rail in 2025
2 sources · all primary
- ● CFL, press release on the 2025 annual report, 15 June 2026 · Four-page press release from the CFL Service Communication, 16 boulevard d'Avranches, L-1160 Luxembourg, dated Luxembourg, 15 June 2026, downloaded as a PDF on 14 September 2026. Investment: 'investissements propres a 158,9 millions d'euros notamment pour l'acquisition de nouveaux trains ou d'investissements dans l'infrastructure ferroviaire pour le compte du Fonds du rail a 327,1 millions d'euros'. Group finances: turnover EUR 1.311 billion in 2025 against EUR 1.215 billion in 2024, up 7.9 per cent; net result a record EUR 35.3 million against EUR 25.6 million. Staff 5,345 (5,199 in 2024) and 466 hires (503). Passengers: 31.4 million, up 0.6 per cent; punctuality 89.6 per cent against 90.8 per cent in 2024, 90.4 per cent excluding strikes on neighbouring networks, and 91.4 per cent over the first five months of 2026. Freight activities turnover EUR 291.3 million, up 3.7 per cent; Groupe CFL multimodal's first positive net result for many years at EUR 3.0 million (a loss of EUR 1.8 million in 2024); Groupe CFL cargo a record net result of EUR 13.3 million, up EUR 6.1 million; Lorry-Rail EUR 8.7 million and Groupe Luxport EUR 1.4 million. Rolling stock: 10 new Coradia trains entered service in 2025 and the full refurbishment of 10 TER2N-ng units was completed, with the other 11 decided; 'En juin 2026, 22 trains Coradia sont en service (17 de la serie 2400 avec 334 places assises par train et 5 de la serie 2450 avec 692 places par train)'; 'En 2025, les CFL ont finalise le cahier des charges en vue de la commande de la prochaine serie de nouveaux trains (serie 2500)'. Network: CFL worked on the network for 270 days in 2025 against 264 in 2024, and 'les deux parties ayant signe, fin 2025, un nouveau contrat de gestion de l'infrastructure ferroviaire pour la periode 2026 - 2040', allocating means on performance criteria and covering the daily management of 1,000 trains a day. Projects: the new Luxembourg-Bettembourg line, 'mise en service prevue a l'automne 2027', and the Howald mobility hub advanced substantially in 2025, a second platform was placed at Howald and the works at the south head of Luxembourg station were completed (published 2026-06-15 · checked 2026-09-14)
- ● CFL Group — Chiffres cles (2025) · The group's own key-figures page at groupe.cfl.lu, read 14 September 2026, headed 'Chiffres cles (2025)'. Infrastructure management: 628 km de voies ferrees principales; 68 gares et arrets; '100% Equipement ETCS reseau ferre luxembourgeois'; 27 gares et arrets labellises EUREWELCOME; '382,6 mio. EUR (TVAC) Investissements de l'Etat dans l'infrastructure'; 1,000 trains per day Monday to Friday; 1,175 aiguillages; 26 tunnels. Passenger activity: 89.60 per cent punctuality of passenger trains on the CFL network; 31.4 million passengers carried per year; 68 stations and stops; 547 million passenger-km; '100 %' ETCS equipment; 3.34 million bus passengers; 293,993 seats; 83 buses, 38 locomotives, 63 multiple units. Employer: 5,345 group staff, 353,668 training hours, 466 hires, 84.10 per cent men and 15.90 per cent women (published 2026 · checked 2026-09-14)
The ministry publishes programm…€292.0m new line · €98m + €38m Ettelbruck · €214.0m of voted tram ceilings
5 sources · all primary
- ● transports.public.lu — Nouvelle ligne ferroviaire Luxembourg-Bettembourg · The ministry's own project page. 'La nouvelle ligne ferroviaire entre Luxembourg et Bettembourg prevoit la construction en site propre d'un nouveau troncon de ligne a deux voies d'une longueur d'environ 7 km, sans arret intermediaire.' The route leaves the future Howald interchange, crosses the A3 motorway south of the Gasperich junction, runs west of it to Bettembourg, leaves the motorway north of the Berchem service area, passes under the RN31 and crosses the existing Luxembourg-Bettembourg line in the Alzette valley on a flyover, after which the new and existing lines run side by side to the north entrance of Bettembourg station; the crossing also requires the existing line to be shifted about thirty metres. Two structures are named as remarkable: OA14 at the A3 crossing south of Howald, and OA05/OA06, the flyover, at the crossing with the existing line north of Bettembourg. Chiffres-cles: 'Le cout du projet s'eleve a 292.013.570,- euros hTVA (indice 730,85 au 1er avril 2013)'; about 52 ha of land to acquire; maximum design speed 160 km/h; besides the rail platform with its track, catenary and signalling equipment the project includes one road underpass, one flyover, one railway bridge, four road bridges, six hydraulic structures, thirteen retention basins and one wildlife crossing. The page names the connected projects the design must accommodate: the future Howald interchange, the widening of the A3 to 2x3 lanes, the extension of the Berchem service area, the rebuilding of the N31 junction at Livange, the removal of level crossing PN4a in rue Lentz at Bettembourg, the future multimodal platform at Bettembourg and the new signalling centre at Bettembourg station (published 2026 · checked 2026-09-14)
- ● transports.public.lu — Reamenagement de la gare d'Ettelbruck · The ministry's own project page. The scheme has a road module for the Fonds des Routes managed by the Administration des Ponts et Chaussees — a new bus station and the rebuilding of the station quarter's streets, including putting the N7 national road underground and rebuilding the Patton bridge with dedicated bus and cycle lanes — and a rail module. The existing passenger building sits on the line of the cut-and-cover tunnel and is replaced. Chiffres-cles: passenger building gross floor area 3,791 m2; P+R capacity 430 spaces; 'Cout du projet: Fonds du Rail: 98 millions d'euros hTVA / Fonds des routes: 38 millions d'euros hTVA'; five platform tracks; twelve bus bays; 100 cycle spaces. Etat actuel: the passenger building has been demolished so that the Administration des ponts et chaussees can build the road underpass for the new N7, on top of which the new passenger building will be placed, part of it made available to the Police grand-ducale; a new platform and a new passenger subway have been built on the other side of the site and the track layout adapted; the existing platforms are then to be renewed and adapted for people with reduced mobility (published 2026 · checked 2026-09-14)
- ● Loi du 15 decembre 2017 portant sur la construction du prolongement de la ligne de tramway a Luxembourg entre la Gare Centrale et la station Cloche d'Or · Memorial A no 1076 of 18 December 2017, read as the official PDF on 14 September 2026. Article 1 authorises the Government to build the extension, including the works needed for the line infrastructure itself, the acquisition of tram vehicles, the studies and the related compensatory measures. Article 2: 'Les depenses engagees au titre du projet vise a l'article 1er ne peuvent pas depasser le montant de 114.900.000 euros. Ce montant correspond a la valeur 775,93 de l'indice semestriel des prix de la construction au 1er avril 2017.' The amount is adjusted half-yearly against that index after deduction of expenditure already committed. Article 4 declares the works to be in the public interest. Parliamentary document 7209, ordinary session 2017-2018 (published 2017-12-18 · checked 2026-09-14)
- ● Loi du 15 decembre 2017 portant sur la construction du prolongement de la ligne tramway a Luxembourg entre le Circuit de la Foire internationale et l'aeroport du Findel · Memorial A no 1077 of 18 December 2017, read as the official PDF on 14 September 2026. Article 1 authorises the Government to build the extension from the Circuit de la Foire Internationale in Luxembourg City to Findel airport in Niederanven, including the line infrastructure, the acquisition of tram vehicles, the studies and the related compensatory measures. Article 2: 'Les depenses engagees au titre du projet vise a l'article 1er ne peuvent pas depasser le montant de 99.100.000 euros. Ce montant correspond a la valeur 775,93 de l'indice semestriel des prix de la construction au 1er avril 2017.' Parliamentary document 7210, ordinary session 2017-2018 (published 2017-12-18 · checked 2026-09-14)
- ● transports.public.lu — Extensions du reseau du tram · The ministry's own project page, last modified 19 February 2026. 'Depuis le 02 mars 2025, le tram a Luxembourg-Ville circule sur la ligne 1 complete, circulant entre l'Aeroport et la Cloche d'Or.' Extension 1, in construction, is line K2A on the Kirchberg between the Pont Rouge and Luxexpo by way of the Kuebebierg. 'Une deuxieme extension, dont le projet de loi a ete approuve par le gouvernement fin 2025, est prevue sur la Route d'Arlon entre la Place de l'Etoile et le Centre hospitalier de Luxembourg (CHL). Ce projet majeur de 2,2 km incluera 4 arrets supplementaires ainsi un tunnel entre le CHL et l'actuel Stade Josy Barthel. Inscrit dans le Plan national de mobilite 2035, ce projet servira a delester le trafic dans l'ouest de la ville de Luxembourg. Une mise en service est prevue a l'horizon 2032.' The ministry is also working on an interurban fast tram between Luxembourg City and Esch-sur-Alzette for 2035. The page's legal references are the law of 15 December 2017 on the Gare Centrale-Cloche d'Or extension and the law of 15 December 2017 on the Circuit de la Foire internationale-Findel extension (published 2026-02-19 · checked 2026-09-14)
The Luxembourg City tram carrie…35.2m passengers · 2.00m tram-km in 2025
4 sources · all primary
- ● ACF, Rapport du tramway 2025 · Ten-page tram report, ACF activities plus Luxtram safety information, downloaded as a 477 KB PDF on 14 September 2026. Table 4, evolution of traffic: transport offer 1,005,883 km and 14,900,793 passengers in 2021; 1,118,131 km and 20,195,610 in 2022; 1,270,000 km and 28,700,000 in 2023; 1,460,000 km and 31,700,000 in 2024; 2,003,000 km and 35,200,000 in 2025. The report states that kilometres run rose 37 per cent on 2024 and passengers 11 per cent. Collisions with third parties: 23 in 2025 against 14 in 2024, of which 17 involved vehicles; passenger events 9 against 5; emergency braking 108 against 126. Table 5 injuries in 2025: 14 in total, 10 slight, 4 serious, no deaths. The all-events rate per 10,000 km was 0.15 in 2025 against a STRMTG reference of 0.31 in 2024 (published 2026 · checked 2026-09-14)
- ● ACF, Rapport d'activite ferroviaire 2025 · 24-page activity report published by the ACF, downloaded as a 1.33 MB PDF, HTTP 200, on 14 September 2026. Table 1 lists the certified rail actors using the national rail network: CFL Gestionnaire Infrastructure (Luxembourg) holds a safety authorisation valid to 16.04.2028; CFL Entreprise ferroviaire (Luxembourg) a single safety certificate for passenger operations to 29.07.2029; CFL cargo S.A. (Luxembourg) a single safety certificate for freight to 28.10.2026; LINEAS (Belgium) a single freight certificate to 18.03.2026; Hexafret (France) a single freight certificate to 27.10.2029. Chapter 4: the Sillons division handled 50,391 path orders in 2025, representing 319,887 train runs, with 1,353 no-shows of which 20 per cent passenger, 35 per cent freight and 45 per cent infrastructure manager; 56.6 per cent of path orders were cancellations; 1,004 medium- and short-term train notices and 8,223 very-short-term train notices were issued and 660 short-term works notices checked and validated. Of all train categories run, 58 per cent were passenger (V140 47 per cent, HPV140 11 per cent), 39 per cent freight and 3 per cent infrastructure-manager. Chapter 3: the two tram safety documents were renewed in 2022 for five years to 28.11.2027; no new tram was authorised in 2025; since 2017 the ACF has authorised 33 seven-section Urbos trams, one multifunction road-rail vehicle and one road-rail sweeper; on 28 February 2025 the ACF issued the entry-into-service authorisation for the structural subsystems of section E, Luxexpo to Findel Luxembourg Airport, under identification number LU 60 2025 5001, adding the stations 'Heienhaff P+R' and 'Findel-Luxembourg Airport' over 3.9 km and linking Kirchberg to the airport; 192 tram-driver licences have been issued since 2017. The ACF has held an ISO 9001 certificate since 2015, the current one valid 20.12.2024 to 10.12.2027 (published 2026 · checked 2026-09-14)
- ● Luxtram — Les chiffres du tram · Luxtram's own figures page, read 14 September 2026 and carrying no date of its own: '3.6 km Sans ligne aerienne de contact; 16 km Longueur du trace; 10 Poles d'echanges; 24 Stations; 33 Rames pour ligne de 16 km; 565 millions EUR Cout du projet; 15 Stations de tram sur le troncon qui relie Luxexpo a la Gare centrale, dont 5 poles d'echange' (published 2026 · checked 2026-09-14)
- ● transports.public.lu — Extensions du reseau du tram · The ministry's own project page, last modified 19 February 2026. 'Depuis le 02 mars 2025, le tram a Luxembourg-Ville circule sur la ligne 1 complete, circulant entre l'Aeroport et la Cloche d'Or.' Extension 1, in construction, is line K2A on the Kirchberg between the Pont Rouge and Luxexpo by way of the Kuebebierg. 'Une deuxieme extension, dont le projet de loi a ete approuve par le gouvernement fin 2025, est prevue sur la Route d'Arlon entre la Place de l'Etoile et le Centre hospitalier de Luxembourg (CHL). Ce projet majeur de 2,2 km incluera 4 arrets supplementaires ainsi un tunnel entre le CHL et l'actuel Stade Josy Barthel. Inscrit dans le Plan national de mobilite 2035, ce projet servira a delester le trafic dans l'ouest de la ville de Luxembourg. Une mise en service est prevue a l'horizon 2032.' The ministry is also working on an interurban fast tram between Luxembourg City and Esch-sur-Alzette for 2035. The page's legal references are the law of 15 December 2017 on the Gare Centrale-Cloche d'Or extension and the law of 15 December 2017 on the Circuit de la Foire internationale-Findel extension (published 2026-02-19 · checked 2026-09-14)
The Administration des chemins…50,391 path orders · 319,887 train runs in 2025
2 sources · all primary
- ● ACF, Rapport d'activite ferroviaire 2025 · 24-page activity report published by the ACF, downloaded as a 1.33 MB PDF, HTTP 200, on 14 September 2026. Table 1 lists the certified rail actors using the national rail network: CFL Gestionnaire Infrastructure (Luxembourg) holds a safety authorisation valid to 16.04.2028; CFL Entreprise ferroviaire (Luxembourg) a single safety certificate for passenger operations to 29.07.2029; CFL cargo S.A. (Luxembourg) a single safety certificate for freight to 28.10.2026; LINEAS (Belgium) a single freight certificate to 18.03.2026; Hexafret (France) a single freight certificate to 27.10.2029. Chapter 4: the Sillons division handled 50,391 path orders in 2025, representing 319,887 train runs, with 1,353 no-shows of which 20 per cent passenger, 35 per cent freight and 45 per cent infrastructure manager; 56.6 per cent of path orders were cancellations; 1,004 medium- and short-term train notices and 8,223 very-short-term train notices were issued and 660 short-term works notices checked and validated. Of all train categories run, 58 per cent were passenger (V140 47 per cent, HPV140 11 per cent), 39 per cent freight and 3 per cent infrastructure-manager. Chapter 3: the two tram safety documents were renewed in 2022 for five years to 28.11.2027; no new tram was authorised in 2025; since 2017 the ACF has authorised 33 seven-section Urbos trams, one multifunction road-rail vehicle and one road-rail sweeper; on 28 February 2025 the ACF issued the entry-into-service authorisation for the structural subsystems of section E, Luxexpo to Findel Luxembourg Airport, under identification number LU 60 2025 5001, adding the stations 'Heienhaff P+R' and 'Findel-Luxembourg Airport' over 3.9 km and linking Kirchberg to the airport; 192 tram-driver licences have been issued since 2017. The ACF has held an ISO 9001 certificate since 2015, the current one valid 20.12.2024 to 10.12.2027 (published 2026 · checked 2026-09-14)
- ● Network Statement 2027 (DRR 2027), Administration des chemins de fer · 220-page English network statement, version 1.0 of 19 September 2025 (Appendix 2A dated 22 September 2025), published by the ACF and downloaded as a 7.33 MB PDF, HTTP 200, on 14 September 2026. Section 1.1: 'In accordance with the modified law of 6 June 2019 relating to the management, access, and use of the railway infrastructure and the regulation of the railway market, the Railway Administration ACF exercises the functions of the pricing body and capacity allocation of the national rail infrastructure. The National Railway infrastructure is managed for the state of Luxembourg by the Societe Nationale des Chemins de Fer Luxembourgeois ... in accordance with the Grand Duchy regulation of 6 November 2009 about the management contract of the railway infrastructure's approval and the collective convention on the building management dependent on the railway infrastructure signed on 7th May 2009 between the State and the Societe Nationale des Chemins de Fer Luxembourgeois. The CFL, as an infrastructure manager, is therefore, among other things, responsible for traffic regulations.' Section 1.3.3: 'The function of the independent national regulatory body for the railway sector will be fulfilled by l'Institut Luxembourgeois de Regulation (ILR).' Section 2.3.1 track typologies: single track 100.319 km, double track 160.327 km, multiple tracks 0 km. Section 2.3.2: 'The entire national rail network is standard gauge, e=1435mm.' Section 2.3.5: all lines category D4, 22.5 t per axle and 8.0 t per metre. Section 2.3.8: passenger trains at most 16 vehicles, 64 axles, 800 tonnes and 430 m; freight trains never above 850 m. Section 2.3.12: 'CFL commissioned the GSM-R digital mobile radio network on December 9, 2018.' Section 5.3.2.2: the unit charge directly attributable to operating a train path is EUR 2.771 per train-km for 2026 against EUR 2.651 for 2025, all prices excluding VAT; section 5.3.2.3 states 'Lines declared to be saturated: none'. Section 7.2 lists the service-facility categories and points to the Rail Facilities Portal. Appendix 2A carries a data sheet per line for twenty lines (1, 1a, 1b, 2b, 3, 4, 5, 6, 6a, 6b, 6c, 6d, 6e, 6f, 6g, 6h, 6j, 6k, 7, 8); nineteen of them give the speed control system as ETCS L1 (line 4 is written 'ETCS Level 1'), and line 6e Esch/Alzette-Audun-le-Tiche, 2.7 km of single track limited to 40 km/h, gives it as ETCS L0. Nineteen lines are electrified at 25 kV or 2x25 kV AC 50 Hz; line 2b Ettelbruck-Bissen, 8.7 km of single track, gives Traction Energy 'System none'. Published contact desks: ACF Division Sillons Guichet Unique, 1 Porte de France, L-4360 Esch-sur-Alzette, +352 261912 23, oss@acf.etat.lu; ACF Division Interoperabilite et Securite, +352 261912 35 or 33, vehicle-authorisation@acf.etat.lu; ACF Division Interoperabilite et Securite ferroviaire, +352 261912 27, certification@acf.etat.lu; network-statement enquiries projets.europe@acf.etat.lu; ILR Service Ferroviaire, 17 rue du Fosse, L-1536 Luxembourg, +352 28 228 228, fax +352 28 228 229, ferroviaire@ilr.lu; licensing information at Ministere de la Mobilite et des Travaux publics, Departement des transports, L-2938 Luxembourg, +352 247-84400, info@mt.public.lu; CFL Direction Gestion Infrastructure, B.P. 1803, L-1018 Luxembourg, +352 2489 4512, GI.Courrier@cfl.lu; CFL Direction Gestion Infrastructure Division Planification Exploitation GI-PE4, +352 2489 5464, gi.ate@cfl.lu; CFL Service Exploitation Infrastructure Supervision Trafic, 16 route de Thionville, L-2610 Luxembourg, +352 2489 3335, ei.supervisiontrafic@cfl.lu; CFL terminals s.a., Terminal Intermodal, Z.A.E. Wolser E, L-3474 Dudelange, +352 4996 0108, access@cfl-terminals.lu and info@cfl-terminals.lu; Societe du Port de Mertert S.A., L-6688 Mertert, +352 74 04 64, info@portmertert.lu. Section 1.7 records that the national network is part of the North Sea-Rhine-Mediterranean rail freight corridor and that the ACF is a member of RailNetEurope (published 2025-09-19 · checked 2026-09-14)
The whole of the Luxembourg rai…five certified rail actors
2 sources · all primary
- ● ACF, Rapport d'activite ferroviaire 2025 · 24-page activity report published by the ACF, downloaded as a 1.33 MB PDF, HTTP 200, on 14 September 2026. Table 1 lists the certified rail actors using the national rail network: CFL Gestionnaire Infrastructure (Luxembourg) holds a safety authorisation valid to 16.04.2028; CFL Entreprise ferroviaire (Luxembourg) a single safety certificate for passenger operations to 29.07.2029; CFL cargo S.A. (Luxembourg) a single safety certificate for freight to 28.10.2026; LINEAS (Belgium) a single freight certificate to 18.03.2026; Hexafret (France) a single freight certificate to 27.10.2029. Chapter 4: the Sillons division handled 50,391 path orders in 2025, representing 319,887 train runs, with 1,353 no-shows of which 20 per cent passenger, 35 per cent freight and 45 per cent infrastructure manager; 56.6 per cent of path orders were cancellations; 1,004 medium- and short-term train notices and 8,223 very-short-term train notices were issued and 660 short-term works notices checked and validated. Of all train categories run, 58 per cent were passenger (V140 47 per cent, HPV140 11 per cent), 39 per cent freight and 3 per cent infrastructure-manager. Chapter 3: the two tram safety documents were renewed in 2022 for five years to 28.11.2027; no new tram was authorised in 2025; since 2017 the ACF has authorised 33 seven-section Urbos trams, one multifunction road-rail vehicle and one road-rail sweeper; on 28 February 2025 the ACF issued the entry-into-service authorisation for the structural subsystems of section E, Luxexpo to Findel Luxembourg Airport, under identification number LU 60 2025 5001, adding the stations 'Heienhaff P+R' and 'Findel-Luxembourg Airport' over 3.9 km and linking Kirchberg to the airport; 192 tram-driver licences have been issued since 2017. The ACF has held an ISO 9001 certificate since 2015, the current one valid 20.12.2024 to 10.12.2027 (published 2026 · checked 2026-09-14)
- ● transports.public.lu — Train · The ministry's own page on rail passenger transport, last modified 18 September 2025: the train serves most of the territory on a star network centred on Luxembourg City with cross-border links to Germany, Belgium and France. 'Depuis le 1er mars 2020, les transports publics sont gratuits au Luxembourg, sur l'ensemble du territoire national, pour tous les modes de transport, qu'il s'agisse des bus, des trains (excepte 1e classe) ou des trams. Cette mesure s'applique aux residents, aux travailleurs transfrontaliers et aux touristes.' (published 2025-09-18 · checked 2026-09-14)
Buyers
| Buyer | Type | Tenders | Contracts awarded |
|---|---|---|---|
| CFL — Direction Gestion Infrastructure | Infrastructure manager | 27 | 6 |
| Luxtram S.A. | Metro corporation | 5 | 0 |
| Société Nationale des Chemins de Fer Luxembourgeois | National operator | 2 | 0 |
| Administration des chemins de fer | Regulator / standards | 0 | 0 |
| Administration des ponts et chaussées | State DOT | 0 | 0 |
| CFL cargo S.A. | National operator | 0 | 0 |
| CFL multimodal | Other | 0 | 0 |
| Institut Luxembourgeois de Régulation — Service Ferroviaire | Regulator / standards | 0 | 0 |
| Ministère de la Mobilité et des Travaux publics | National rail HQ | 0 | 0 |
Tenders
Cities
| City | Network status | Networks |
|---|---|---|
| Luxembourg City | operational — the hub of the star-shaped national network and the only city in the country with an urban rail mode. Luxembourg station is the origin, through point or terminus of every national and cross-border line; its platforms V and VI, 311 m and 253 m long, entered service in 2021 and the works at the south head finished in 2025. Tram line 1 has run complete between Findel airport and Cloche d'Or since 2 March 2025, and the K2A extension along boulevard Konrad Adenauer at the Kirchberg is under construction for the start of the 2027 school year. The new peripheral stations at Howald and Hollerich, the new Luxembourg–Bettembourg line and the second tram depot at Cloche d'Or are all being built here. Seat of CFL, Luxtram, the Ministry of Mobility and Public Works and the ILR | Luxembourg railway station and its west and south heads (CFL); Howald peripheral station and multimodal hub (CFL); Hollerich new peripheral station and mobility hub (CFL); Tram line 1, Findel–Cloche d'Or (Luxtram); Kirchberg 'neien Tramsschapp' depot and the Cloche d'Or depot under construction (Luxtram) |
| Bettembourg | operational — the freight and southern junction of the network and the busiest single worksite on it: the new Luxembourg–Bettembourg line reaches the north head here for autumn 2027, the interlockings of Bettembourg and Dudelange are being renewed with central ETCS Level 1 Full Supervision, a two-part flyover (structures OA1 and OA3) is being built south of the station, the north pedestrian subway has been rebuilt, and a new last-generation signalling centre is to be installed from 2029. The Dudelange/Bettembourg marshalling yard is being modernised and the Bettembourg-Dudelange intermodal terminal adjoins it | Bettembourg station and its north head (CFL); Dudelange/Bettembourg marshalling yard (CFL); Bettembourg flyover structures OA1 and OA3 (CFL) |
| Dudelange | operational — the Eurohub Sud logistics park and the Bettembourg-Dudelange intermodal terminal, the seat of CFL cargo and CFL multimodal and the point of contact the national network statement publishes for the container terminal and the shunting yard; published annual terminal capacity 600,000 intermodal transport units. Dudelange station is one of the two stations being re-equipped under the EUR 53.5 million interlocking contract | Bettembourg-Dudelange intermodal terminal, Eurohub Sud (CFL terminals / CFL multimodal); Dudelange station interlocking renewal (CFL) |
| Esch-sur-Alzette | operational — the second city and the head of the southern agglomeration, reached by line 6a from Bettembourg and line 6f from Pétange. CFL rebuilt the station's reception areas and platforms in 2025 and renewed the Bettembourg–Scheuerbusch tracks in spring 2026. Line 6e from Esch to Audun-le-Tiche in France is the one line on the national network the network statement gives as ETCS L0. The ministry is analysing a fast interurban tram between Esch-sur-Alzette and Luxembourg City along the A4 corridor for 2035, and the seat of the Administration des chemins de fer is here | Esch-sur-Alzette station (CFL); Line 6a Bettembourg–Esch-sur-Alzette; Line 6e Esch/Alzette–Audun-le-Tiche (cross-border, ETCS L0) |
| Ettelbruck | operational — the northern junction where line 1 to Troisvierges meets line 1a to Diekirch and line 2b to Bissen, and the anchor of the Nordstad development. The station is being rebuilt as a multimodal interchange in four modules to 2030 — compliance works, superstructure renewal, a 430-space park-and-ride and a new passenger building — at a published cost of EUR 98 million excluding VAT from the Fonds du Rail and EUR 38 million from the Fonds des Routes, with the N7 national road put underground beneath the new station building | Ettelbruck station and multimodal interchange (CFL / Administration des ponts et chaussées); Line 1a Ettelbruck–Diekirch; Line 2b Ettelbruck–Bissen, the one non-electrified line on the network |
| Rodange | operational — the south-western corner of the network, where lines 6g, 6h and 6j cross into Belgium at Aubange and Athus and into France at Mont-Saint-Martin. CFL is building the CRM Sud maintenance and stabling centre here, reconfiguring the west head of the station and putting up a new Poste Directeur Sud building, all designed under the EUR 18.69 million package awarded in 2024; the works packages for the new signalling centre at neighbouring Pétange were advertised in 2026 | Rodange station and its west head (CFL); CRM Sud maintenance and stabling centre (CFL); Poste Directeur Sud-Ouest at Pétange (CFL) |
| Troisvierges | operational — the northern terminus of line 1 and the last station before the Belgian border, where the 2x25 kV 50 Hz supply gives way to 25 kV to the Infrabel frontier. The station is being brought into compliance under four separate design missions awarded in 2026, two of them above the Atlas floor, covering platforms, rail formation, a bus station, a passenger building, canopies and accesses and a new infrastructure-maintenance site; CFL opened a 388-space park-and-ride here in 2025 | Troisvierges station (CFL); Line 1 Luxembourg–Troisvierges–border |
Players with a footprint here
| Player | Kind | Footprint |
|---|---|---|
| Swietelsky | Track & electrification contractor | Project presence |
| ArcelorMittal | Track technology supplier | Plant |
| ETF | Track & electrification contractor | Project presence |
Withheld in the free surface
- Capex in this region (3)
- Market narrative
Full detail withheld: 2 fields. In the European Union edition · See a fully open example
- Capex in this region (3)
- Market narrative
Full detail withheld: 2 fields. In the European Union edition · See a fully open example
Sources
- ● Administration des chemins de fer — Attributions et missions · Page last modified 25 May 2022. It sets out three distinct mandates. CHEMINS DE FER: 'Autorite en charge de la securite, de l'interoperabilite ferroviaire et de la certification des conducteurs de train', covering safety certification of railway undertakings and infrastructure managers, authorisation of subsystems, recognition of notified, designated and risk-assessment bodies, issue of train-driver licences, recognition of examiners, training centres, doctors and psychologists, supervision of railway undertakings and infrastructure managers, and register management. REPARTITION DES CAPACITES DU RESEAU, TARIFICATION ET FACTURATION DES SILLONS: 'Organisme independant de repartition, de tarification et de facturation des capacites de l'infrastructure ferroviaire', with the mission of guaranteeing every railway undertaking fair and non-discriminatory access to the infrastructure and preventing abuse of a dominant position. TRAMWAY: 'Autorite en charge de la securite pour les tramways', with the same family of tasks for tram undertakings and tram infrastructure managers. The page cites three laws: the law of 5 February 2021 on rail interoperability, rail safety and train-driver certification; the law of 6 June 2019 on the management, access to and use of rail infrastructure and the regulation of the rail market; and the law of 13 June 2017 on tram safety (published 2022 · checked 2026-09-14)
- ● Network Statement 2027 (DRR 2027), Administration des chemins de fer · 220-page English network statement, version 1.0 of 19 September 2025 (Appendix 2A dated 22 September 2025), published by the ACF and downloaded as a 7.33 MB PDF, HTTP 200, on 14 September 2026. Section 1.1: 'In accordance with the modified law of 6 June 2019 relating to the management, access, and use of the railway infrastructure and the regulation of the railway market, the Railway Administration ACF exercises the functions of the pricing body and capacity allocation of the national rail infrastructure. The National Railway infrastructure is managed for the state of Luxembourg by the Societe Nationale des Chemins de Fer Luxembourgeois ... in accordance with the Grand Duchy regulation of 6 November 2009 about the management contract of the railway infrastructure's approval and the collective convention on the building management dependent on the railway infrastructure signed on 7th May 2009 between the State and the Societe Nationale des Chemins de Fer Luxembourgeois. The CFL, as an infrastructure manager, is therefore, among other things, responsible for traffic regulations.' Section 1.3.3: 'The function of the independent national regulatory body for the railway sector will be fulfilled by l'Institut Luxembourgeois de Regulation (ILR).' Section 2.3.1 track typologies: single track 100.319 km, double track 160.327 km, multiple tracks 0 km. Section 2.3.2: 'The entire national rail network is standard gauge, e=1435mm.' Section 2.3.5: all lines category D4, 22.5 t per axle and 8.0 t per metre. Section 2.3.8: passenger trains at most 16 vehicles, 64 axles, 800 tonnes and 430 m; freight trains never above 850 m. Section 2.3.12: 'CFL commissioned the GSM-R digital mobile radio network on December 9, 2018.' Section 5.3.2.2: the unit charge directly attributable to operating a train path is EUR 2.771 per train-km for 2026 against EUR 2.651 for 2025, all prices excluding VAT; section 5.3.2.3 states 'Lines declared to be saturated: none'. Section 7.2 lists the service-facility categories and points to the Rail Facilities Portal. Appendix 2A carries a data sheet per line for twenty lines (1, 1a, 1b, 2b, 3, 4, 5, 6, 6a, 6b, 6c, 6d, 6e, 6f, 6g, 6h, 6j, 6k, 7, 8); nineteen of them give the speed control system as ETCS L1 (line 4 is written 'ETCS Level 1'), and line 6e Esch/Alzette-Audun-le-Tiche, 2.7 km of single track limited to 40 km/h, gives it as ETCS L0. Nineteen lines are electrified at 25 kV or 2x25 kV AC 50 Hz; line 2b Ettelbruck-Bissen, 8.7 km of single track, gives Traction Energy 'System none'. Published contact desks: ACF Division Sillons Guichet Unique, 1 Porte de France, L-4360 Esch-sur-Alzette, +352 261912 23, oss@acf.etat.lu; ACF Division Interoperabilite et Securite, +352 261912 35 or 33, vehicle-authorisation@acf.etat.lu; ACF Division Interoperabilite et Securite ferroviaire, +352 261912 27, certification@acf.etat.lu; network-statement enquiries projets.europe@acf.etat.lu; ILR Service Ferroviaire, 17 rue du Fosse, L-1536 Luxembourg, +352 28 228 228, fax +352 28 228 229, ferroviaire@ilr.lu; licensing information at Ministere de la Mobilite et des Travaux publics, Departement des transports, L-2938 Luxembourg, +352 247-84400, info@mt.public.lu; CFL Direction Gestion Infrastructure, B.P. 1803, L-1018 Luxembourg, +352 2489 4512, GI.Courrier@cfl.lu; CFL Direction Gestion Infrastructure Division Planification Exploitation GI-PE4, +352 2489 5464, gi.ate@cfl.lu; CFL Service Exploitation Infrastructure Supervision Trafic, 16 route de Thionville, L-2610 Luxembourg, +352 2489 3335, ei.supervisiontrafic@cfl.lu; CFL terminals s.a., Terminal Intermodal, Z.A.E. Wolser E, L-3474 Dudelange, +352 4996 0108, access@cfl-terminals.lu and info@cfl-terminals.lu; Societe du Port de Mertert S.A., L-6688 Mertert, +352 74 04 64, info@portmertert.lu. Section 1.7 records that the national network is part of the North Sea-Rhine-Mediterranean rail freight corridor and that the ACF is a member of RailNetEurope (published 2025-09-19 · checked 2026-09-14)
- ● ACF, Rapport d'activite ferroviaire 2025 · 24-page activity report published by the ACF, downloaded as a 1.33 MB PDF, HTTP 200, on 14 September 2026. Table 1 lists the certified rail actors using the national rail network: CFL Gestionnaire Infrastructure (Luxembourg) holds a safety authorisation valid to 16.04.2028; CFL Entreprise ferroviaire (Luxembourg) a single safety certificate for passenger operations to 29.07.2029; CFL cargo S.A. (Luxembourg) a single safety certificate for freight to 28.10.2026; LINEAS (Belgium) a single freight certificate to 18.03.2026; Hexafret (France) a single freight certificate to 27.10.2029. Chapter 4: the Sillons division handled 50,391 path orders in 2025, representing 319,887 train runs, with 1,353 no-shows of which 20 per cent passenger, 35 per cent freight and 45 per cent infrastructure manager; 56.6 per cent of path orders were cancellations; 1,004 medium- and short-term train notices and 8,223 very-short-term train notices were issued and 660 short-term works notices checked and validated. Of all train categories run, 58 per cent were passenger (V140 47 per cent, HPV140 11 per cent), 39 per cent freight and 3 per cent infrastructure-manager. Chapter 3: the two tram safety documents were renewed in 2022 for five years to 28.11.2027; no new tram was authorised in 2025; since 2017 the ACF has authorised 33 seven-section Urbos trams, one multifunction road-rail vehicle and one road-rail sweeper; on 28 February 2025 the ACF issued the entry-into-service authorisation for the structural subsystems of section E, Luxexpo to Findel Luxembourg Airport, under identification number LU 60 2025 5001, adding the stations 'Heienhaff P+R' and 'Findel-Luxembourg Airport' over 3.9 km and linking Kirchberg to the airport; 192 tram-driver licences have been issued since 2017. The ACF has held an ISO 9001 certificate since 2015, the current one valid 20.12.2024 to 10.12.2027 (published 2026 · checked 2026-09-14)
- ● CFL Group — Chiffres cles (2025) · The group's own key-figures page at groupe.cfl.lu, read 14 September 2026, headed 'Chiffres cles (2025)'. Infrastructure management: 628 km de voies ferrees principales; 68 gares et arrets; '100% Equipement ETCS reseau ferre luxembourgeois'; 27 gares et arrets labellises EUREWELCOME; '382,6 mio. EUR (TVAC) Investissements de l'Etat dans l'infrastructure'; 1,000 trains per day Monday to Friday; 1,175 aiguillages; 26 tunnels. Passenger activity: 89.60 per cent punctuality of passenger trains on the CFL network; 31.4 million passengers carried per year; 68 stations and stops; 547 million passenger-km; '100 %' ETCS equipment; 3.34 million bus passengers; 293,993 seats; 83 buses, 38 locomotives, 63 multiple units. Employer: 5,345 group staff, 353,668 training hours, 466 hires, 84.10 per cent men and 15.90 per cent women (published 2026 · checked 2026-09-14)
- ● CFL Group — projet Gare Bettembourg : les suites · CFL's own forthcoming-projects page. 'Avec la mise en service de la nouvelle ligne Luxembourg - Bettembourg en septembre 2027, la circulation des trains des lignes Luxembourg Esch/Alzette - Rodange et Luxembourg - Thionville - Metz se fera de maniere independante avec deux voies dediees par ligne.' Control of the new line's infrastructure will initially be exercised from the Luxembourg signalling centre 'en attendant qu'un nouveau poste directeur de derniere generation soit installe a partir de 2029', replacing the present one dating from the 1980s, whose technology can no longer take additional control elements for new rail projects. From 2029 the new signalling centre will let CFL make full use of the new track installations north of Bettembourg station, and the Bettembourg interchange is then to be remodelled, including the construction of a new flyover (published 2026 · checked 2026-09-14)
- ● CFL, press release on the 2025 annual report, 15 June 2026 · Four-page press release from the CFL Service Communication, 16 boulevard d'Avranches, L-1160 Luxembourg, dated Luxembourg, 15 June 2026, downloaded as a PDF on 14 September 2026. Investment: 'investissements propres a 158,9 millions d'euros notamment pour l'acquisition de nouveaux trains ou d'investissements dans l'infrastructure ferroviaire pour le compte du Fonds du rail a 327,1 millions d'euros'. Group finances: turnover EUR 1.311 billion in 2025 against EUR 1.215 billion in 2024, up 7.9 per cent; net result a record EUR 35.3 million against EUR 25.6 million. Staff 5,345 (5,199 in 2024) and 466 hires (503). Passengers: 31.4 million, up 0.6 per cent; punctuality 89.6 per cent against 90.8 per cent in 2024, 90.4 per cent excluding strikes on neighbouring networks, and 91.4 per cent over the first five months of 2026. Freight activities turnover EUR 291.3 million, up 3.7 per cent; Groupe CFL multimodal's first positive net result for many years at EUR 3.0 million (a loss of EUR 1.8 million in 2024); Groupe CFL cargo a record net result of EUR 13.3 million, up EUR 6.1 million; Lorry-Rail EUR 8.7 million and Groupe Luxport EUR 1.4 million. Rolling stock: 10 new Coradia trains entered service in 2025 and the full refurbishment of 10 TER2N-ng units was completed, with the other 11 decided; 'En juin 2026, 22 trains Coradia sont en service (17 de la serie 2400 avec 334 places assises par train et 5 de la serie 2450 avec 692 places par train)'; 'En 2025, les CFL ont finalise le cahier des charges en vue de la commande de la prochaine serie de nouveaux trains (serie 2500)'. Network: CFL worked on the network for 270 days in 2025 against 264 in 2024, and 'les deux parties ayant signe, fin 2025, un nouveau contrat de gestion de l'infrastructure ferroviaire pour la periode 2026 - 2040', allocating means on performance criteria and covering the daily management of 1,000 trains a day. Projects: the new Luxembourg-Bettembourg line, 'mise en service prevue a l'automne 2027', and the Howald mobility hub advanced substantially in 2025, a second platform was placed at Howald and the works at the south head of Luxembourg station were completed (published 2026-06-15 · checked 2026-09-14)
- ● CFL Group — Qui sommes-nous · 'Creee en 1946, la Societe Nationale des Chemins de Fer Luxembourgeois fait aujourd'hui partie des principaux acteurs economiques du Grand-Duche, en tant qu'epine dorsale du transport en commun national et transfrontalier. Ses actionnaires sont le Grand-Duche de Luxembourg (94%), la Belgique (4%) et la France (2%). Fort d'un ensemble de nombreuses filiales dont 11 dans le domaine des activites fret et de plus de 4.900 collaborateurs, le Groupe CFL se positionne parmi les employeurs les plus importants du pays.' The page gives the group's three principal missions as passenger transport, railway infrastructure management and freight transport (published 2026 · checked 2026-09-14)
- ● TED notice 758114-2025 · Contract-award notice, CFL, rebuilding of the north pedestrian subway at Bettembourg station linking rue de la Gare to route de Mondorf under the tracks, widened for pedestrians and cyclists with ramps on both sides. total-value, BT-161-NoticeResult and BT-720-Tender all 5,431,724.37; winner Galere Lux (109922156); contract 5 September 2025; BT-759 4 tenders; internal reference 2401132 (published 2025-11-14 · checked 2026-09-14)
- ● TED notice 702761-2024 · Contract-award notice, CFL, 'Erneuerung der Stellwerke im Bahnhof Bettembourg'. Negotiated with prior call. total-value and BT-161-NoticeResult 53,521,280; winner-name and organisation-name-tenderer both 'Hitachi Rail GTS Deutschland'; winner-selection-status selec-w; LOT-0001; contract concluded 15 October 2024; internal reference 2402561. Lot description: 'Systementwicklung, Projektierung, Lieferung, Montage und Inbetriebnahme von integrierten Stellwerken mit zentralem ETCS Level 1 Full Supervision und vereinfachter Aussensignalisierung zur Neuausruestung der Bahnhoefe Bettembourg und Dudelange des luxemburgischen Eisenbahnnetzes, sowie Umbauten und der Lieferung und Reparatur von Ersatzteilen.' No subcontractor named (published 2024-11-18 · checked 2026-09-14)
- ● TED notice 170840-2024 · Contract-award notice, CFL, design of a new peripheral station at Luxembourg-Hollerich. total-value and BT-161-NoticeResult 16,832,878.01 over two lots; winner-name and organisation-name-tenderer 'Groupement Schroeder&Associes-Dietrich/Untertrifaller-Architecture+Amenagement-Amstein&Walthert' (LOT-0001, B69336) and 'Paul Wurth Geprolux' (LOT-0002, 17249513); both contracts concluded 9 January 2024; internal reference 2300710. Scope: civil, technical and architectural studies from preliminary design through execution, site supervision, acceptance and commissioning (published 2024-03-21 · checked 2026-09-14)
- ● TED notice 370830-2026 · Contract-award notice, CFL, preparatory civil-engineering works for the new Hollerich multimodal interchange. total-value, BT-161-NoticeResult and BT-720-Tender all 8,784,894.25; winner Baatz Constructions (B195414); contract 13 May 2026; BT-759 2 tenders; internal reference 2500671. The buyer-email field on this notice carries a named individual at the winning company and is deliberately not reproduced (published 2026-06-01 · checked 2026-09-14)
- ● TED notice 188468-2024 · Contract-award notice, CFL, second platform at Howald peripheral station with works in the Luxembourg marshalling yard and the R1 group of the Centre de Remisage et de Maintenance. total-value and BT-161-NoticeResult 44,234,281.44; result-lot-identifier LOT-0003 | LOT-0001 | LOT-0002 with winner-selection-status selec-w | selec-w | open-nw; tender-lot-identifier LOT-0003 | LOT-0001; winner-name Colas Rail (LU1961478) | AM Lux TP-Giorgetti-Tralux (LU1495563); contracts concluded 4 January 2024 and 19 December 2023; internal reference 2202511; procedure-identifier 024e3afe-539c-4961-8f20-28ca9edb1aef. The three lots published are a rail platform and track works package at Howald and the Luxembourg yard, a track removal-and-laying package of about 11,500 m, and a 2x25 kV 50 Hz type V200 catenary package over the same length. No per-lot BT-720 is published (published 2024-03-29 · checked 2026-09-14)
- ● TED Search API — Luxtram award-notice history · Query buyer-country IN (LUX) AND buyer-name ~ ("Luxtram") run on 14 September 2026 returns 105 notices in all: 63 cn-standard, 27 can-standard, 13 pin-only, 1 pin-rtl and 1 corr. The most recent contract-award notice is 533199-2023 of 4 September 2023 (total-value 9,042,811.42); the largest is 527349-2023 of 1 September 2023 (total-value 35,904,800.28). No Luxtram award notice has been published on TED since 4 September 2023, and none of the 2024-2026 Luxtram procedures in this file has one (published 2026 · checked 2026-09-14)
- ● TED notice 707575-2025 · Contract notice, LUXTRAM S.A., 'Marche de maitrise d'oeuvre d'execution pour la construction du Centre de Remisage et de Maintenance (CRM) de la Cloche d'or', open procedure, tenders due 1 December 2025. BT-27-Procedure and estimated-value-proc both 8,000,000 — the only figure Luxtram published on any of its 2024-2026 notices read for this file. Scope: general design management covering detailed design and permitting, execution design, scheduling and coordination, drawing approval, site direction and supervision, and the final dossier, for the Tramsschapp site at Cloche d'Or. Internal reference 2502607, procedure-identifier 486b265c-544d-4362-8eb4-497f6261ec76; that identifier returns this notice alone on 14 September 2026 (published 2025-10-27 · checked 2026-09-14)
- ● TED notice 339518-2026 · Contract notice, buyer named on the notice as 'Service Coordination Achats', 'Travaux de maintenance des voies courante et appareils de voie', CPV 45234000 and 50225000, negotiated with prior call, three lots whose published descriptions are 'District Infra Sud du Luxembourg', 'District Infra Centre du Luxembourg' and 'District Infra Nord du Luxembourg'; requests to participate due 16 June 2026 on all three. Internal reference '2601294 // ATC - 7000011586', procedure-identifier f701eee6-86c0-459c-948d-dc243d44375e. No value published; a Search API query on the procedure-identifier on 14 September 2026 returns this notice alone (published 2026-05-18 · checked 2026-09-14)
- ● TED notice 644375-2025 · Contract notice, CFL, 'Reamenagement de la Gare de Bettembourg - Saut-de-mouton ouvrage d'art OA1'. Restricted procedure, requests to participate due 31 October 2025. Scope: construction of a steel railway bridge forming part of the same flyover south of Bettembourg station — reinforced-concrete abutments, pre-assembly of the steel structure and its jacking onto the abutments, with the station remaining in service throughout apart from planned possessions. Internal reference 2502456, procedure-identifier 7ae3bcb7-3083-4129-84ef-69806e3497fa. No value published. A Search API query on that procedure-identifier on 14 September 2026 returns this notice alone: no award notice exists (published 2025-10-02 · checked 2026-09-14)
- ● TED notice 613032-2026 · Contract notice, CFL, 'Reamenagement de la Gare de Bettembourg - Saut de mouton ouvrage d'art OA3'. Restricted procedure, requests to participate due 5 October 2026. Published scope: construction of a road underpass integrated into the new flyover south of Bettembourg station, which removes the conflict between the Bettembourg-Dudelange line and freight trains from the west of the country entering the Bettembourg marshalling yard; demolition of the existing overbridge at PK 1.300 of the Bettembourg-Dudelange line, preliminary utility diversions, on-site precasting of the new reinforced-concrete structure and its jacking under the tracks, and cast-in-place access ramps; civil and technical works. CPV 45220000 and 45221000. Internal reference 2602212. No value field is populated anywhere on the notice (published 2026-09-07 · checked 2026-09-14)
- ● TED notice 552848-2024 · Contract-award notice, CFL, 'Modernisierung des Rangierbahnhofs Dudelingen/Bettemburg' — planner selection and planning services for renewing the interlocking and hump-shunting installations and reworking the track layout of the Dudelange/Bettembourg marshalling yard. total-value and BT-161-NoticeResult 5,896,897.11; winner Nextrail (HRB183289); contract 14 June 2024; internal reference 2302208 (published 2024-09-16 · checked 2026-09-14)
- ● TED notice 346582-2025 · Contract-award notice, CFL, Luxembourg-Wasserbillig line, Roodt/Syre-Wecker section, track renewal PK 20.200-26.900 including high-furnace ballast cleaning and screening and renewal of level crossings 67, 68 and 69. total-value, BT-161-NoticeResult and BT-720-Tender all 11,885,237.11; winner Swietelsky Rail Benelux (NL822511381B01); contract 23 April 2025; BT-759-LotResult 8 with BT-760-LotResult part-req; internal reference 2402029 (published 2025-05-30 · checked 2026-09-14)
- ● TED notice 796268-2024 · Contract notice, CFL, 'Herstellung und Lieferung von 24 elektrischen Zuegen', CPV 34600000, negotiated procedure with prior call, requests to participate due 25 February 2025. Published scope: authorisation for Luxembourg, Germany and Belgium; minimum vehicle length 80 m, maximum to be set in the specification but not above 250 m in multiple traction; the count of 24 does not change with vehicle length; about 3.5 seats per metre of vehicle length; delivery expected to begin at the end of 2030 and to be completed at the end of 2032. Internal reference '2402903 // ATC-7000004149', procedure-identifier 6829a0c8-b5e5-4509-a4dc-052e20570338. No value published. A Search API query on that procedure-identifier on 14 September 2026 returns this notice alone (published 2024-12-27 · checked 2026-09-14)
- ● TED notice 298850-2026 · Contract-award notice, CFL, Luxembourg-Wasserbillig line, Wecker-Mertert/Fausermillen section, track renewal PK 28.000-33.700 including ballast cleaning and renewal of level crossings 72 and 73. total-value, BT-161-NoticeResult and BT-720-Tender all 8,562,985.13; winner Swietelsky Rail Benelux; contract 7 April 2026; BT-759 3 tenders; internal reference 2503221 (published 2026-04-30 · checked 2026-09-14)
- ● transports.public.lu — Reamenagement de la gare d'Ettelbruck · The ministry's own project page. The scheme has a road module for the Fonds des Routes managed by the Administration des Ponts et Chaussees — a new bus station and the rebuilding of the station quarter's streets, including putting the N7 national road underground and rebuilding the Patton bridge with dedicated bus and cycle lanes — and a rail module. The existing passenger building sits on the line of the cut-and-cover tunnel and is replaced. Chiffres-cles: passenger building gross floor area 3,791 m2; P+R capacity 430 spaces; 'Cout du projet: Fonds du Rail: 98 millions d'euros hTVA / Fonds des routes: 38 millions d'euros hTVA'; five platform tracks; twelve bus bays; 100 cycle spaces. Etat actuel: the passenger building has been demolished so that the Administration des ponts et chaussees can build the road underpass for the new N7, on top of which the new passenger building will be placed, part of it made available to the Police grand-ducale; a new platform and a new passenger subway have been built on the other side of the site and the track layout adapted; the existing platforms are then to be renewed and adapted for people with reduced mobility (published 2026 · checked 2026-09-14)
- ● transports.public.lu — Transports ferroviaires · The ministry's own page, last modified 5 June 2024, listing the national and European actors in the rail sector: 'Ministere de la Mobilite et des Travaux publics (MMTP); Autorite nationale de securite - Administration des chemins de fer (ACF); Regulateur - Institut Luxembourgeois de Regulation (ILR); Administration des enquetes techniques (AET); Commission europeenne; Agence de l'Union europeenne pour les chemins de fer (ERA)' (published 2024-06-05 · checked 2026-09-14)
- ● transports.public.lu — Nouvelle ligne ferroviaire Luxembourg-Bettembourg · The ministry's own project page. 'La nouvelle ligne ferroviaire entre Luxembourg et Bettembourg prevoit la construction en site propre d'un nouveau troncon de ligne a deux voies d'une longueur d'environ 7 km, sans arret intermediaire.' The route leaves the future Howald interchange, crosses the A3 motorway south of the Gasperich junction, runs west of it to Bettembourg, leaves the motorway north of the Berchem service area, passes under the RN31 and crosses the existing Luxembourg-Bettembourg line in the Alzette valley on a flyover, after which the new and existing lines run side by side to the north entrance of Bettembourg station; the crossing also requires the existing line to be shifted about thirty metres. Two structures are named as remarkable: OA14 at the A3 crossing south of Howald, and OA05/OA06, the flyover, at the crossing with the existing line north of Bettembourg. Chiffres-cles: 'Le cout du projet s'eleve a 292.013.570,- euros hTVA (indice 730,85 au 1er avril 2013)'; about 52 ha of land to acquire; maximum design speed 160 km/h; besides the rail platform with its track, catenary and signalling equipment the project includes one road underpass, one flyover, one railway bridge, four road bridges, six hydraulic structures, thirteen retention basins and one wildlife crossing. The page names the connected projects the design must accommodate: the future Howald interchange, the widening of the A3 to 2x3 lanes, the extension of the Berchem service area, the rebuilding of the N31 junction at Livange, the removal of level crossing PN4a in rue Lentz at Bettembourg, the future multimodal platform at Bettembourg and the new signalling centre at Bettembourg station (published 2026 · checked 2026-09-14)
- ● transports.public.lu — Train · The ministry's own page on rail passenger transport, last modified 18 September 2025: the train serves most of the territory on a star network centred on Luxembourg City with cross-border links to Germany, Belgium and France. 'Depuis le 1er mars 2020, les transports publics sont gratuits au Luxembourg, sur l'ensemble du territoire national, pour tous les modes de transport, qu'il s'agisse des bus, des trains (excepte 1e classe) ou des trams. Cette mesure s'applique aux residents, aux travailleurs transfrontaliers et aux touristes.' (published 2025-09-18 · checked 2026-09-14)
- ● transports.public.lu — Extensions du reseau du tram · The ministry's own project page, last modified 19 February 2026. 'Depuis le 02 mars 2025, le tram a Luxembourg-Ville circule sur la ligne 1 complete, circulant entre l'Aeroport et la Cloche d'Or.' Extension 1, in construction, is line K2A on the Kirchberg between the Pont Rouge and Luxexpo by way of the Kuebebierg. 'Une deuxieme extension, dont le projet de loi a ete approuve par le gouvernement fin 2025, est prevue sur la Route d'Arlon entre la Place de l'Etoile et le Centre hospitalier de Luxembourg (CHL). Ce projet majeur de 2,2 km incluera 4 arrets supplementaires ainsi un tunnel entre le CHL et l'actuel Stade Josy Barthel. Inscrit dans le Plan national de mobilite 2035, ce projet servira a delester le trafic dans l'ouest de la ville de Luxembourg. Une mise en service est prevue a l'horizon 2032.' The ministry is also working on an interurban fast tram between Luxembourg City and Esch-sur-Alzette for 2035. The page's legal references are the law of 15 December 2017 on the Gare Centrale-Cloche d'Or extension and the law of 15 December 2017 on the Circuit de la Foire internationale-Findel extension (published 2026-02-19 · checked 2026-09-14)
Browse: the Atlas · European Union · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.