? How to use this page
How to use a tender page
- What is being bought, for how much, and what happens next.
- Next step tells you the procedure and where the notice is; Watch to follow deadlines and the award.
- Full scope, exact values, dates and bidders open with this market's edition, with a calendar export.
CFL Bettembourg flyover structure OA1 steel railway bridge
CFL — Bettembourg flyover, structure OA1: a steel railway bridge jacked onto its abutments; applications closed, no award published
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the European Union edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Buyer
- CFL — Direction Gestion Infrastructure
- Where
- Luxembourg · Bettembourg
- Segments
- Civil works
- Technology areas
- Track & civil
- Status
- Bids closed — Contract notice 644375-2025 of October 2025, restricted procedure; requests to participate due October 2025, and no award notice has appeared on TED as of September 2026 — a Search API query on procedure-identifier 7ae3bcb7-3083-4129-84ef-69806e3497fa returns the contract notice alone.
- Value band
- value not published
- Currency
- EUR
- Key dates (month)
- Published October 2025 · Deadline October 2025
Status in full
Read more
Contract notice 644375-2025 of October 2025, restricted procedure; requests to participate due October 2025, and no award notice has appeared on TED as of September 2026 — a Search API query on procedure-identifier 7ae3bcb7-3083-4129-84ef-69806e3497fa returns the contract notice alone. The buyer publishes no value.
Next step
Withheld in the free surface
- Full scope
- How the figure was arrived at
- Key dates (2)
- Published bidders
Full detail withheld: 4 fields. In the European Union edition · See a fully open example
3 sources · all primary
- ● TED notice 644375-2025 · Contract notice, CFL, 'Reamenagement de la Gare de Bettembourg - Saut-de-mouton ouvrage d'art OA1'. Restricted procedure, requests to participate due 31 October 2025. Scope: construction of a steel railway bridge forming part of the same flyover south of Bettembourg station — reinforced-concrete abutments, pre-assembly of the steel structure and its jacking onto the abutments, with the station remaining in service throughout apart from planned possessions. Internal reference 2502456, procedure-identifier 7ae3bcb7-3083-4129-84ef-69806e3497fa. No value published. A Search API query on that procedure-identifier on 14 September 2026 returns this notice alone: no award notice exists (published 2025-10-02 · checked 2026-09-14)
- ● TED notice 613032-2026 · Contract notice, CFL, 'Reamenagement de la Gare de Bettembourg - Saut de mouton ouvrage d'art OA3'. Restricted procedure, requests to participate due 5 October 2026. Published scope: construction of a road underpass integrated into the new flyover south of Bettembourg station, which removes the conflict between the Bettembourg-Dudelange line and freight trains from the west of the country entering the Bettembourg marshalling yard; demolition of the existing overbridge at PK 1.300 of the Bettembourg-Dudelange line, preliminary utility diversions, on-site precasting of the new reinforced-concrete structure and its jacking under the tracks, and cast-in-place access ramps; civil and technical works. CPV 45220000 and 45221000. Internal reference 2602212. No value field is populated anywhere on the notice (published 2026-09-07 · checked 2026-09-14)
- ● CFL Group — projet Gare Bettembourg : les suites · CFL's own forthcoming-projects page. 'Avec la mise en service de la nouvelle ligne Luxembourg - Bettembourg en septembre 2027, la circulation des trains des lignes Luxembourg Esch/Alzette - Rodange et Luxembourg - Thionville - Metz se fera de maniere independante avec deux voies dediees par ligne.' Control of the new line's infrastructure will initially be exercised from the Luxembourg signalling centre 'en attendant qu'un nouveau poste directeur de derniere generation soit installe a partir de 2029', replacing the present one dating from the 1980s, whose technology can no longer take additional control elements for new rail projects. From 2029 the new signalling centre will let CFL make full use of the new track installations north of Bettembourg station, and the Bettembourg interchange is then to be remodelled, including the construction of a new flyover (published 2026 · checked 2026-09-14)
Related tenders
Same buyer first, then the same segment in this market.
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| CFL new interlockings ETCS Level 1 Bettembourg Dudelange | CFL GI | Awarded | $25–100m | Awarded October 2024 |
| CFL second platform Howald peripheral station | CFL GI | Awarded | $25–100m | Awarded January 2024 |
| CFL Rodange maintenance stabling centre design | CFL GI | Awarded | $5–25m | Awarded September 2024 |
Show all 6 related tenders
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| CFL Roodt Syre Wecker track renewal | CFL GI | Awarded | $5–25m | Awarded April 2025 |
| CFL new Hollerich peripheral station design | CFL GI | Awarded | $5–25m | Awarded January 2024 |
| CFL line 6 Luxembourg–Bettembourg formation three-track renewal | CFL GI | Awarded | $5–25m | Awarded April 2025 |
Browse: the Atlas · European Union · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.