CFL second platform Howald peripheral station
CFL — second platform at Howald peripheral station with works in the Luxembourg marshalling yard and the depot's R1 group: awarded to Colas Rail and the Lux TP-Giorgetti-Tralux joint venture
Awarded to Colas Rail — CFL — Direction Gestion Infrastructure now holds 1 position with this supplier.
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the European Union edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Buyer
- CFL — Direction Gestion Infrastructure
- Where
- Luxembourg · Luxembourg City
- Segments
- Civil works, Track, Electrification, Stations & depots
- Technology areas
- Track & civil
- Status
- Awarded — Contract-award notice 188468-2024 of March 2024, restricted procedure, internal reference 2202511.
- Value band
- $25–100m
- Currency
- EUR
- Key dates (month)
- Published March 2024 · Contract concluded January 2024
Status in full
Read more
Contract-award notice 188468-2024 of March 2024, restricted procedure, internal reference 2202511. Two of the three lots were awarded, in December 2023 and January 2024; the third, LOT-0002, carried winner-selection-status open-nw on this notice and no later notice in the procedure awards it.
Next step
Recorded award: Colas Rail — Colas Rail holds LOT-0003 of CFL's Howald phase 2 procedure, published on the first award notice of the procedure and forming part of the cumulative value of the second; it also holds the electrification of the new Luxembourg–Bettembourg line between PK 6.000 and PK 13.300 and the second negative feeder on the Luxembourg–Troisvierges line
Withheld in the free surface
- Full scope
- Exact value
- How the figure was arrived at
- Key dates (2)
- Published bidders
Full detail withheld: 5 fields. In the European Union edition · See a fully open example
4 sources · all primary
- ● TED notice 188468-2024 · Contract-award notice, CFL, second platform at Howald peripheral station with works in the Luxembourg marshalling yard and the R1 group of the Centre de Remisage et de Maintenance. total-value and BT-161-NoticeResult 44,234,281.44; result-lot-identifier LOT-0003 | LOT-0001 | LOT-0002 with winner-selection-status selec-w | selec-w | open-nw; tender-lot-identifier LOT-0003 | LOT-0001; winner-name Colas Rail (LU1961478) | AM Lux TP-Giorgetti-Tralux (LU1495563); contracts concluded 4 January 2024 and 19 December 2023; internal reference 2202511; procedure-identifier 024e3afe-539c-4961-8f20-28ca9edb1aef. The three lots published are a rail platform and track works package at Howald and the Luxembourg yard, a track removal-and-laying package of about 11,500 m, and a 2x25 kV 50 Hz type V200 catenary package over the same length. No per-lot BT-720 is published (published 2024-03-29 · checked 2026-09-14)
- ● TED notice 156875-2024 · Earlier contract-award notice in the same procedure (internal reference 2202511, procedure-identifier 024e3afe-539c-4961-8f20-28ca9edb1aef), published 15 March 2024: total-value 4,595,825.44 for LOT-0003 to Colas Rail, with LOT-0001 and LOT-0002 then still open-nw (published 2024-03-15 · checked 2026-09-14)
- ● CFL Group — projet Pole d'echange multimodal Howald · CFL's own project page, project start 2015, project end 2026: 'Le projet des CFL se limite a la construction de deux quais, y compris les acces et l'adaptation du plan des voies. Le tablier du nouveau passage superieur sera, lui, construit par l'Administration des Ponts et Chaussees. Apres l'achevement de la premiere phase (construction d'un premier quai et de la passerelle pour voyageurs en decembre 2017), les CFL attendent la mise en service d'autres projets lies pour pouvoir demarrer la deuxieme phase, qui comprend la construction d'un deuxieme quai, la connexion a la nouvelle ligne Luxembourg-Bettembourg et l'adaptation des zones d'aiguillages. La finalisation du projet dans son ensemble est planifiee pour fin 2026.' (published 2026 · checked 2026-09-14)
- ● CFL, press release on the 2025 annual report, 15 June 2026 · Four-page press release from the CFL Service Communication, 16 boulevard d'Avranches, L-1160 Luxembourg, dated Luxembourg, 15 June 2026, downloaded as a PDF on 14 September 2026. Investment: 'investissements propres a 158,9 millions d'euros notamment pour l'acquisition de nouveaux trains ou d'investissements dans l'infrastructure ferroviaire pour le compte du Fonds du rail a 327,1 millions d'euros'. Group finances: turnover EUR 1.311 billion in 2025 against EUR 1.215 billion in 2024, up 7.9 per cent; net result a record EUR 35.3 million against EUR 25.6 million. Staff 5,345 (5,199 in 2024) and 466 hires (503). Passengers: 31.4 million, up 0.6 per cent; punctuality 89.6 per cent against 90.8 per cent in 2024, 90.4 per cent excluding strikes on neighbouring networks, and 91.4 per cent over the first five months of 2026. Freight activities turnover EUR 291.3 million, up 3.7 per cent; Groupe CFL multimodal's first positive net result for many years at EUR 3.0 million (a loss of EUR 1.8 million in 2024); Groupe CFL cargo a record net result of EUR 13.3 million, up EUR 6.1 million; Lorry-Rail EUR 8.7 million and Groupe Luxport EUR 1.4 million. Rolling stock: 10 new Coradia trains entered service in 2025 and the full refurbishment of 10 TER2N-ng units was completed, with the other 11 decided; 'En juin 2026, 22 trains Coradia sont en service (17 de la serie 2400 avec 334 places assises par train et 5 de la serie 2450 avec 692 places par train)'; 'En 2025, les CFL ont finalise le cahier des charges en vue de la commande de la prochaine serie de nouveaux trains (serie 2500)'. Network: CFL worked on the network for 270 days in 2025 against 264 in 2024, and 'les deux parties ayant signe, fin 2025, un nouveau contrat de gestion de l'infrastructure ferroviaire pour la periode 2026 - 2040', allocating means on performance criteria and covering the daily management of 1,000 trains a day. Projects: the new Luxembourg-Bettembourg line, 'mise en service prevue a l'automne 2027', and the Howald mobility hub advanced substantially in 2025, a second platform was placed at Howald and the works at the south head of Luxembourg station were completed (published 2026-06-15 · checked 2026-09-14)
Related tenders
Same buyer first, then the same segment in this market.
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| CFL new interlockings ETCS Level 1 Bettembourg Dudelange | CFL GI | Awarded | $25–100m | Awarded October 2024 |
| CFL Rodange maintenance stabling centre design | CFL GI | Awarded | $5–25m | Awarded September 2024 |
| CFL new Hollerich peripheral station design | CFL GI | Awarded | $5–25m | Awarded January 2024 |
Show all 6 related tenders
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| CFL Roodt Syre Wecker track renewal | CFL GI | Awarded | $5–25m | Awarded April 2025 |
| CFL line 6 Luxembourg–Bettembourg formation three-track renewal | CFL GI | Awarded | $5–25m | Awarded April 2025 |
| CFL removal level crossing No 13 Dommeldange | CFL GI | Awarded | $5–25m | Awarded March 2025 |