? How to use this page
How to use a tender page
- What is being bought, for how much, and what happens next.
- Next step tells you the procedure and where the notice is; Watch to follow deadlines and the award.
- Full scope, exact values, dates and bidders open with this market's edition, with a calendar export.
CFL 24 electric trains Luxembourg Germany Belgium
CFL — manufacture and supply of 24 electric trains for Luxembourg, Germany and Belgium: applications closed, no award published
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the European Union edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Buyer
- Société Nationale des Chemins de Fer Luxembourgeois
- Where
- Luxembourg · Luxembourg City
- Segments
- Rolling stock
- Technology areas
- Rolling-stock hardware
- Status
- Bids closed — Contract notice 796268-2024 of December 2024, negotiated procedure with prior call; requests to participate due February 2025, and no award notice has appeared on TED as of September 2026 — a Search API query on the procedure-identifier returns the contract notice alone.
- Value band
- value not published
- Currency
- EUR
- Key dates (month)
- Published December 2024 · Deadline February 2025
Status in full
Read more
Contract notice 796268-2024 of December 2024, negotiated procedure with prior call; requests to participate due February 2025, and no award notice has appeared on TED as of September 2026 — a Search API query on the procedure-identifier returns the contract notice alone. The buyer publishes no value. CFL's 2025 annual report separately states that the specification for the next series of new trains, series 2500, was finalised during 2025 and that customers were brought into the design work; CFL does not publish that the series 2500 and this procedure are the same purchase, and this record does not assert it.
Next step
Withheld in the free surface
- Full scope
- How the figure was arrived at
- Key dates (2)
- Published bidders
Full detail withheld: 4 fields. In the European Union edition · See a fully open example
4 sources · all primary
- ● TED notice 796268-2024 · Contract notice, CFL, 'Herstellung und Lieferung von 24 elektrischen Zuegen', CPV 34600000, negotiated procedure with prior call, requests to participate due 25 February 2025. Published scope: authorisation for Luxembourg, Germany and Belgium; minimum vehicle length 80 m, maximum to be set in the specification but not above 250 m in multiple traction; the count of 24 does not change with vehicle length; about 3.5 seats per metre of vehicle length; delivery expected to begin at the end of 2030 and to be completed at the end of 2032. Internal reference '2402903 // ATC-7000004149', procedure-identifier 6829a0c8-b5e5-4509-a4dc-052e20570338. No value published. A Search API query on that procedure-identifier on 14 September 2026 returns this notice alone (published 2024-12-27 · checked 2026-09-14)
- ● CFL Group — projet L'extension et la modernisation du parc roulant CFL · CFL's own project page: passenger numbers rose 85 per cent over the last fifteen years and 'les CFL ont commande 34 nouvelles rames de la gamme Coradia le 18 decembre 2018. Fournies progressivement par Alstom, les nouvelles rames constituant les nouvelles series 2400 et 2450, permettront d'augmenter considerablement le nombre de places offertes, de plus de 27.200 places assises en 2018 a 38.591 places. La totalite des rames sera livree d'ici 2026.' The units are 80 or 160 m long double-deck multiple units with space for people with reduced mobility, bicycle areas, LED lighting and on-board Wi-Fi (published 2026 · checked 2026-09-14)
- ● CFL, press release on the 2025 annual report, 15 June 2026 · Four-page press release from the CFL Service Communication, 16 boulevard d'Avranches, L-1160 Luxembourg, dated Luxembourg, 15 June 2026, downloaded as a PDF on 14 September 2026. Investment: 'investissements propres a 158,9 millions d'euros notamment pour l'acquisition de nouveaux trains ou d'investissements dans l'infrastructure ferroviaire pour le compte du Fonds du rail a 327,1 millions d'euros'. Group finances: turnover EUR 1.311 billion in 2025 against EUR 1.215 billion in 2024, up 7.9 per cent; net result a record EUR 35.3 million against EUR 25.6 million. Staff 5,345 (5,199 in 2024) and 466 hires (503). Passengers: 31.4 million, up 0.6 per cent; punctuality 89.6 per cent against 90.8 per cent in 2024, 90.4 per cent excluding strikes on neighbouring networks, and 91.4 per cent over the first five months of 2026. Freight activities turnover EUR 291.3 million, up 3.7 per cent; Groupe CFL multimodal's first positive net result for many years at EUR 3.0 million (a loss of EUR 1.8 million in 2024); Groupe CFL cargo a record net result of EUR 13.3 million, up EUR 6.1 million; Lorry-Rail EUR 8.7 million and Groupe Luxport EUR 1.4 million. Rolling stock: 10 new Coradia trains entered service in 2025 and the full refurbishment of 10 TER2N-ng units was completed, with the other 11 decided; 'En juin 2026, 22 trains Coradia sont en service (17 de la serie 2400 avec 334 places assises par train et 5 de la serie 2450 avec 692 places par train)'; 'En 2025, les CFL ont finalise le cahier des charges en vue de la commande de la prochaine serie de nouveaux trains (serie 2500)'. Network: CFL worked on the network for 270 days in 2025 against 264 in 2024, and 'les deux parties ayant signe, fin 2025, un nouveau contrat de gestion de l'infrastructure ferroviaire pour la periode 2026 - 2040', allocating means on performance criteria and covering the daily management of 1,000 trains a day. Projects: the new Luxembourg-Bettembourg line, 'mise en service prevue a l'automne 2027', and the Howald mobility hub advanced substantially in 2025, a second platform was placed at Howald and the works at the south head of Luxembourg station were completed (published 2026-06-15 · checked 2026-09-14)
- ● CFL Group — Chiffres cles (2025) · The group's own key-figures page at groupe.cfl.lu, read 14 September 2026, headed 'Chiffres cles (2025)'. Infrastructure management: 628 km de voies ferrees principales; 68 gares et arrets; '100% Equipement ETCS reseau ferre luxembourgeois'; 27 gares et arrets labellises EUREWELCOME; '382,6 mio. EUR (TVAC) Investissements de l'Etat dans l'infrastructure'; 1,000 trains per day Monday to Friday; 1,175 aiguillages; 26 tunnels. Passenger activity: 89.60 per cent punctuality of passenger trains on the CFL network; 31.4 million passengers carried per year; 68 stations and stops; 547 million passenger-km; '100 %' ETCS equipment; 3.34 million bus passengers; 293,993 seats; 83 buses, 38 locomotives, 63 multiple units. Employer: 5,345 group staff, 353,668 training hours, 466 hires, 84.10 per cent men and 15.90 per cent women (published 2026 · checked 2026-09-14)
Related tenders
Same buyer first, then the same segment in this market.
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| FerrovieNord Regio Express-Transfrontaliero fleet framework | FerrovieNord | Open | $500m–1bn | Closes October 2026 |
| Metro do Porto eight-year light metro subconcession | Metro do Porto | Open | $500m–1bn | Closes October 2026 |
| CFL running-track switch maintenance framework network | CFL | Bids closed | value not published | Bids closed June 2026 · award expected |
Show all 6 related tenders
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| AB Lietuvos geležinkeliai rolling-stock spares assemblies repair | LTG | Open | $100–500m | Closes March 2027 |
| LTG Link passenger rolling-stock spares repair | LTG Link | Open | $100–500m | Closes October 2033 |
| STASY upgrade air-conditioning twelve six-car Series I | STASY | Open | $100–500m | Closes October 2026 |
Browse: the Atlas · European Union · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.