United States · State
? How to use this page
How to use a region page
- Counts and the pipeline for this region come first; the tabs list its buyers, players and tenders.
- Cities on the map open their own pages.
- Capex, pipeline value and the market narrative open with this market's edition.
Minnesota
4 buyers · 52 tenders · checked 2026-10-03
Met Council: Green Line Extension $2.86bn (2027); Blue Extension $3.58bn at 100% design; Northstar commuter rail suspended January 5, 2026.
Everything here is free. One market edition opens in full with one email. Open your free edition
2Metro systems operating
4Buyers tracked
52Tenders tracked
12Cities tracked
- Live pipeline
- $3.58bn METRO Blue Line Extension official project budget, $2.86bn METRO Green Line Extension, $1.065bn Green Line Extension civil construction contract budget, $194.4m Green Line Extension systems contract, $139.3m Blue Line Extension engineering, $130.0m Green Line systems and curve renewal, $123.7m Siemens light rail vehicle contract, $120.5m Renew the Blue; 52 tracked procurements
- Technology areas
- Rolling-stock hardware, Signalling & train control, Track & civil, Electrification, Digital operations, Predictive maintenance, Cybersecurity, AI inspection
Key figures
Metropolitan Council Transporta…$11,422,749 thousand
1 source · primary
- ● Metropolitan Council · 2026 Final Adopted Unified Budget (PDF, 155 pages, 4,548,572 bytes) — Table 9, Transportation Capital Program, and Table G-1, Capital Program Transportation, giving for every project number the 2026 Adopted Authorized Capital Program, the 2026-2031 Capital Improvement Plan by year and the ACP+CIP total, all in thousands of dollars (published 2025-12 · checked 2026-09-14)
The Council's three Federal New…$6,378,764 thousand
1 source · primary
- ● Metropolitan Council · 2026 Final Adopted Unified Budget (PDF, 155 pages, 4,548,572 bytes) — Table 9, Transportation Capital Program, and Table G-1, Capital Program Transportation, giving for every project number the 2026 Adopted Authorized Capital Program, the 2026-2031 Capital Improvement Plan by year and the ACP+CIP total, all in thousands of dollars (published 2025-12 · checked 2026-09-14)
METRO Green Line Extension open…2027
2 sources · all primary
- ● Metropolitan Council · METRO Green Line Extension — project home page: 'Opening in 2027'; 14.5 miles added to the existing Green Line; the Council will announce the 2027 opening day on 26 September 2026 at the Louisiana Avenue station (published 2026-09 · checked 2026-09-14)
- ● Metropolitan Council · About the Green Line Extension — 14.5 miles of double track, 16 new stations, 27 Type 3 light rail vehicles built by Siemens in California, about $3 billion of planned and permitted investment within a 10-minute walk of the line, and people in 70 of Minnesota's 87 counties having worked on the project. The Council's own Project-Facts.aspx address redirects here (HTTP 302), and this is the resolved page read on 14 September 2026 (HTTP 200, 68,436 bytes). (published 2026 · checked 2026-09-14)
Southwest LRT projected budget…$2.86 billion
2 sources · all primary
- ● Office of the Legislative Auditor, State of Minnesota · Financial Audit Division, Performance Audit: Metropolitan Council — Southwest Light Rail Transit Construction, April 2025 (PDF, 48 pages, 3,492,439 bytes), transmittal dated 7 April 2025, covering the period 1 January 2019 through 31 March 2023 Byte counts in this register are gzip transfer sizes; the server's content-length for this PDF is 3,660,150 bytes. (published 2025-04-07 · checked 2026-09-14)
- ● Metropolitan Council · 2026 Final Adopted Unified Budget (PDF, 155 pages, 4,548,572 bytes) — Table 9, Transportation Capital Program, and Table G-1, Capital Program Transportation, giving for every project number the 2026 Adopted Authorized Capital Program, the 2026-2031 Capital Improvement Plan by year and the ACP+CIP total, all in thousands of dollars (published 2025-12 · checked 2026-09-14)
Southwest LRT civil constructio…$1.065 billion
1 source · primary
- ● Office of the Legislative Auditor, State of Minnesota · Financial Audit Division, Performance Audit: Metropolitan Council — Southwest Light Rail Transit Construction, April 2025 (PDF, 48 pages, 3,492,439 bytes), transmittal dated 7 April 2025, covering the period 1 January 2019 through 31 March 2023 Byte counts in this register are gzip transfer sizes; the server's content-length for this PDF is 3,660,150 bytes. (published 2025-04-07 · checked 2026-09-14)
METRO Blue Line Extension offic…$3.58 billion
2 sources · all primary
- ● Metropolitan Council · METRO Blue Line Extension — project home page: 'With the recent completion of the Federal Risk Assessment process and the project nearing the 90% design milestone, project staff in partnership with the Federal Transit Administration have set an official project budget of $3.58 billion'; 90 per cent design by summer 2026 and 100 per cent by autumn 2026; construction anticipated to begin in 2027 The /Current-Projects/ address redirects here (HTTP 302); this is the resolved page read on 14 September 2026 (HTTP 200, 61,879 bytes). (published 2026 · checked 2026-09-14)
- ● Federal Transit Administration · Capital Investment Grant (CIG) Dashboard, CIG-Public-Dashboard-09-11-2026.pdf (2 pages, 113,180 bytes), 'Last updated: 09/10/2026': METRO Blue Line Extension (Bottineau LRT), sponsor Met Council, Minneapolis MN, phase Eng, length 13.4, 13 stations, project cost $3,580.0 million, CIG funding request $752.7 million, CIG share 21 per cent, NEPA completion 8/11/2025, PD entry 08/22/2014, ENG entry 01/19/2017, non-CIG matching funds In Progress, estimated grant date Early 2027; the footnote records that the 8/11/2025 date is the Amended Record of Decision and that the original ROD date was 09/19/2016 Read with the full browser header set; a plain curl is answered HTTP 403. (published 2026-09-11 · checked 2026-09-14)
Metropolitan Council solicitati…1 of 16
6 sources · all primary
- ● Metropolitan Council · Contracting Opportunities — the Council's own publicly advertised solicitation list, server-rendered HTML; the page states 'Contracting opportunities last updated on 9/11/2026'. Read 14 September 2026: fourteen RFP/IFB records, one MCUB Select record and one small-contract record. Byte counts in this register are gzip transfer sizes; the raw HTML of this page is 65,804 to 65,820 bytes. (published 2026-09-11 · checked 2026-09-14)
- ● Metropolitan Council · Contract 26P151, Advertisement for Bids — Revised(2), Lindberg Tunnel LVT & Track Replacement, Project Number 61601, dated 4 August 2026; sealed bids received and publicly opened Thursday 15 September 2026 at 2:00PM; QuestCDN eBidDoc 10266423 (published 2026-08-04 · checked 2026-09-14)
- ● Metropolitan Council · Contract 26P133, Notice of Request for Proposals for Ultrasonic Rail Testing; issue date 9 September 2026, proposals due 13 October 2026 at 4:00 PM CDT, award date December 2026; QuestCDN eBidDoc 10358897 (published 2026-09-09 · checked 2026-09-14)
- ● Metropolitan Council · Contract 26P068, Advertisement for Bids, Blue Line O&M – Non-Rev Chargers, Project Number 64414, dated 2 September 2026; bids opened 8 October 2026 at 2:00PM (published 2026-09-02 · checked 2026-09-14)
- ● Metropolitan Council · 2026 Final Adopted Unified Budget (PDF, 155 pages, 4,548,572 bytes) — Table 9, Transportation Capital Program, and Table G-1, Capital Program Transportation, giving for every project number the 2026 Adopted Authorized Capital Program, the 2026-2031 Capital Improvement Plan by year and the ACP+CIP total, all in thousands of dollars (published 2025-12 · checked 2026-09-14)
- ● Metropolitan Council · Forecasted Contracting Opportunities, dated 2/6/2026 (PDF, 15 pages, 431,322 bytes) — the Council's own forward schedule giving, for each anticipated procurement, the project title, contract type, description, an Estimated Contract Value class, the expected IFB or RFP advertisement quarter, the procurement method and the division unit The Council's Forecasted-Contracts.aspx address redirects here (HTTP 302); this is the resolved address of the PDF itself, read on 14 September 2026 (HTTP 200, 431,322 bytes, 15 pages, dated 2/6/2026). (published 2026-02-06 · checked 2026-09-14)
Metro Transit rides in 2025 acr…50,890,857
2 sources · all primary
- ● Metro Transit · Metro Transit Facts through Dec. 31, 2025 (2025 fact book PDF, 2 pages, 324,849 bytes): 50,890,857 total rides and 155,037 average weekday ridership; Green Line 7,541,564 rides and 22,445 average weekday; Blue Line 5,708,508 rides and 15,804 average weekday; 90 per cent Blue Line and 71 per cent Green Line on-time performance; 27 Bombardier and 91 Siemens light rail vehicles; 37 light rail stations; 3,551 total employees of whom 128 are light rail operators; $758.9 million total revenue and total expenses on the adopted 2025 budget (published 2026 · checked 2026-09-14)
- ● Metro Transit · Metro Transit Facts — 'Data below is as of Dec. 31, 2025, or from Jan. 1, 2025 through Dec. 31, 2025' (published 2026 · checked 2026-09-14)
Metro Transit light rail vehicl…27 Bombardier and 91 Siemens
1 source · primary
- ● Metro Transit · Metro Transit Facts through Dec. 31, 2025 (2025 fact book PDF, 2 pages, 324,849 bytes): 50,890,857 total rides and 155,037 average weekday ridership; Green Line 7,541,564 rides and 22,445 average weekday; Blue Line 5,708,508 rides and 15,804 average weekday; 90 per cent Blue Line and 71 per cent Green Line on-time performance; 27 Bombardier and 91 Siemens light rail vehicles; 37 light rail stations; 3,551 total employees of whom 128 are light rail operators; $758.9 million total revenue and total expenses on the adopted 2025 budget (published 2026 · checked 2026-09-14)
Date from which MnDOT states No…5 January 2026
2 sources · all primary
- ● Minnesota Department of Transportation · Passenger rail in Minnesota: existing intercity services Borealis and Empire Builder; 'Northstar commuter rail service was suspended by Metro Transit effective Jan. 5, 2026. In its place, Metro Transit is operating an expanded bus service'; current studies including the Twin Cities-Duluth/Superior Corridor (published 2026 · checked 2026-09-14)
- ● Metropolitan Council · Business Item 2025-178 — Northstar Commuter Rail Suspension and Replacement Service Plan; Metropolitan Council meeting of 2025-08-27. The Council's own decision record for suspending Northstar, with the ridership, subsidy-per-ride and operating-budget figures and the BNSF contract restriction. (published 2025-08-27 · checked 2026-09-14)
MnDOT's most recent cost estima…$718.9 million
2 sources · all primary
- ● Minnesota Department of Transportation · Northern Lights Express frequently asked questions — 'The most recent cost estimate is $718.9 million. This number is based on capital improvements that were identified in 2017. The estimate is based on a MnDOT analysis and did not include input from partners, such as the host railroad.'; May 2023 legislative appropriation of $194.7 million and the May 2025 shift of $77.232 million away from the project; $500,000 of CIDP funds received; four round trips a day at up to 90 mph with new stations at Coon Rapids, Cambridge, Hinckley and Superior, Wisconsin; 80 per cent federal and 20 per cent state funding (published 2026 · checked 2026-09-14)
- ● Federal Railroad Administration · Corridor ID Program Monthly Obligation Status Report, CID Obligation Status Report_3.31.26_PDFa.pdf (3 pages, 611,403 bytes), 'Last updated: Tuesday March 31, 2026': under New Conventional Rail, Northern Lights Express, corridor sponsor Minnesota DOT, Step 1 obligation date 3/26/2024, Step 1 obligation funds $500,000, with no Step 2 and no Step 3 obligation recorded Read with the full browser header set (HTTP 200, 611,403 bytes); a plain curl is answered HTTP 403. (published 2026-03-31 · checked 2026-09-14)
Start of the Borealis daily St.…21 May 2024
1 source · primary
- ● Minnesota Department of Transportation · Borealis — daily St. Paul–Milwaukee–Chicago round trip begun 21 May 2024 over part of the 411-mile Empire Builder corridor; capital funding of a $31.8 million FRA CRISI grant of September 2020 with $5 million from Amtrak, $11.8 million from MnDOT and $6.5 million from WisDOT; operating support of a $12.6 million FRA Restoration & Enhancement grant of May 2020 and a second of $38.6 million in January 2025; project schedule with final design 2021-2026 and construction 2026-2028 (published 2026 · checked 2026-09-14)
Rail-scope projects on MnDOT's…0 of 23
2 sources · all primary
- ● Minnesota Department of Transportation · 12-month tentative letting schedule (Excel workbook, 3,057,374 bytes; 23 letting sheets from 23 September 2026 to 25 August 2027), giving for every anticipated project the district, state project number, trunk highway, description, length and engineer's estimate (published 2026-09 · checked 2026-09-14)
- ● Minnesota Department of Transportation · MnDOT project advertisements — the letting site listing MnDOT highway construction and maintenance projects currently advertised for bidding, by letting date and district (HTTP 200, 11,629 bytes). The letting-date postback is served to curl when the POST carries the page's own __VIEWSTATE, __VIEWSTATEGENERATOR, __VIEWSTATEENCRYPTED and __EVENTVALIDATION, the two select values and the submit button ctl00$MainContent$btnAdvert, and no __EVENTTARGET; all four letting dates on the dropdown on 14 September 2026 (09/23, 10/13, 10/28 and 11/10/2026) returned the advertisement table, 15,474 to 24,409 bytes, and none contains a rail-scope project. (published 2026-09 · checked 2026-09-14)
Rail-scope solicitations on Min…0 of 144
3 sources · all primary
- ● Minnesota Office of State Procurement, Department of Administration · Goods and Services Solicitation Postings — the state's current goods-and-services solicitation list; 55 postings on 14 September 2026 (HTTP 200, 51,944 bytes, server-rendered, after the host's first-request bot-manager challenge is answered and its cookies carried forward). The page's own header text names a further route: 'Major construction projects are advertised in our Virtual Plan Room.' (published 2026-09-14 · checked 2026-09-14)
- ● Minnesota Office of State Procurement, Department of Administration · Professional and Technical Solicitation Postings — the state's current professional-and-technical solicitation list; 26 postings on 14 September 2026 (HTTP 200, 18,930 bytes, server-rendered, after the host's first-request bot-manager challenge is answered and its cookies carried forward). Carries the same header text naming the Virtual Plan Room as the route for major construction projects. (published 2026-09-14 · checked 2026-09-14)
- ● Minnesota Management and Budget / Office of State Procurement · SWIFT Minnesota Supplier Portal, Bidding Event Information (guest view) — 63 bidding events listed on 14 September 2026 at 13:54 Central time (HTTP 200, 28,154–28,162 bytes, the grid inline in the HTML, after the host's first-request bot-manager challenge is answered). Three are Transportation Department events (2000018661, 2000018668, 2000018686) and none of the 63 is rail. The portal's own notice: 'This listing does not include all bidding opportunities.' (published 2026-09-14 · checked 2026-09-14)
MnDOT states in a June 2026 upd…no 2026 solicitation
2 sources · all primary
- ● Minnesota Department of Transportation · MRSI grant page — 'Minnesota Legislative Update (June 2026): The MRSI Program did not receive new funding in the 2026 legislative session. MnDOT is not planning a grant solicitation for 2026.'; the 2025 solicitation made up to $4.5 million available, being $1 million in new bond funding approved in the 2025 legislative special session and $3.5 million in bond funding reallocated from previous projects, and closed on 9 January 2026 (published 2026-06 · checked 2026-09-14)
- ● Minnesota Department of Transportation · Minnesota Rail Service Improvement Program — established in 1976; provides grants for freight rail service improvement projects and ongoing no-interest loans for capital improvements, rail line rehabilitation and rail purchase assistance (published 2026 · checked 2026-09-14)
Public highway-rail grade cross…more than 4,500
2 sources · all primary
- ● Minnesota Department of Transportation · Freight Railroads — MnDOT coordinates rail crossing safety, trunk highway projects and rail regulatory activities for more than 4,500 public highway-rail grade crossings throughout Minnesota; 'In May 2026, MnDOT adopted the updated Minnesota State Rail Plan' (published 2026 · checked 2026-09-14)
- ● Minnesota Department of Transportation · Minnesota State Rail Plan — 'In May 2026, MnDOT released the updated Minnesota State Rail Plan', part of the Minnesota GO 50-Year Vision for Transportation, providing direction for freight and passenger railroads over the next two decades (published 2026-05 · checked 2026-09-14)
Federal contract opportunities…0 Minnesota rail notices
1 source · primary
- ● US General Services Administration · SAM.gov public search service, queried for rail opportunities in Minnesota on 14 September 2026 (GET /api/prod/sgs/v1/search/?index=opp&q=rail%20Minnesota&page=0&size=25&is_active=true with Accept: application/hal+json; HTTP 200, 21,833 bytes, 217 total results). Every result is a federal buyer — the Army Corps of Engineers districts, Mission and Installation Contracting Command, the FRA's own research announcements and NAVFAC — and none is a Minnesota body or a Minnesota rail procurement (published 2026-09-14 · checked 2026-09-14)
Buyers
| Buyer | Type | Tenders | Contracts awarded |
|---|---|---|---|
| Metropolitan Council | Transit authority | 50 | 5 |
| Minnesota Department of Transportation | State DOT | 2 | 0 |
| Hennepin County Regional Railroad Authority | Development authority | 0 | 0 |
| Ramsey County Regional Railroad Authority | Development authority | 0 | 0 |
Tenders
Cities
| City | Network status | Networks |
|---|---|---|
| Minneapolis | operational - METRO Blue Line light rail from Target Field to the Mall of America through the Lindberg Tunnel at Minneapolis-Saint Paul airport, METRO Green Line light rail to downtown Saint Paul, Amtrak's Empire Builder and Borealis at the Saint Paul-Minneapolis station, and the Northstar commuter rail terminus at Target Field, suspended since 5 January 2026; the METRO Green Line Extension opens in 2027 and the METRO Blue Line Extension is in engineering | METRO Blue Line; METRO Green Line; METRO Green Line Extension (2027); METRO Blue Line Extension (planned); Northstar Commuter Rail (suspended); Amtrak Empire Builder; Amtrak Borealis |
| Saint Paul | operational - METRO Green Line light rail from downtown Saint Paul to downtown Minneapolis, Amtrak's Empire Builder and Borealis at Saint Paul Union Depot, and the Green Line operations and maintenance facility at 340 North Broadway Avenue | METRO Green Line; Amtrak Empire Builder; Amtrak Borealis |
| Bloomington | operational - METRO Blue Line light rail through Terminal 1 and Terminal 2 at Minneapolis-Saint Paul International Airport and on to the Mall of America | METRO Blue Line |
| Brooklyn Park | planned - northern terminus of the 13.4-mile METRO Blue Line Extension, in the Engineering phase of the FTA's Capital Investment Grants programme with a construction grant estimated for early 2027 | METRO Blue Line Extension (planned) |
| Eden Prairie | under construction - western terminus of the 14.5-mile METRO Green Line Extension, opening in 2027 | METRO Green Line Extension (2027) |
| Hopkins | under construction - METRO Green Line Extension stations and the Hopkins Rail Support Facility, which the Council reported 97 per cent complete in August 2026 | METRO Green Line Extension (2027) |
| Duluth | planned - northern terminus of the proposed Northern Lights Express, which MnDOT describes as 'a proposed intercity passenger rail service between Minneapolis and Duluth' on the Twin Cities-Duluth/Superior Corridor, in Step 1 of the FRA's Corridor Identification and Development Program; MnDOT states the existing Duluth station would be upgraded and that the service is expected to make four round trips a day connecting Duluth/Superior and Minneapolis | Northern Lights Express (planned) |
| St. Cloud | operational - Amtrak Empire Builder station stop, one daily train in each direction | Amtrak Empire Builder |
| Winona | operational - Amtrak station stop served twice daily in each direction: the Empire Builder, one daily train in each direction, and the Borealis St. Paul-Milwaukee-Chicago round trip that began on 21 May 2024, whose stop list on the Wisconsin Department of Transportation's own Twin Cities-Milwaukee-Chicago project page runs '...La Crosse, Wisconsin; Winona, Minnesota; Red Wing, Minnesota; St. Paul Union Depot' | Amtrak Empire Builder; Amtrak Borealis |
| Red Wing | operational - Amtrak station stop served twice daily in each direction: the Empire Builder, one daily train in each direction, and the Borealis St. Paul-Milwaukee-Chicago round trip that began on 21 May 2024, whose stop list on the Wisconsin Department of Transportation's own Twin Cities-Milwaukee-Chicago project page runs '...La Crosse, Wisconsin; Winona, Minnesota; Red Wing, Minnesota; St. Paul Union Depot' | Amtrak Empire Builder; Amtrak Borealis |
| Staples | operational - Amtrak Empire Builder station stop, one daily train in each direction | Amtrak Empire Builder |
| Detroit Lakes | operational - Amtrak Empire Builder station stop, one daily train in each direction | Amtrak Empire Builder |
Players with a footprint here
| Player | Kind | Footprint |
|---|---|---|
| Kimley-Horn | Engineering consultant | Project presence |
Withheld in the free surface
- Capex in this region (3)
- Market narrative
Full detail withheld: 2 fields. In the United States edition · See a fully open example
- Procurement routes note
- Board reporting note
- Market narrative
Full detail withheld: 3 fields. In the United States edition · See a fully open example
Sources
- ● Metropolitan Council · Business Item 2025-165 — METRO Green Line Extension Construction Support Legal Services Contract 20P007 – Amendment No. 3; Metropolitan Council meeting of 2025-07-23. Venable, LLC; adds $8,977,000 for a total not-to-exceed $28,227,000. (published 2025-07-23 · checked 2026-09-14)
- ● Metropolitan Council · Business Item 2025-178 — Northstar Commuter Rail Suspension and Replacement Service Plan; Metropolitan Council meeting of 2025-08-27. The Council's own decision record for suspending Northstar, with the ridership, subsidy-per-ride and operating-budget figures and the BNSF contract restriction. (published 2025-08-27 · checked 2026-09-14)
- ● Metropolitan Council · Business Item 2025-187 — METRO Blue Line Extension – Kimley-Horn Amendment, Contract 22P103A; Metropolitan Council meeting of 2025-11-12. Increases the contract value by $42,900,000 for a total not-to-exceed $139,275,448; the committee record states that the funds are flowing from Hennepin County to the Council. (published 2025-11-12 · checked 2026-09-14)
- ● Metropolitan Council · Business Item 2025-301 — METRO Green Line Extension Construction Management Support Services Contract 17P060 – Amendment No. 7; Metropolitan Council meeting of 2025-12-03. Kimley-Horn and Associates, Inc.; adds $2,694,772.57 for a total not-to-exceed $26,229,825.55. (published 2025-12-03 · checked 2026-09-14)
- ● Metropolitan Council · Business Item 2026-105 — Northstar Equipment Lease Agreement with Sound Transit, Contract 26M055; Metropolitan Council meeting of 2026-05-27. Lease of one Northstar locomotive to Sound Transit, June to August 2026, at no cost to the Council. (published 2026-05-27 · checked 2026-09-14)
- ● Metropolitan Council · Business Item 2026-107 — METRO Green Line Extension Aldridge Parsons Joint Venture Change Order to Contract 17P000; Metropolitan Council meeting of 2026-06-24. Carries the original systems contract award date and amount, the change-order authority table and the change-order amount. (published 2026-06-24 · checked 2026-09-14)
- ● Metropolitan Council · Business Item 2026-113 — St. Paul OMF LRV Storage Barn, Contract 25P196; Metropolitan Council meeting of 2026-07-08. Rejection of all bids, with the four bid amounts, the design consultant's estimate and the funds available. (published 2026-07-08 · checked 2026-09-14)
- ● Metropolitan Council · Business Item 2026-33 SW — METRO Blue Line Extension – Master Utility Agreement #24M045 with Northern States Power Company; Metropolitan Council meeting of 2026-02-25. Not-to-exceed $18,600,000 for reimbursement of compensable utility relocation costs. (published 2026-02-25 · checked 2026-09-14)
- ● Metropolitan Council · Business Item 2026-55 — METRO Blue Line Extension – Utility Relocation Agreement #25M010 with Qwest Corporation d/b/a CenturyLink QC; Metropolitan Council meeting of 2026-03-11. Not-to-exceed $2,356,016; below the market floor and named rather than carried. (published 2026-03-11 · checked 2026-09-14)
- ● Metropolitan Council · Business Item 2026-63 — METRO Green Line Extension LRT Project: Amendment No. 7 to Light Rail Vehicle Contract 15P148 with Siemens; Metropolitan Council meeting of 2026-03-25. Carries the vehicle contract's execution date, quantity and full amendment history with amounts. (published 2026-03-25 · checked 2026-09-14)
- ● Metropolitan Council · METRO Blue Line Extension — project home page: 'With the recent completion of the Federal Risk Assessment process and the project nearing the 90% design milestone, project staff in partnership with the Federal Transit Administration have set an official project budget of $3.58 billion'; 90 per cent design by summer 2026 and 100 per cent by autumn 2026; construction anticipated to begin in 2027 The /Current-Projects/ address redirects here (HTTP 302); this is the resolved page read on 14 September 2026 (HTTP 200, 61,879 bytes). (published 2026 · checked 2026-09-14)
- ● Federal Transit Administration · Capital Investment Grant (CIG) Dashboard, CIG-Public-Dashboard-09-11-2026.pdf (2 pages, 113,180 bytes), 'Last updated: 09/10/2026': METRO Blue Line Extension (Bottineau LRT), sponsor Met Council, Minneapolis MN, phase Eng, length 13.4, 13 stations, project cost $3,580.0 million, CIG funding request $752.7 million, CIG share 21 per cent, NEPA completion 8/11/2025, PD entry 08/22/2014, ENG entry 01/19/2017, non-CIG matching funds In Progress, estimated grant date Early 2027; the footnote records that the 8/11/2025 date is the Amended Record of Decision and that the original ROD date was 09/19/2016 Read with the full browser header set; a plain curl is answered HTTP 403. (published 2026-09-11 · checked 2026-09-14)
- ● Metropolitan Council · METRO Green Line Extension — project home page: 'Opening in 2027'; 14.5 miles added to the existing Green Line; the Council will announce the 2027 opening day on 26 September 2026 at the Louisiana Avenue station (published 2026-09 · checked 2026-09-14)
- ● Metropolitan Council · 2026 Final Adopted Unified Budget (PDF, 155 pages, 4,548,572 bytes) — Table 9, Transportation Capital Program, and Table G-1, Capital Program Transportation, giving for every project number the 2026 Adopted Authorized Capital Program, the 2026-2031 Capital Improvement Plan by year and the ACP+CIP total, all in thousands of dollars (published 2025-12 · checked 2026-09-14)
- ● Metropolitan Council · Forecasted Contracting Opportunities, dated 2/6/2026 (PDF, 15 pages, 431,322 bytes) — the Council's own forward schedule giving, for each anticipated procurement, the project title, contract type, description, an Estimated Contract Value class, the expected IFB or RFP advertisement quarter, the procurement method and the division unit The Council's Forecasted-Contracts.aspx address redirects here (HTTP 302); this is the resolved address of the PDF itself, read on 14 September 2026 (HTTP 200, 431,322 bytes, 15 pages, dated 2/6/2026). (published 2026-02-06 · checked 2026-09-14)
- ● Metropolitan Council · Contracting Opportunities — the Council's own publicly advertised solicitation list, server-rendered HTML; the page states 'Contracting opportunities last updated on 9/11/2026'. Read 14 September 2026: fourteen RFP/IFB records, one MCUB Select record and one small-contract record. Byte counts in this register are gzip transfer sizes; the raw HTML of this page is 65,804 to 65,820 bytes. (published 2026-09-11 · checked 2026-09-14)
- ● Minnesota Department of Transportation · Borealis — daily St. Paul–Milwaukee–Chicago round trip begun 21 May 2024 over part of the 411-mile Empire Builder corridor; capital funding of a $31.8 million FRA CRISI grant of September 2020 with $5 million from Amtrak, $11.8 million from MnDOT and $6.5 million from WisDOT; operating support of a $12.6 million FRA Restoration & Enhancement grant of May 2020 and a second of $38.6 million in January 2025; project schedule with final design 2021-2026 and construction 2026-2028 (published 2026 · checked 2026-09-14)
- ● Minnesota Department of Transportation · 12-month tentative letting schedule (Excel workbook, 3,057,374 bytes; 23 letting sheets from 23 September 2026 to 25 August 2027), giving for every anticipated project the district, state project number, trunk highway, description, length and engineer's estimate (published 2026-09 · checked 2026-09-14)
- ● Minnesota Department of Transportation · MRSI grant page — 'Minnesota Legislative Update (June 2026): The MRSI Program did not receive new funding in the 2026 legislative session. MnDOT is not planning a grant solicitation for 2026.'; the 2025 solicitation made up to $4.5 million available, being $1 million in new bond funding approved in the 2025 legislative special session and $3.5 million in bond funding reallocated from previous projects, and closed on 9 January 2026 (published 2026-06 · checked 2026-09-14)
- ● Minnesota Department of Transportation · Northern Lights Express frequently asked questions — 'The most recent cost estimate is $718.9 million. This number is based on capital improvements that were identified in 2017. The estimate is based on a MnDOT analysis and did not include input from partners, such as the host railroad.'; May 2023 legislative appropriation of $194.7 million and the May 2025 shift of $77.232 million away from the project; $500,000 of CIDP funds received; four round trips a day at up to 90 mph with new stations at Coon Rapids, Cambridge, Hinckley and Superior, Wisconsin; 80 per cent federal and 20 per cent state funding (published 2026 · checked 2026-09-14)
- ● Minnesota Department of Transportation · Passenger rail in Minnesota: existing intercity services Borealis and Empire Builder; 'Northstar commuter rail service was suspended by Metro Transit effective Jan. 5, 2026. In its place, Metro Transit is operating an expanded bus service'; current studies including the Twin Cities-Duluth/Superior Corridor (published 2026 · checked 2026-09-14)
- ● Metro Transit · Metro Transit Facts through Dec. 31, 2025 (2025 fact book PDF, 2 pages, 324,849 bytes): 50,890,857 total rides and 155,037 average weekday ridership; Green Line 7,541,564 rides and 22,445 average weekday; Blue Line 5,708,508 rides and 15,804 average weekday; 90 per cent Blue Line and 71 per cent Green Line on-time performance; 27 Bombardier and 91 Siemens light rail vehicles; 37 light rail stations; 3,551 total employees of whom 128 are light rail operators; $758.9 million total revenue and total expenses on the adopted 2025 budget (published 2026 · checked 2026-09-14)
- ● Office of the Legislative Auditor, State of Minnesota · Financial Audit Division, Performance Audit: Metropolitan Council — Southwest Light Rail Transit Construction, April 2025 (PDF, 48 pages, 3,492,439 bytes), transmittal dated 7 April 2025, covering the period 1 January 2019 through 31 March 2023 Byte counts in this register are gzip transfer sizes; the server's content-length for this PDF is 3,660,150 bytes. (published 2025-04-07 · checked 2026-09-14)
- ● Minnesota Office of State Procurement, Department of Administration · Goods and Services Solicitation Postings — the state's current goods-and-services solicitation list; 55 postings on 14 September 2026 (HTTP 200, 51,944 bytes, server-rendered, after the host's first-request bot-manager challenge is answered and its cookies carried forward). The page's own header text names a further route: 'Major construction projects are advertised in our Virtual Plan Room.' (published 2026-09-14 · checked 2026-09-14)
- ● Minnesota Office of State Procurement, Department of Administration · Professional and Technical Solicitation Postings — the state's current professional-and-technical solicitation list; 26 postings on 14 September 2026 (HTTP 200, 18,930 bytes, server-rendered, after the host's first-request bot-manager challenge is answered and its cookies carried forward). Carries the same header text naming the Virtual Plan Room as the route for major construction projects. (published 2026-09-14 · checked 2026-09-14)
- ● Minnesota Management and Budget / Office of State Procurement · SWIFT Minnesota Supplier Portal, Bidding Event Information (guest view) — 63 bidding events listed on 14 September 2026 at 13:54 Central time (HTTP 200, 28,154–28,162 bytes, the grid inline in the HTML, after the host's first-request bot-manager challenge is answered). Three are Transportation Department events (2000018661, 2000018668, 2000018686) and none of the 63 is rail. The portal's own notice: 'This listing does not include all bidding opportunities.' (published 2026-09-14 · checked 2026-09-14)
Browse: the Atlas · United States · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.