Twin Cities-Milwaukee-Chicago Borealis service

Twin Cities-Milwaukee-Chicago passenger rail infrastructure project - the railroad improvements behind the Borealis service that began in May 2024, with construction scheduled for 2026 to 2028

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Buyer
Minnesota Department of Transportation
Where
Minnesota · Saint Paul
Segments
Track, Signalling, Civil works
Technology areas
Track & civil, Signalling & train control
Status
Planned — Service is running and construction is scheduled.
Value band
$25–100m
Currency
USD
Key dates (month)
Crisi grant September 2020 · Re grant 1 May 2020 · Re grant 2 January 2025 · Service began May 2024 · Construction start 2026 · Construction end 2028

Status in full

Read more

Service is running and construction is scheduled. MnDOT's own project schedule gives planning and environmental work 2016 to 2021, engineering 2016 to 2026 with final design 2021 to 2026, and construction 2026 to 2028. The Wisconsin Department of Transportation has been taking the lead on the final phase of the project, and MnDOT publishes its own committed share rather than contracts; no contractor is named in any MnDOT document read for this file. The Borealis itself began in May 2024 as a daily round trip between St. Paul, Milwaukee and Chicago, operated by Amtrak in partnership with the Illinois, Wisconsin and Minnesota departments of transportation.

Next step

Planned — target 2026.

Read the notice: Minnesota Department of Transportation ↗

Recorded award: MnDOT — Named by MnDOT among the partners in the Twin Cities-Milwaukee-Chicago passenger rail project

Withheld in the free surface

  • Full scope
  • Exact value
  • How the figure was arrived at
  • Key dates (6)
  • Published bidders

Full detail withheld: 5 fields. In the United States edition · See a fully open example

3 sources · all primary
  • ● Minnesota Department of Transportation · Borealis — daily St. Paul–Milwaukee–Chicago round trip begun 21 May 2024 over part of the 411-mile Empire Builder corridor; capital funding of a $31.8 million FRA CRISI grant of September 2020 with $5 million from Amtrak, $11.8 million from MnDOT and $6.5 million from WisDOT; operating support of a $12.6 million FRA Restoration & Enhancement grant of May 2020 and a second of $38.6 million in January 2025; project schedule with final design 2021-2026 and construction 2026-2028 (published 2026 · checked 2026-09-14)
  • ● Minnesota Department of Transportation · Passenger rail in Minnesota: existing intercity services Borealis and Empire Builder; 'Northstar commuter rail service was suspended by Metro Transit effective Jan. 5, 2026. In its place, Metro Transit is operating an expanded bus service'; current studies including the Twin Cities-Duluth/Superior Corridor (published 2026 · checked 2026-09-14)
  • ● Minnesota Department of Transportation · The Empire Builder — one daily train in each direction with station stops in Winona, Red Wing, St. Paul/Minneapolis, St. Cloud, Staples and Detroit Lakes, operating over freight rail tracks owned by Canadian Pacific Kansas City Railway, Minnesota Commercial Railway and BNSF Railway (published 2026 · checked 2026-09-14)

Related tenders

Same buyer first, then the same segment in this market.

TenderBuyerStatusValue bandNext key date
Ashmont and Mattapan Infrastructure UpgradesMBTAOpen$100–500m
Light Rail Modernization Program Tranche 3 Cromwell FacilityMDOT MTAOpenestimated cost class L: over $100 million, in MTA's own construction look-ahead of August 2026; MTA publishes no contract valuePublished July 2026
Northern Lights Express Minneapolis-Duluth railMnDOTPlanned$500m–1bn
Show all 6 related tenders
TenderBuyerStatusValue bandNext key date
Red Line Hi-Rail Access Tunnel AlewifeMBTAOpen$25–100m
Light Rail Metro Facilities Ancillary maintenance constructionMDOT MTAOpenestimated cost class H: $15 million to $30 million, for the matching line in MTA's own on-call master contract look-ahead of August 2026; MTA publishes no contract value
MARC Mechanical Ancillary maintenance construction master contractMDOT MTAOpenestimated cost class G: $10 million to $15 million, for the matching line in MTA's own on-call master contract look-ahead of August 2026; MTA publishes no contract value

Browse: the Atlas · United States · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.