METRO Green Line Extension systems construction
METRO Green Line Extension systems construction, Contract 17P000 with Aldridge - Parsons, a Joint Venture - manufacture, delivery, installation and testing of the light rail system components of the 14.5-mile extension
Awarded to Parsons — Metropolitan Council now holds 1 position with this supplier.
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Buyer
- Metropolitan Council
- Where
- Minnesota · Minneapolis
- Segments
- Signalling, Electrification, Telecoms, Rolling stock
- Technology areas
- Signalling & train control, Track & civil, Digital operations
- Status
- In execution — Systems construction is over 90 per cent complete, the Council reported to itself in August 2026, with work focused on the Kenilworth LRT Tunnel - tunnel systems houses powered up, tunnel lighting and electrical installed, emergency ventilation jet fan installation and lift station pump installation ongoing, fire suppression systems installed.
- Value band
- $100–500m
- Currency
- USD
- Key dates (month)
- Bid submitted June 2019 · Awarded September 2019 · Change order 2024 May 2024 · Change orders executed as of May 2026 · Change order approved June 2026 · Transportation committee June 2026
Status in full
Read more
Systems construction is over 90 per cent complete, the Council reported to itself in August 2026, with work focused on the Kenilworth LRT Tunnel - tunnel systems houses powered up, tunnel lighting and electrical installed, emergency ventilation jet fan installation and lift station pump installation ongoing, fire suppression systems installed. Systems integration testing, led by the systems contractor, is active between Target Field and Bryn Mawr stations, with overhead contact system dead and live wire testing, signal system testing and grade crossing warning system testing under way. Once systems integration testing is complete the system is turned over to Metro Transit for further testing and training before revenue operations begin in 2027.
Next step
Recorded award: Parsons — METRO Green Line Extension systems construction, Contract 17P000, awarded to Aldridge - Parsons, a Joint Venture
Withheld in the free surface
- Full scope
- Exact value
- How the figure was arrived at
- Key dates (6)
- Published bidders
Full detail withheld: 5 fields. In the United States edition · See a fully open example
7 sources · all primary
- ● Metropolitan Council · Business Item 2026-107 — METRO Green Line Extension Aldridge Parsons Joint Venture Change Order to Contract 17P000; Metropolitan Council meeting of 2026-06-24. Carries the original systems contract award date and amount, the change-order authority table and the change-order amount. (published 2026-06-24 · checked 2026-09-14)
- ● Metropolitan Council · METRO Green Line Extension update, presentation to the Metropolitan Council, 26 August 2026 (PDF, 24 pages, 5,460,085 bytes): civil construction nearing completion; Hopkins Rail Support Facility 97 per cent complete; systems construction over 90 per cent complete; systems integration testing active between Target Field and Bryn Mawr; through July 2026, 5,698 people had worked on the project, 4,606 of them Minnesota residents; 22 per cent disadvantaged business enterprise participation on construction contracts against a project goal of 15 per cent (published 2026-08-26 · checked 2026-09-14)
- ● Office of the Legislative Auditor, State of Minnesota · Financial Audit Division, Performance Audit: Metropolitan Council — Southwest Light Rail Transit Construction, April 2025 (PDF, 48 pages, 3,492,439 bytes), transmittal dated 7 April 2025, covering the period 1 January 2019 through 31 March 2023 Byte counts in this register are gzip transfer sizes; the server's content-length for this PDF is 3,660,150 bytes. (published 2025-04-07 · checked 2026-09-14)
- ● Metropolitan Council · 2026 Final Adopted Unified Budget (PDF, 155 pages, 4,548,572 bytes) — Table 9, Transportation Capital Program, and Table G-1, Capital Program Transportation, giving for every project number the 2026 Adopted Authorized Capital Program, the 2026-2031 Capital Improvement Plan by year and the ACP+CIP total, all in thousands of dollars (published 2025-12 · checked 2026-09-14)
- ● Metropolitan Council · Green Line Extension Executive Change Control Board, agenda and materials for the meeting of 12 June 2026 (HTML, 39,599 bytes). Prints three change-order resolutions against the Systems and Tunnel Facilities contract with Aldridge - Parsons, a Joint Venture: Resolution 26-ECCB-004, project contingency of $14,571,036.67 for Change Order 181, for claims resolution costs associated with an extension of time to the contract and for systems maintenance activities; Resolution 26-ECCB-005, $1,759,180.03 for Change Order 175, to construct the systems elements of the Hopkins pocket track; and Resolution 26-ECCB-006, $420,000 for Change Order 170, to furnish and install cameras, emergency telephones, card readers and associated cabling in the Beltline Boulevard Station parking ramp. (published 2026-06 · checked 2026-09-14)
- ● Metropolitan Council · Green Line Extension Executive Change Control Board, agenda and materials for the meeting of 14 August 2026 (HTML, 38,546 bytes). Prints project contingency of $656,803.24 for the Part 2 Change Order 0171 to the Systems and Tunnel Facilities contract with Aldridge - Parsons, a Joint Venture, and a standing Report on Change Orders. (published 2026-08 · checked 2026-09-14)
- ● Metropolitan Council · Archived Meetings — the Council's own meeting register, paged at ?page=N (143 pages of 30 rows on 14 September 2026), each row linking the agenda page and, where the meeting's minutes have been published, the minutes. Twelve pages were fetched, 372 rows in all, covering 14 July 2025 to 11 September 2026: 28 Metropolitan Council rows, 28 Transportation Committee rows, and - beside them - 15 Green Line Extension Executive Change Control Board rows of which 9 carry an agenda, and 15 Blue Line Extension Project Decisions Board rows of which 5 carry an agenda, the remainder in each case marked CANCELED. (published 2026-09 · checked 2026-09-14)
Related tenders
Same buyer first, then the same segment in this market.
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Lindberg Tunnel low-vibration track replacement | Met Council | Bids closed | estimated contract value 'Over $10M' as the Council's own Forecasted Contracting Opportunities schedule prints it - an open-ended class with a published floor and no ceiling, not a point estimate | Bids closed September 2026 · award expected |
| METRO Green Line Extension civil construction | Met Council | In execution | over $1bn | |
| St. Paul OMF LRV storage barn | Met Council | Cancelled | $25–100m |
Show all 6 related tenders
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| METRO Blue Line Extension engineering | Met Council | In execution | $100–500m | |
| Twenty-seven Type 3 vehicles Green Line Extension | Met Council | In execution | $100–500m | |
| METRO Green Line Extension legal services | Met Council | In execution | $25–100m |
Browse: the Atlas · United States · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.