? How to use this page
How to use a tender page
- What is being bought, for how much, and what happens next.
- Next step tells you the procedure and where the notice is; Watch to follow deadlines and the award.
- Full scope, exact values, dates and bidders open with this market's edition, with a calendar export.
Light rail network bridge maintenance programme
Bridge maintenance programme on the light rail network - project 61800
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Buyer
- Metropolitan Council
- Where
- Minnesota · Minneapolis
- Segments
- Civil works
- Technology areas
- Track & civil
- Status
- Planned — Authorised with further funding planned across 2028 to 2031.
- Value band
- $5–25m
- Currency
- USD
- Key dates (month)
- Budget adopted December 2025 · Budget read September 2026
Status in full
Read more
Authorised with further funding planned across 2028 to 2031. The budget's own supplemental table gives the line's location as the Blue Line and its operator as Metro Transit, and records no operating-cost impact.
Next step
Withheld in the free surface
- Full scope
- Exact value
- How the figure was arrived at
- Key dates (2)
- Published bidders
Full detail withheld: 5 fields. In the United States edition · See a fully open example
1 source · primary
- ● Metropolitan Council · 2026 Final Adopted Unified Budget (PDF, 155 pages, 4,548,572 bytes) — Table 9, Transportation Capital Program, and Table G-1, Capital Program Transportation, giving for every project number the 2026 Adopted Authorized Capital Program, the 2026-2031 Capital Improvement Plan by year and the ACP+CIP total, all in thousands of dollars (published 2025-12 · checked 2026-09-14)
Related tenders
Same buyer first, then the same segment in this market.
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Lindberg Tunnel low-vibration track replacement | Met Council | Bids closed | estimated contract value 'Over $10M' as the Council's own Forecasted Contracting Opportunities schedule prints it - an open-ended class with a published floor and no ceiling, not a point estimate | Bids closed September 2026 · award expected |
| METRO Green Line Extension systems construction | Met Council | In execution | $100–500m | Awarded September 2019 |
| St. Paul OMF LRV storage barn | Met Council | Cancelled | $25–100m |
Show all 6 related tenders
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| METRO Green Line Extension civil construction | Met Council | In execution | over $1bn | |
| METRO Blue Line Extension engineering | Met Council | In execution | $100–500m | |
| Twenty-seven Type 3 vehicles Green Line Extension | Met Council | In execution | $100–500m |
Browse: the Atlas · United States · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.