Twenty-seven Type 3 vehicles Green Line Extension

Twenty-seven Type 3 light rail vehicles for the METRO Green Line Extension, Contract 15P148 with Siemens Mobility, Inc.

Awarded to Siemens Mobility — Metropolitan Council now holds 1 position with this supplier.

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Buyer
Metropolitan Council
Where
Minnesota · Minneapolis
Segments
Rolling stock
Technology areas
Rolling-stock hardware
Status
In execution — The vehicles were ordered under a contract entered into in December 2016 and have been entering service on the existing METRO Blue Line; Metro Transit's fact book through December 2025 records 91 Siemens light rail vehicles alongside 27 Bombardier vehicles in the fleet.
Value band
$100–500m
Currency
USD
Key dates (month)
Contract entered December 2016 · Amendment 3 February 2019 · Amendment 6 September 2021 · Amendment 7 approved March 2026 · Management committee March 2026

Status in full

Read more

The vehicles were ordered under a contract entered into in December 2016 and have been entering service on the existing METRO Blue Line; Metro Transit's fact book through December 2025 records 91 Siemens light rail vehicles alongside 27 Bombardier vehicles in the fleet. Commissioning of the vehicles is ongoing, which is the Council's stated reason for Amendment No. 7. The Council's own project page states that 27 new light rail vehicles were ordered and have begun entering service, built by Siemens in California.

Next step

In execution — awarded and under way.

Read the notice: Metropolitan Council ↗

Recorded award: Siemens Mobility — Twenty-seven Type 3 light rail vehicles for the METRO Green Line Extension, Contract 15P148, total not-to-exceed

Withheld in the free surface

  • Full scope
  • Exact value
  • How the figure was arrived at
  • Key dates (5)
  • Published bidders

Full detail withheld: 5 fields. In the United States edition · See a fully open example

3 sources · all primary
  • ● Metropolitan Council · Business Item 2026-63 — METRO Green Line Extension LRT Project: Amendment No. 7 to Light Rail Vehicle Contract 15P148 with Siemens; Metropolitan Council meeting of 2026-03-25. Carries the vehicle contract's execution date, quantity and full amendment history with amounts. (published 2026-03-25 · checked 2026-09-14)
  • ● Metropolitan Council · About the Green Line Extension — 14.5 miles of double track, 16 new stations, 27 Type 3 light rail vehicles built by Siemens in California, about $3 billion of planned and permitted investment within a 10-minute walk of the line, and people in 70 of Minnesota's 87 counties having worked on the project. The Council's own Project-Facts.aspx address redirects here (HTTP 302), and this is the resolved page read on 14 September 2026 (HTTP 200, 68,436 bytes). (published 2026 · checked 2026-09-14)
  • ● Metro Transit · Metro Transit Facts through Dec. 31, 2025 (2025 fact book PDF, 2 pages, 324,849 bytes): 50,890,857 total rides and 155,037 average weekday ridership; Green Line 7,541,564 rides and 22,445 average weekday; Blue Line 5,708,508 rides and 15,804 average weekday; 90 per cent Blue Line and 71 per cent Green Line on-time performance; 27 Bombardier and 91 Siemens light rail vehicles; 37 light rail stations; 3,551 total employees of whom 128 are light rail operators; $758.9 million total revenue and total expenses on the adopted 2025 budget (published 2026 · checked 2026-09-14)

Related tenders

Same buyer first, then the same segment in this market.

TenderBuyerStatusValue bandNext key date
Lindberg Tunnel low-vibration track replacementMet CouncilBids closedestimated contract value 'Over $10M' as the Council's own Forecasted Contracting Opportunities schedule prints it - an open-ended class with a published floor and no ceiling, not a point estimateBids closed September 2026 · award expected
METRO Green Line Extension systems constructionMet CouncilIn execution$100–500mAwarded September 2019
St. Paul OMF LRV storage barnMet CouncilCancelled$25–100m
Show all 6 related tenders
TenderBuyerStatusValue bandNext key date
METRO Green Line Extension civil constructionMet CouncilIn executionover $1bn
METRO Blue Line Extension engineeringMet CouncilIn execution$100–500m
METRO Green Line Extension legal servicesMet CouncilIn execution$25–100m

Browse: the Atlas · United States · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.