12 buyers · 40 tenders · checked 2026-10-03

1520 mm network, minimal electrification, no ETCS, freight declining, record passenger numbers; Rail Baltica EUR 3.70bn framework, Riga Central Station substantially complete August 2026.

Everything here is free. One market edition opens in full with one email. Open your free edition

0Metro systems operating
12Buyers tracked
40Tenders tracked
Live pipeline
EUR 8.49bn of valued procurements tracked on TED since January 2024 across 39 records that publish a value, of which EUR 7.49bn is Rail Baltica let by Eiropas Dzelzceļa līnijas and RB Rail AS; EUR 78.5m is open for bids today — EUR 68.0m at Jāņavārti–Ogre and a EUR 10.5m diesel-train hire — with EUR 97.6m of Latvijas dzelzceļš packages at the expression-of-interest stage, EUR 47.9m closed to bids with no award published, and EUR 80.4m closed without a winner. A fortieth record carries no value at all: the Riga Central Station engineering consultant and construction supervision, open for tenders to 30 September 2026, which the buyer advertises without a figure. The total sums the headline figure of each record, several of which are framework ceilings rather than contracted prices, and one of which — the eight-lot passenger-infrastructure procedure at EUR 59.8m — is the Atlas's own sum of the published lot values.
Technology areas
Track & civil, Electrification, Signalling & train control, Rolling-stock hardware, Digital operations, Predictive maintenance, Cybersecurity, AI inspection

Key figures

Latvian rail network in 2025 on…1,831 km · 251 km electrifiedLatvian rail network in 2025 on the infrastructure manager's own performance indicators: 1,831 km of operational line, of which 1,798 km broad gauge (367 km double track or more) and 33 km narrow gauge; 3,177 km of overall line length and 2,217 km of main-line track; 251 km of operational electrified line with 632 km of catenary. Gauge is 1520 mm throughout except the 750 mm Gulbene–Alūksne line. The Network Statement 2027, which is the source for gauge, voltage and signalling here, counts the network differently and states its own total as 1,779 km of railway tracks — 1,421 km single track, 350 km double and 8 km multi-track — against the performance indicators' 1,831 km of operational line; it gives the direct-current voltage on the electrified lines as 3.3 kV
2 sources · all primary
  • ● VAS "Latvijas dzelzceļš" · Performance indicators of public rail network in Latvia 2025 (8 pp: network, traffic, signalling and power, fleet, comparative modal data) (published 2026 · checked 2026-09-13)
  • ● VAS "Latvijas dzelzceļš" · Network Statement 2027 (81 pp; §1.6 contacts, §2.3 network description, §2.3.10 signalling) (published 2026 · checked 2026-09-13)
Length of the Latvian 1520 mm n…0 kmLength of the Latvian 1520 mm network fitted with ETCS. The Network Statement 2027 describes signalling on the network as field traffic lights with the automatic locomotive signalling system ALSN, which the control-command TSI classes as a Class B system, and refers vehicle holders to the national ERTMS implementation plan published by the State Railway Technical Inspectorate; it records no ETCS installation. Rail Baltica's new 1435 mm line is to be signalled with ERTMS
3 sources · all primary
  • ● VAS "Latvijas dzelzceļš" · Network Statement 2027 (81 pp; §1.6 contacts, §2.3 network description, §2.3.10 signalling) (published 2026 · checked 2026-09-13)
  • ● SIA "Eiropas Dzelzceļa līnijas" · Rail Baltica pamattrase — Latvian mainline scope, Phase I decision of December 2024, E.R.B. Rail JV framework and works content (published 2026 · checked 2026-09-13)
  • ● Valsts dzelzceļa tehniskā inspekcija · State Railway Technical Inspectorate — NSA Latvia; safety, interoperability, TSI implementation plans (published 2026 · checked 2026-09-13)
Latvian rail freight in 2025: 99.45m tonnes · 2,794m tkmLatvian rail freight in 2025: 9,454 thousand tonnes and 2,794 million net tonne-kilometres, against 41,490 thousand tonnes and 14,494 million tonne-kilometres in 2019; no coal was carried at all in 2025. Freight train-kilometres fell to 1,935 thousand from 8,571 thousand in 2019
1 source · primary
  • ● VAS "Latvijas dzelzceļš" · Performance indicators of public rail network in Latvia 2025 (8 pp: network, traffic, signalling and power, fleet, comparative modal data) (published 2026 · checked 2026-09-13)
Latvian rail passengers in 2025…21.3m passengers · 741m pkmLatvian rail passengers in 2025: 21,333 thousand carried and 741 million passenger-kilometres, both the highest in the seven years the infrastructure manager publishes, against 11,194 thousand and 361 million in 2021; passenger train-kilometres reached 7,843 thousand of a total 10,214 thousand
1 source · primary
  • ● VAS "Latvijas dzelzceļš" · Performance indicators of public rail network in Latvia 2025 (8 pp: network, traffic, signalling and power, fleet, comparative modal data) (published 2026 · checked 2026-09-13)
Rail Baltica's Latvian mainline…202 km · EUR 3.70bn frameworkRail Baltica's Latvian mainline under the Phase I scope the government defined in December 2024: a 1435 mm line of 202 km from the Lithuanian border to Estonia outside Riga, built as a double-track substructure with one track laid, against a FIDIC framework with a maximum contract sum of EUR 3.7 billion held by Rizzani de Eccher, Budimex and Eiffage Génie Civil. The project reports more than 200 km of Latvian Phase I mainline under contract and about 30 km under active construction
3 sources · all primary
  • ● SIA "Eiropas Dzelzceļa līnijas" · Rail Baltica pamattrase — Latvian mainline scope, Phase I decision of December 2024, E.R.B. Rail JV framework and works content (published 2026 · checked 2026-09-13)
  • ● European Union — TED · Contract-award notice (can-standard), EDZL 2021/6 CEF — Rail Baltica pamattrases būvdarbi Latvijā; total value EUR 3,698,833,520.70, winners RIZZANI DE ECCHER S.P.A., BUDIMEX S.A. and EIFFAGE Génie Civil S.A.S (published 2024-01-16 · checked 2026-09-13)
  • ● RB Rail AS · Progress today — country milestones; Latvia >200 km of Phase I mainline under contract, ~30 km under active construction; joint regional rolling-stock procurement (published 2026 · checked 2026-09-13)
Total investment planned under…≈EUR 784m for 2025–2029Total investment planned under the Indicative Railway Infrastructure Development Plan for 2025–2029, approved by the Cabinet of Ministers on 11 November 2025 (Protocol No. 47/29.§), from EU funds, the state budget and Latvijas dzelzceļš together — the spine of the 1520 mm programme alongside Rail Baltica
1 source · primary
  • ● VAS "Latvijas dzelzceļš" · Consolidated Annual Report and Group Sustainability Report for 2025 (275 pp; group structure, reorganisation, investment, Indicative Railway Infrastructure Development Plan 2025–2029, RRF electrification project) (published 2026 · checked 2026-09-13)
What did not place. Three Latvi…EUR 80.4m and five Rail Baltica lotsWhat did not place. Three Latvijas dzelzceļš procedures closed without a winner in the window, two of them with a published value — the EUR 71m zero-emission-train infrastructure works in August 2024 on justification code `other`, and the EUR 9.4m Rīga–Krustpils raised platforms in February 2026 on `ins-fund`, a decision of the buyer because of insufficient funds; the third, the combined-travel overhead-line maintenance machine, closed on `ins-fund` in July 2026 and publishes no value at all, so nothing is counted for it — and five RB Rail lots closed without a holder in March 2026: the Lithuanian rail delivery-points lot and the Pärnu, Skulte and Kaunas ballast lots on `other`, and the Panevėžys ballast lot on `chan-need`. No value is published against any of the five lots
8 sources · all primary
  • ● European Union — TED · Contract-award notice (can-standard), LDz 2023/213-AK — Bezemisiju vilcienu dzelzceļa infrastruktūras attīstība: būvniecība; TenderResultCode clos-nw with non-award justification `other` (published 2024-08-01 · checked 2026-09-13)
  • ● European Union — TED · Contract-award notice (can-standard), LDz2025/180-AK — Paaugstināto platformu būvdarbi dzelzceļa līnijā Rīga - Krustpils; TenderResultCode clos-nw with non-award justification `ins-fund` (published 2026-02-27 · checked 2026-09-13)
  • ● European Union — TED · Contract-award notice (can-standard), RBR2021/15 — Konsolidētās sliežu piegādes; LOT-0001 (delivery points in Latvia) awarded to Saarstahl Rail SAS at EUR 105,215,337.50, LOT-0002 (delivery points in Lithuania) clos-nw on justification `other` (published 2026-03-16 · checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · Contract award notice 178263-2026, 16 March 2026 — RB Rail AS consolidated ballast framework RBR2022/14: LOT-0005 closed without a winner, clos-nw, non-award justification chan-need (published 2026 · checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · Contract award notice 178659-2026, 16 March 2026 — RB Rail AS consolidated ballast framework RBR2022/14: LOT-0002, LOT-0004 and LOT-0006 each closed without a winner, clos-nw, non-award justification other (published 2026 · checked 2026-09-13)
  • ● Publications Office of the European Union · Non-award justification authority table (ins-fund, no-rece, all-rej, chan-need, tech-err, one-admis, other) (published 2026 · checked 2026-09-13)
  • ● European Union — TED · Contract-award notice (can-standard), LDZ 2025/281-AK — Kombinētās gaitas tehnikas kontakttīkla apkopei piegāde; TenderResultCode clos-nw with non-award justification `ins-fund` (published 2026-07-23 · checked 2026-09-13)
  • ● Valsts akciju sabiedrība "Latvijas dzelzceļš" · Contract notice (cn-standard), LDZ2025/281-AK — Kombinētās gaitas tehnikas kontakttīkla apkopei piegāde, deadline 18 May 2026; the notice publishes no value in any value-bearing field (published 2026-04-17 · checked 2026-09-13)
The regulator's own quarterly m…193.4m pkm · 1.91m tonnesThe regulator's own quarterly market statistics for the second quarter of 2026: 2,019,180 passenger train-kilometres and 193,407,742 passenger-kilometres, of which 1,972,625 train-km and 191,466,361 passenger-km under the public service contract; and 1,907,693 tonnes of freight, 499,263,750 tonne-kilometres and 285,065 freight train-kilometres, down 24.1, 22.6 and 20.7 percent on the same quarter of 2025. The passenger figures include an Estonian carrier's data from 2026 and the freight figures a Lithuanian carrier's
1 source · primary
  • ● Valsts dzelzceļa administrācija · Statistikas dati par dzelzceļa pārvadājumiem Latvijas Republikā, 2026. gada II ceturksnis (published 2026-07-28 · checked 2026-09-13)

Buyers

Tenders

TenderBuyerStatusValue bandNext key date
Jāņavārti–Ogre line modernisation design buildLDzOpen$25–100mCloses October 2026
BEMU charging infrastructure design buildLDzPre-bid$25–100mPublished February 2026
Sloka–Tukums II speed increase design buildLDzPre-bid$25–100mPublished February 2026
Latvijas dzelzceļš Imanta–RIX airport design buildLDzPre-bid$5–25mPublished February 2026
Latvijas dzelzceļš Riga Central overhead signallingLDzPre-bid$5–25mPublished February 2026
Torņakalns–Imanta section modernisationLDzBids closed$25–100mBids closed November 2025 · award expected
Latvijas dzelzceļš Rīga–Lugaži passenger infrastructure designLDzBids closed$5–25mBids closed July 2025 · no award published
Pasažieru vilciens diesel train hirePasažieru vilciens (Vivi)Bids closed$5–25mPublished August 2026
Engineering consultant supervision Riga Central Station re-competedEiropas Dzelzceļa līnijas (EDzL)Bids closedvalue not publishedBids closed September 2026 · award expected
Rail Baltica mainline works Latvia FIDICEiropas Dzelzceļa līnijas (EDzL)In executionover $1bnPublished January 2024
Rail Baltica energy subsystem design buildRB RailIn executionover $1bnPublished August 2025
Rail Baltica Riga rail bridge Central StationEiropas Dzelzceļa līnijas (EDzL)In execution$500m–1bnCompletion November 2020
Consolidated turnouts rail expansion joints frameworkRB RailIn execution$500m–1bnPublished March 2026
Autotransporta direkcija battery-electric units regional passengerAutotransporta direkcija (ATD)In execution$100–500mPublished December 2025
Rail Baltica RIX Riga Airport station infrastructureEiropas Dzelzceļa līnijas (EDzL)In execution$100–500mAwarded February 2021
Pasažieru vilciens 32 Škoda 16Ev suburban unitsPasažieru vilciens (Vivi)In execution$100–500mPublished March 2024
Consolidated rail supply Saarstahl Rail LatviaRB RailIn execution$100–500mPublished March 2026
Consolidated sleeper fastening under-sleeper pad frameworkRB RailIn execution$100–500mPublished January 2026
Engineering consultant supervision Riga Central StationEiropas Dzelzceļa līnijas (EDzL)In execution$25–100mPublished February 2025
Latvijas dzelzceļš Riga Sarkandaugava–Mangaļi–ZiemeļblāzmaLDzIn execution$25–100mPublished May 2024
Infrastructure modernisation raise line speedLDzIn execution$25–100mPublished May 2026
Electrified network modernisation development modificationLDzIn execution$25–100mAwarded March 2024
Consolidated ballast supply Iecava LatviaRB RailIn execution$25–100mPublished March 2026
Consolidated cable-duct cable-well frameworks re-estimatedRB RailIn execution$25–100m
Design Latvian Northern Southern mainline sectionsRB RailIn execution$25–100m
Rail Baltica control-command signalling engineering servicesRB RailIn execution$25–100mPublished February 2026
Rail Baltica energy supply subsystem engineeringRB RailIn execution$25–100mPublished October 2024
Rīgas satiksme route 7 tram low-floorRīgas satiksmeIn execution$25–100mPublished June 2024
Rīgas satiksme Brīvības tram depot reconstructionRīgas satiksmeIn execution$25–100mPublished March 2024
Rīgas satiksme tram line extension interchangeRīgas satiksmeIn execution$25–100mPublished December 2024
Salaspils TEN-T intermodal freight terminal designEiropas Dzelzceļa līnijas (EDzL)In execution$5–25mPublished January 2026
RIX airport station design infrastructure viaductEiropas Dzelzceļa līnijas (EDzL)In execution$5–25mPublished January 2026
Engineering consultant supervision RIX airport stationEiropas Dzelzceļa līnijas (EDzL)In execution$5–25mPublished August 2025
Land-management design cadastral survey Rail BalticaEiropas Dzelzceļa līnijas (EDzL)In execution$5–25mPublished February 2025
Latvijas dzelzceļš passenger infrastructure modernisation eight lotsLDzIn executionEUR 5.39m–10.75m per lot contractPublished May 2026
Latvijas dzelzceļš passenger information announcement video systemsLDzIn execution$5–25mPublished May 2026
Design Vangaži–Salaspils–Misa section author supervisionRB RailIn execution$5–25mPublished January 2025
Rīgas satiksme Slokas tram track rebuildRīgas satiksmeIn execution$5–25mPublished June 2024
Zero-emission train infrastructure development worksLDzCancelled$25–100mDate August 2024
Latvijas dzelzceļš Rīga–Krustpils raised platformsLDzCancelled$5–25mDate February 2026

Cities

CityNetwork statusNetworks
Rīgaoperational — Riga tram network under Rīgas satiksme; the Riga railway node on the 1520 mm network with Rīga Pasažieru station, Torņakalns, Zasulauks, Imanta, Sarkandaugava, Mangaļi and the Šķirotava marshalling yard; the Rail Baltica Riga Central Station complex and the RIX airport station under construction; seat of Latvijas dzelzceļš, LatRailNet, LDZ CARGO, Pasažieru vilciens, Eiropas Dzelzceļa līnijas, RB Rail AS, the Ministry of Transport and both rail regulators; no metroRiga trams (Rīgas satiksme); Riga suburban rail (Latvijas dzelzceļš / Pasažieru vilciens); Rail Baltica Riga Central Station and RIX airport station (Eiropas Dzelzceļa līnijas, under construction)
Daugavpilsoperational — Latvia's second tram network, five routes under Daugavpils satiksme; junction on the 1520 mm network towards Krāslava, Indra, Rēzekne and Vilnius, with passenger infrastructure modernisation placed with SIA "3A" on a winner decision of 6 January 2026, published 8 September 2026Daugavpils trams (Daugavpils satiksme)
Liepājaoperational — western terminus of the non-electrified Rīga–Dobele–Liepāja passenger route worked by diesel sets, and a port city with freight access; a municipal tram network operates in the city but no Liepāja tram or rail procurement above the Atlas floor appears in this file's sweep
Jelgavaoperational — terminus of the electrified Rīga–Jelgava suburban route worked by the Škoda 16Ev fleet, and a junction towards Lithuania; the renewed contact line on the Rīga–Jelgava line was placed into temporary operation under the Recovery and Resilience Facility electrification project
Rēzekneoperational — junction on the eastern 1520 mm network towards Zilupe and the Russian border and towards Daugavpils, served by diesel passenger trains from Riga; passenger infrastructure at Rēzekne II was placed with SIA "3A" on a winner decision of 6 January 2026, published 8 September 2026
Ventspilsoperational — freight port on the 1520 mm network with no scheduled passenger service; the freeport authority lets its own access-track work, below the Atlas floor in this file's sweep
Iecavaunder construction — the southern Rail Baltica infrastructure maintenance point and construction logistics base on the 1435 mm mainline, where the E.R.B. Rail JV began site works in March 2025; one of the two Latvian ballast delivery regions in the RB Rail framework and a candidate for the Phase I freight terminal
Salaspilsoperational and under design — station on the electrified Rīga–Ogre–Aizkraukle route, on the Jāņavārti–Ogre modernisation now open for bids; site of the designed Salaspils TEN-T intermodal freight terminal and a candidate for the Rail Baltica Phase I freight terminal and the Daugavkrasti regional station

Players with a footprint here

PlayerKindFootprint
SwietelskyTrack & electrification contractorProject presence
FimaSignalling & systemsProject presence
BindersCivil contractorProject presence
IDOMEngineering consultantProject presence
SatebaTrack technology supplierProject presence
BMGSCivil contractorProject presence
Saarstahl RailTrack technology supplierProject presence
SintagmaEngineering consultantProject presence

What changed

From This Week in Rail, newest first.

  • 2026-10-05 — Latvia's transport minister, Kozlovskis, says Rail Baltica cannot be delivered in Latvia under the current approach. A signal of schedule or scope risk for suppliers positioned on Rail Baltica's Latvian section.
  • 2026-09-28 — Latvia's government backs the country's application for additional EU funding for Rail Baltica.
  • 2026-09-28 — The Baltic states agree priorities for Latvia in the next stage of Rail Baltica.
  • 2026-09-21 — Latvian Railways (LDz) tenders to renovate the facades of Liepāja railway station's buildings B and C.
  • 2026-09-21 — Latvia's government backs launching a merger process for the country's railway-sector institutions.

Withheld in the free surface

  • Capex in this region (3)
  • Market narrative

Full detail withheld: 2 fields. In the European Union edition · See a fully open example

  • Programme profile
  • Eu money
  • Signalling note
  • Electrification note
  • Rolling stock note
  • Freight note
  • Urban note
  • Procurement systems note
  • Market narrative

Full detail withheld: 9 fields. In the European Union edition · See a fully open example

Sources

  • ● SIA "Daugavpils satiksme" · Par Mums — 5 tram and 33 bus routes, 37 tram cars, 26 km of tram track, about 500 employees (published 2026 · checked 2026-09-13)
  • ● Publications Office of the European Union · Non-award justification authority table (ins-fund, no-rece, all-rej, chan-need, tech-err, one-admis, other) (published 2026 · checked 2026-09-13)
  • ● SIA "Eiropas Dzelzceļa līnijas" · Rail Baltica pamattrase — Latvian mainline scope, Phase I decision of December 2024, E.R.B. Rail JV framework and works content (published 2026 · checked 2026-09-13)
  • ● SIA "Eiropas Dzelzceļa līnijas" · Rail Baltica Rīgas Centrālā stacija — informācija par projektu (construction history, BERERIX, substantial completion of the south part on 26 August 2026, 1520 mm completion mid-2028) (published 2026 · checked 2026-09-13)
  • ● SIA "Eiropas Dzelzceļa līnijas" · Rail Baltica stacija RIX Rīgas lidostā — informācija par projektu (4.5 km scope, B.S.L. Infra, Forma2/Prointec, PROSIV design) (published 2026 · checked 2026-09-13)
  • ● Valsts reģionālās attīstības aģentūra — Elektronisko iepirkumu sistēma · EIS home — e-orders, e-auctions, e-tenders, e-certificates (published 2026 · checked 2026-09-13)
  • ● Valsts reģionālās attīstības aģentūra — Elektronisko iepirkumu sistēma · EIS / EPS supplier view: public procurement search (guest access), the system in which Latvian buyers run their tenders (published 2026 · checked 2026-09-13)
  • ● Iepirkumu uzraudzības birojs · Public notice register (Paziņojumi) — national register of Latvian procurement notices, above and below the EU thresholds (published 2026 · checked 2026-09-13)
  • ● Iepirkumu uzraudzības birojs · Procurement Monitoring Bureau — institutional site and links to the register, the contracts register and open data (published 2026 · checked 2026-09-13)
  • ● VAS "Latvijas dzelzceļš" · Consolidated Annual Report and Group Sustainability Report for 2025 (275 pp; group structure, reorganisation, investment, Indicative Railway Infrastructure Development Plan 2025–2029, RRF electrification project) (published 2026 · checked 2026-09-13)
  • ● VAS "Latvijas dzelzceļš" · EU projects — TEN-T: development of a sketch project for electrification of the Latvian railway network; Cohesion Fund project list (published 2026 · checked 2026-09-13)
  • ● VAS "Latvijas dzelzceļš" · Performance indicators of public rail network in Latvia 2025 (8 pp: network, traffic, signalling and power, fleet, comparative modal data) (published 2026 · checked 2026-09-13)
  • ● VAS "Latvijas dzelzceļš" · Network Statement 2027 (81 pp; §1.6 contacts, §2.3 network description, §2.3.10 signalling) (published 2026 · checked 2026-09-13)
  • ● AS "Pasažieru vilciens" · Par mums — founding, ownership, electric and diesel route list, legal details and customer desks (published 2026 · checked 2026-09-13)
  • ● AS "Pasažieru vilciens" · Ilgtspējas un gada pārskats par 2025. gadu (146 pp; fleet, financial indicators, post-balance-sheet events) (published 2026-05-06 · checked 2026-09-13)
  • ● RB Rail AS · Finances — Phase I capex EUR 15.3bn, benefits, CEF share, available funding (published 2026 · checked 2026-09-13)
  • ● RB Rail AS · Procurement Plan 2026 — preliminary list of Rail Baltica tenders by contracting authority (published 2026 · checked 2026-09-13)
  • ● RB Rail AS · Progress today — country milestones; Latvia >200 km of Phase I mainline under contract, ~30 km under active construction; joint regional rolling-stock procurement (published 2026 · checked 2026-09-13)
  • ● RP SIA "Rīgas satiksme" · Par mums — founding, ownership, employees, route counts (published 2026 · checked 2026-09-13)
  • ● Valsts dzelzceļa administrācija · Statistikas dati par dzelzceļa pārvadājumiem Latvijas Republikā, 2026. gada II ceturksnis (published 2026-07-28 · checked 2026-09-13)
  • ● European Union · TED — Tenders Electronic Daily, read through the Search API at https://api.ted.europa.eu/v3/notices/search (published 2026 · checked 2026-09-13)
  • ● European Union — TED · Contract-award notice (can-standard), AD 2022/3 — Jaunu pasažieru pārvadāšanai paredzētu akumulatoru bateriju elektrovilcienu vienību (BEMU) piegāde awarded to Konsorcium ŠKODA TRANSPORTATION – ŠKODA VAGONKA at EUR 157,652,616 (published 2026-08-20 · checked 2026-09-13)
  • ● European Union — TED · Prior information notice (pin-only), SIA "Daugavpils satiksme" — Četrasu tramvaju vagonu iegāde un tramvaju parka modernizācija, CPV 34622100; no value and no date published (published 2026-08-03 · checked 2026-09-13)
  • ● European Union — TED · Contract-award notice (can-standard), EDZL 2021/6 CEF — Rail Baltica pamattrases būvdarbi Latvijā; total value EUR 3,698,833,520.70, winners RIZZANI DE ECCHER S.P.A., BUDIMEX S.A. and EIFFAGE Génie Civil S.A.S (published 2024-01-16 · checked 2026-09-13)
  • ● European Union — TED · Contract-modification notice (can-modif), EDZL2017/2CEF — Rail Baltica Rīgas dzelzceļa tilta, uzbēruma un Rīgas Centrālās pasažieru stacijas kompleksās apbūves būvprojekta izstrāde un būvdarbi; BT-720 EUR 585,423,289.00, tenderers SIA "RERE BŪVE" and N.V. Besix S.A (published 2025-12-26 · checked 2026-09-13)
  • ● European Union — TED · Contract-modification notice (can-modif), EDZL2019/2CEF — Rail Baltica "Starptautiskās lidostas "Rīga"" dzelzceļa stacijas, saistītās infrastruktūras un estakāžu būvdarbi; BT-720 EUR 253,412,036.53 (published 2026-02-03 · checked 2026-09-13)
  • ● European Union — TED · Contract notice (cn-standard), AS Eesti Liinirongid — Rail Baltica regionaalse reisijateveo veeremi hange; the notice states that each contracting authority (Elron, LTG, Vivi) signs its own contract with the successful tenderer and that LTG and Vivi take options rather than an obligation to buy; final deadline 8 September 2026 (published 2026-09-02 · checked 2026-09-13)
  • ● European Union — TED · Contract-award notice (can-standard), RBP2025/34, Rīgas brīvostas pārvalde — access-road rebuild and new road section in the northern part of Kundziņsala, awarded to SIA "ASFALTBŪVE" at EUR 5,767,848.88 against an estimate of EUR 7,830,527; CPV list includes 45234100 (published 2026-01-06 · checked 2026-09-13)
  • ● European Union — TED · Voluntary ex-ante transparency notice (veat), LDz 2025/81-SPN — microprocessor interlocking and dispatcher centralisation for the electrified-network project, EUR 2,285,000, tenderer "ALSTOM Baltics" SIA (published 2026-08-06 · checked 2026-09-13)
  • ● European Union — TED · Contract-modification notice (can-modif), LDZ2023/52-AK — Dzelzceļa elektrificētā tīkla modernizācija un attīstība: būvniecība; BT-720 EUR 63,006,868.93 against BT-161 EUR 58,691,691.69 (published 2026-02-20 · checked 2026-09-13)
  • ● European Union — TED · Contract notice (cn-standard), LDz 2025/300-AK — Dzelzceļa infrastruktūras modernizācija līnijā Jāņavārti-Ogre: projektēšana un būvdarbi; two lots, estimated EUR 36,000,000 and EUR 32,000,000; deadline 20 October 2026 (published 2026-09-04 · checked 2026-09-13)
  • ● European Union — TED · Contract-award notice (can-standard), LDz2025/180-AK — Paaugstināto platformu būvdarbi dzelzceļa līnijā Rīga - Krustpils; TenderResultCode clos-nw with non-award justification `ins-fund` (published 2026-02-27 · checked 2026-09-13)
  • ● European Union — TED · Contract notice (cn-standard), LDz2024/157-AK — Dzelzceļa pasažieru infrastruktūras modernizācija līnijā Rīga-Lugaži-valsts robeža: būvniecība (projektēšana un būvdarbi), estimated EUR 9,900,000; final deadline 29 July 2025 (published 2025-07-10 · checked 2026-09-13)
  • ● European Union — TED · Contract notice (cn-standard), LDz 2026/208_AK — Iecirkņa Rīga-Lugaži aprīkošana ar mikroprocesoru dispečeru centralizācijas sistēmu, estimated EUR 3,000,000, deadline 14 October 2026 (published 2026-09-14 · checked 2026-09-13)
  • ● European Union — TED · Contract-award notice (can-standard), LDZ 2025/281-AK — Kombinētās gaitas tehnikas kontakttīkla apkopei piegāde; TenderResultCode clos-nw with non-award justification `ins-fund` (published 2026-07-23 · checked 2026-09-13)
  • ● European Union — TED · Contract notice (cn-standard), LDz2024/129-AK — Dzelzceļa infrastruktūras modernizācija posmā Torņakalns-Imanta: būvniecība, estimated EUR 38,000,000; final participation deadline 27 November 2025 (published 2025-11-10 · checked 2026-09-13)
  • ● European Union — TED · Contract-award notice (can-standard), LDz 2023/213-AK — Bezemisiju vilcienu dzelzceļa infrastruktūras attīstība: būvniecība; TenderResultCode clos-nw with non-award justification `other` (published 2024-08-01 · checked 2026-09-13)
  • ● European Union — TED · Contract notice (cn-standard), AS"PV"2026/29 — Dīzeļvilcienu noma, estimated EUR 10,500,000; requests to participate by 16 September 2026 (published 2026-08-11 · checked 2026-09-13)
  • ● European Union — TED · Contract-modification notice (can-modif), AS"PV" 2015/37 — Piepilsētas pasažieru elektrovilcienu un to uzturēšanai nepieciešamā aprīkojuma piegāde un personāla apmācība; BT-720 EUR 241,888,753, tenderer ŠKODA VAGONKA a.s. (published 2024-03-20 · checked 2026-09-13)
  • ● European Union — TED · Contract-award notice (can-standard), RBR2022/14 — Konsolidētās dzelzceļa balasta piegādes, LOT-0000 Iecava region in Latvia, framework value EUR 53,625,000, winners Baltic Stone Terminal OU, Bremanger Querry AS and Graniet Import Benelux BV (published 2026-03-16 · checked 2026-09-13)
  • ● European Union — TED · Contract-modification notice (can-modif), RBR2020/18 — Inženiertehniskie pakalpojumi Rail Baltica kontroles, vadības un signalizācijas apakšsistēmas ieviešanas sagatavošanai, iepirkumam un uzraudzībai; BT-720 EUR 33,531,055.50, tenderers ITALFERR S.P.A., SYSTRA SA and EGIS Rail SA (published 2026-02-12 · checked 2026-09-13)
  • ● European Union — TED · Contract-award notice (can-standard), RBR2022/7 — Rail Baltica enerģijas apgādes apakšsistēmas projektēšana un būvniecība; total value EUR 1,765,049,110.22, winners ELECNOR SERVICIOS Y PROYECTOS, S.A.U. and COBRA INSTALACIONES Y SERVICIOS S.A (published 2025-08-08 · checked 2026-09-13)
  • ● European Union — TED · Contract-award notice (can-standard), RBR2021/15 — Konsolidētās sliežu piegādes; LOT-0001 (delivery points in Latvia) awarded to Saarstahl Rail SAS at EUR 105,215,337.50, LOT-0002 (delivery points in Lithuania) clos-nw on justification `other` (published 2026-03-16 · checked 2026-09-13)
  • ● European Union — TED · Contract-award notice (can-standard), RBR2021/13 — Konsolidētās dzelzceļa gulšņu piegādes; framework value EUR 363,045,107.25, winners "Sateba Estonia" OÜ, Sateba Lithuania UAB, Sateba France AS and Wytwornia Podkladow Strunobetonowych S.A. (published 2026-01-13 · checked 2026-09-13)
  • ● European Union — TED · Contract-award notice (can-standard), RBR2021/2 — Konsolidētās dzelzceļa pārmiju pārvedu un sliežu ceļa kompensatoru piegādes; framework value EUR 473,186,295.10 across three lots, winners SIA "voestalpine Railway Systems Latvia" and voestalpine Turnout Technology Germany GmbH (published 2026-03-13 · checked 2026-09-13)
  • ● European Union — TED · Contract-award notice (can-standard) — Tramvaju Škoda 15T bremžu bloku atjaunošana framework, EUR 3,200,000, holders AS "Daugavpils Lokomotīvju Remonta Rūpnīca", DAKO-CZ a.s., Newag Inteco DS S.A. and ZUTMAR Sp. z o.o. (published 2026-08-19 · checked 2026-09-13)
  • ● European Union — TED · Contract-modification notice (can-modif) — Tramvaju depo ražošanas ēku pārbūve Brīvības ielā 191, Rīgā; BT-720 EUR 31,733,362.29, tenderer SIA "AIMASA" (published 2024-03-11 · checked 2026-09-13)
  • ● European Union — TED · Contract-modification notice (can-modif) — Būvniecības ieceres "Tramvaja līnijas pagarinājuma, transportmijas punkta un ar tiem saistīto ēku un inženierbūvju" īstenošana; total value EUR 28,155,811, tenderer Ceļu būves firma SIA "BINDERS" (published 2024-12-12 · checked 2026-09-13)
  • ● European Union — TED · Contract-award notice (can-standard) — Tramvaja Škoda 15T vilces dzinēju apkopes un/vai remonta darbu veikšana awarded to ŠKODA ELECTRIC a.s. at EUR 3,939,728 (published 2026-01-19 · checked 2026-09-13)
  • ● European Union — TED · Contract-modification notice (can-modif) — Tramvaja infrastruktūras pielāgošana zemās grīdas tramvaja parametriem, 7. tramvaja maršruts; BT-720 EUR 22,720,184.26, tenderer Ceļu būves firma SIA "BINDERS" (published 2024-06-24 · checked 2026-09-13)
  • ● European Union — TED · Contract-modification notice (can-modif) — Tramvaja sliežu ceļu pārbūve Slokas ielā; BT-720 EUR 6,674,570, tenderer AS "A.C.B." (published 2024-06-24 · checked 2026-09-13)

Browse: the Atlas · European Union · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.