Rail Baltica mainline works Latvia FIDIC
Eiropas Dzelzceļa līnijas — Rail Baltica mainline works in Latvia, a FIDIC framework held by Rizzani de Eccher, Budimex and Eiffage Génie Civil
Awarded to Rizzani de Eccher — Sabiedrība ar ierobežotu atbildību "EIROPAS DZELZCEĻA LĪNIJAS" now holds 2 positions with this supplier.
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the European Union edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Buyer
- Sabiedrība ar ierobežotu atbildību "EIROPAS DZELZCEĻA LĪNIJAS"
- Where
- Latvia
- Segments
- Track, Civil works, Stations & depots
- Technology areas
- Track & civil
- Status
- In execution — Contract-award notice 30747-2024 of January 2024 records a total value with RIZZANI DE ECCHER S.P.A., BUDIMEX S.A.
- Value band
- over $1bn
- Currency
- EUR
- Key dates (month)
- Published January 2024 · Modification published August 2025 · Phase one scope decision December 2024 · Site setup started March 2025
Status in full
Read more
Contract-award notice 30747-2024 of January 2024 records a total value with RIZZANI DE ECCHER S.P.A., BUDIMEX S.A. and EIFFAGE Génie Civil S.A.S as winners; contract-modification notice 506803-2025 of August 2025 carries a revised total against the earlier award value. The implementing body states that this is a FIDIC framework agreement setting a maximum contract sum and that the cost of each individual route section is calculated once the detailed design is received, so the figure is a ceiling rather than a contracted price for a defined scope. Works began in the priority southern section; around 30 km of Latvian mainline is under active construction on the project's own report.
Next step
Recorded award: Rizzani de Eccher — Rizzani de Eccher S.p.A is one of the three members of the partnership holding the Rail Baltica Latvian mainline works framework, a FIDIC framework with a maximum contract sum
Withheld in the free surface
- Full scope
- Exact value
- How the figure was arrived at
- Key dates (4)
- Published bidders
Full detail withheld: 5 fields. In the European Union edition · See a fully open example
4 sources · all primary
- ● European Union — TED · Contract-award notice (can-standard), EDZL 2021/6 CEF — Rail Baltica pamattrases būvdarbi Latvijā; total value EUR 3,698,833,520.70, winners RIZZANI DE ECCHER S.P.A., BUDIMEX S.A. and EIFFAGE Génie Civil S.A.S (published 2024-01-16 · checked 2026-09-13)
- ● European Union — TED · Contract-modification notice (can-modif), EDZL2021/6CEF — the same framework at BT-720 EUR 3,700,232,337.65 against BT-161 EUR 3,698,833,520.70 (published 2025-08-01 · checked 2026-09-13)
- ● SIA "Eiropas Dzelzceļa līnijas" · Rail Baltica pamattrase — Latvian mainline scope, Phase I decision of December 2024, E.R.B. Rail JV framework and works content (published 2026 · checked 2026-09-13)
- ● RB Rail AS · Progress today — country milestones; Latvia >200 km of Phase I mainline under contract, ~30 km under active construction; joint regional rolling-stock procurement (published 2026 · checked 2026-09-13)
Related tenders
Same buyer first, then the same segment in this market.
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Rail Baltica Riga rail bridge Central Station | Eiropas Dzelzceļa līnijas (EDzL) | In execution | $500m–1bn | Completion November 2020 |
| Rail Baltica RIX Riga Airport station infrastructure | Eiropas Dzelzceļa līnijas (EDzL) | In execution | $100–500m | Awarded February 2021 |
| Engineering consultant supervision Riga Central Station | Eiropas Dzelzceļa līnijas (EDzL) | In execution | $25–100m | Published February 2025 |
Show all 6 related tenders
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Engineering consultant supervision Riga Central Station re-competed | Eiropas Dzelzceļa līnijas (EDzL) | Bids closed | value not published | Bids closed September 2026 · award expected |
| Salaspils TEN-T intermodal freight terminal design | Eiropas Dzelzceļa līnijas (EDzL) | In execution | $5–25m | Published January 2026 |
| Engineering consultant supervision RIX airport station | Eiropas Dzelzceļa līnijas (EDzL) | In execution | $5–25m | Published August 2025 |