Rail Baltica mainline works Latvia FIDIC

Eiropas Dzelzceļa līnijas — Rail Baltica mainline works in Latvia, a FIDIC framework held by Rizzani de Eccher, Budimex and Eiffage Génie Civil

Awarded to Rizzani de Eccher — Sabiedrība ar ierobežotu atbildību "EIROPAS DZELZCEĻA LĪNIJAS" now holds 2 positions with this supplier.

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the European Union edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Buyer
Sabiedrība ar ierobežotu atbildību "EIROPAS DZELZCEĻA LĪNIJAS"
Where
Latvia
Segments
Track, Civil works, Stations & depots
Technology areas
Track & civil
Status
In execution — Contract-award notice 30747-2024 of January 2024 records a total value with RIZZANI DE ECCHER S.P.A., BUDIMEX S.A.
Value band
over $1bn
Currency
EUR
Key dates (month)
Published January 2024 · Modification published August 2025 · Phase one scope decision December 2024 · Site setup started March 2025

Status in full

Read more

Contract-award notice 30747-2024 of January 2024 records a total value with RIZZANI DE ECCHER S.P.A., BUDIMEX S.A. and EIFFAGE Génie Civil S.A.S as winners; contract-modification notice 506803-2025 of August 2025 carries a revised total against the earlier award value. The implementing body states that this is a FIDIC framework agreement setting a maximum contract sum and that the cost of each individual route section is calculated once the detailed design is received, so the figure is a ceiling rather than a contracted price for a defined scope. Works began in the priority southern section; around 30 km of Latvian mainline is under active construction on the project's own report.

Next step

In execution — awarded and under way.

Read the notice: European Union — TED ↗

Recorded award: Rizzani de Eccher — Rizzani de Eccher S.p.A is one of the three members of the partnership holding the Rail Baltica Latvian mainline works framework, a FIDIC framework with a maximum contract sum

Withheld in the free surface

  • Full scope
  • Exact value
  • How the figure was arrived at
  • Key dates (4)
  • Published bidders

Full detail withheld: 5 fields. In the European Union edition · See a fully open example

4 sources · all primary
  • ● European Union — TED · Contract-award notice (can-standard), EDZL 2021/6 CEF — Rail Baltica pamattrases būvdarbi Latvijā; total value EUR 3,698,833,520.70, winners RIZZANI DE ECCHER S.P.A., BUDIMEX S.A. and EIFFAGE Génie Civil S.A.S (published 2024-01-16 · checked 2026-09-13)
  • ● European Union — TED · Contract-modification notice (can-modif), EDZL2021/6CEF — the same framework at BT-720 EUR 3,700,232,337.65 against BT-161 EUR 3,698,833,520.70 (published 2025-08-01 · checked 2026-09-13)
  • ● SIA "Eiropas Dzelzceļa līnijas" · Rail Baltica pamattrase — Latvian mainline scope, Phase I decision of December 2024, E.R.B. Rail JV framework and works content (published 2026 · checked 2026-09-13)
  • ● RB Rail AS · Progress today — country milestones; Latvia >200 km of Phase I mainline under contract, ~30 km under active construction; joint regional rolling-stock procurement (published 2026 · checked 2026-09-13)

Related tenders

Same buyer first, then the same segment in this market.

TenderBuyerStatusValue bandNext key date
Rail Baltica Riga rail bridge Central StationEiropas Dzelzceļa līnijas (EDzL)In execution$500m–1bnCompletion November 2020
Rail Baltica RIX Riga Airport station infrastructureEiropas Dzelzceļa līnijas (EDzL)In execution$100–500mAwarded February 2021
Engineering consultant supervision Riga Central StationEiropas Dzelzceļa līnijas (EDzL)In execution$25–100mPublished February 2025
Show all 6 related tenders
TenderBuyerStatusValue bandNext key date
Engineering consultant supervision Riga Central Station re-competedEiropas Dzelzceļa līnijas (EDzL)Bids closedvalue not publishedBids closed September 2026 · award expected
Salaspils TEN-T intermodal freight terminal designEiropas Dzelzceļa līnijas (EDzL)In execution$5–25mPublished January 2026
Engineering consultant supervision RIX airport stationEiropas Dzelzceļa līnijas (EDzL)In execution$5–25mPublished August 2025

Browse: the Atlas · European Union · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.