Design Latvian Northern Southern mainline sections

RB Rail — design works and author supervision for the Latvian Northern and Southern mainline sections, two lots across the procedure

Awarded to Ineco — RB Rail AS now holds 1 position with this supplier.

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the European Union edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Buyer
RB Rail AS
Where
Latvia
Segments
Consultancy, Track
Technology areas
Track & civil
Status
In execution — One procedure, RBR 2019/7, with two lots, and the notices attribute each value to its lot.
Value band
$25–100m
Currency
EUR
Key dates (month)
Lot0001 modification published April 2025 · Lot0002 modification published January 2025 · Lot0002 first modifications published February 2024

Status in full

Read more

One procedure, RBR 2019/7, with two lots, and the notices attribute each value to its lot. LOT-0001, titled “1.daļa (Igaunijas/ Latvijas valsts robeža - Vangaži)”, is tender 4 and is held by Ingenieria Y Economia Del Transporte S.M.E. M.P.S.A. with Ardanuy Ingenieria S.A: modification notice 269394-2025 of April 2025 carries a BT-720 figure. LOT-0002 is tender 6 and is held by IDOM, Consulting, Engineering, Architecture S.A.U.: two modification notices published in February 2024, dispatched two seconds apart, both carry the same figure — 87884-2024 adds site-investigation and enlarged-structure design work with an eight-month extension to all DP3 deliverables, and 87455-2024 states that it changes neither the time of performance nor the remuneration, only the payment schedule — and notice 27420-2025 of January 2025 carries a further figure. Two lots on one framework; the two sets of names are two lot holders and not a discrepancy.

Next step

In execution — awarded and under way.

Read the notice: European Union — TED ↗

Recorded award: Ineco — Ingenieria Y Economia Del Transporte S.M.E. M.P.S.A. is named with Ardanuy Ingenieria S.A on the April 2025 modification of the design and author supervision contract for the Latvian Northern and Southern mainline sections

Withheld in the free surface

  • Full scope
  • Exact value
  • How the figure was arrived at
  • Key dates (3)
  • Published bidders

Full detail withheld: 5 fields. In the European Union edition · See a fully open example

5 sources · all primary
  • ● European Union — TED · Contract-modification notice (can-modif), RBR2019/7 — Būvprojektēšanas darbi un autoruzraudzība sliežu ceļa pamatlīnijai Latvijas Ziemeļu un Dienvidu posmiem; BT-720 EUR 22,501,073.70, tenderers Ingenieria Y Economia Del Transporte S.M.E. M.P.S.A. and Ardanuy Ingenieria S.A (published 2025-04-25 · checked 2026-09-13)
  • ● European Union — TED · Contract-modification notice (can-modif), RBR2019/7 — the same procedure at BT-720 EUR 8,499,764.56, tenderer IDOM, Consulting, Engineering, Architecture S.A.U. (published 2025-01-15 · checked 2026-09-13)
  • ● RB Rail AS · Contract-modification notice (can-modif), RBR 2019/7 — LOT-0002, tender 6, IDOM; adds EUR 1,269,282.86 of site-investigation and enlarged-structure design work and an eight-month extension to all DP3 deliverables; BT-720 EUR 6,903,802.50 (published 2024-02-12 · checked 2026-09-13)
  • ● RB Rail AS · Contract-modification notice (can-modif), RBR 2019/7 — LOT-0002, tender 6, IDOM; dispatched two seconds after 87884-2024 and stating that it changes neither the time of performance nor the remuneration, only the payment schedule; BT-720 EUR 6,903,802.50 (published 2024-02-12 · checked 2026-09-13)
  • ● RB Rail AS · Progress today — country milestones; Latvia >200 km of Phase I mainline under contract, ~30 km under active construction; joint regional rolling-stock procurement (published 2026 · checked 2026-09-13)

Related tenders

Same buyer first, then the same segment in this market.

TenderBuyerStatusValue bandNext key date
RB Rail Kaunas node Polish border designRB RailIn execution$25–100mPublished August 2025
RB Rail Vilnius node Kaunas design supervisionRB RailCancelledvalue not published on the noticeDate February 2025
RB Rail Kaunas urban node design supervisionRB RailCancelledvalue not published on the noticeDate August 2025
Show all 6 related tenders
TenderBuyerStatusValue bandNext key date
Rail Baltica energy subsystem design buildRB RailIn executionover $1bnPublished August 2025
Consolidated turnouts rail expansion joints frameworkRB RailIn execution$500m–1bnPublished March 2026
RB Rail Kaunas–Ramygala track design supervisionRB RailIn execution$5–25mPublished February 2025

Browse: the Atlas · European Union · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.