Estonia
10 buyers · 49 tenders · checked 2026-10-03
Rail Baltica 213 km new line Tallinn-Latvia with EUR 1.86bn work, alliances signed May 2025 EUR 932.0m; existing network electrification and signalling renewal programs underway.
Everything here is free. One market edition opens in full with one email. Open your free edition
0Metro systems operating
10Buyers tracked
49Tenders tracked
- Live pipeline
- EUR 2.38bn of valued rail contracts in execution — EUR 2,383,399,033.28 across 44 records, the earliest concluded on 9 August 2022 and the latest on 17 August 2026, of which EUR 1,858,732,909.83 across 28 records is Rail Baltic Estonia and EUR 450,888,607.52 across 13 records is Eesti Raudtee. Within that, EUR 1.56bn is Rail Baltica main-line works across twelve records including the EUR 932.0m alliance pair, whose figure includes the strategic-materials purchase option, and EUR 250.9m is Eesti Raudtee electrification. Two competitions are open on the run date: the Tallinn tram purchase at a published estimate of EUR 88.0m, closing for requests to participate on 3 November 2026, and Eesti Raudtee's CCS module buildings on the (Tapa)–Narva section, closing for tenders on 13 October 2026 with no value published. One competition is closed and unresolved — the joint Baltic Rail Baltica regional train order, whose deadline passed on 8 September 2026 with no compliant tender — and two procedures closed without a winner, each carrying the buyer's own published reason.
- Technology areas
- Track & civil, Signalling & train control, Electrification, Rolling-stock hardware, Digital operations, Predictive maintenance, Cybersecurity, AI inspection
Key figures
Statistics Estonia's railway tr…2,124 km · 233 km electrified
7 sources · all primary
- ● Statistikaamet (Statistics Estonia) · Table KVT026, railways registered in the Estonian railway traffic register, read through the PxWeb API: for 2024, length of railway 2,124 km in all, 1,494 km public and 630 km non-public; electrified running tracks 233 km, all of it public; running tracks 1,171 km of which 926 km public; 80 stations; 532 level crossings of which 182 with automatic signals (published 2026 · checked 2026-09-13)
- ● Kliimaministeerium (Ministry of Climate) · Liikuvus — Raudtee: the ministry's own rail page, last updated 16 April 2025. It states that the ministry coordinates the development of railway infrastructure, logistics, passenger and freight transport and rolling stock and of traffic and environmental safety, participates in fare policy and concludes public service contracts with railway undertakings; that Estonia has over 2,000 km of railway of which most belongs to AS Eesti Raudtee and Edelaraudtee Infrastruktuuri AS; and its table gives public railway 1,540 km, non-public 624 km, 2,164 km in all, with electrified railway 132 km on the public network and none on the non-public network (published 2025-04-16 · checked 2026-09-13)
- ● Konkurentsiamet (Estonian Competition Authority) · Raudtee valdkonna tutvustus — the authority's own statement of its rail mandate, the complaints it decides under the Railway Act, and the two public-use infrastructure managers with their network lengths (AS Eesti Raudtee 1229 km, Edelaraudtee Infrastruktuuri AS 223.8 km); page last updated 13 July 2026 (published 2026-07-13 · checked 2026-09-13)
- ● AS Eesti Raudtee · Ettevõttest — company profile, network and staff figures (published 2026 · checked 2026-09-13)
- ● AS Eesti Raudtee · Aastaraamat 2025 (annual report, audited by AS PricewaterhouseCoopers) — 146 pages: revenue EUR 31.2m, EBITDA EUR 37.2m, investment EUR 142.1m, 704 employees, 2.87 million tonnes of freight carried on the network, 6.59 million passengers on Eesti Raudtee infrastructure and 7.66 million in Estonia, 5.16 million passenger train-km, 1,709 million gross tonne-km of which 892 million freight, and EUR 140.7m of investment planned for 2026 (published 2026 · checked 2026-09-13)
- ● AS Eesti Raudtee · Raudteevõrgustiku teadaanne 2025/2026 liiklusgraafikuperioodiks, 14.12.2025 kuni 12.12.2026, version 1.3 of 4 December 2025 (board decision 864/9) — 79 pages (published 2025-12-04 · checked 2026-09-13)
- ● AS Eesti Raudtee · Raudteevõrgustiku teadaanne 2026/2027 liiklusgraafikuperioodiks, 13.12.2026 kuni 11.12.2027, version 1.0 of 9 December 2025 (board decision 865/1) — 77 pages (published 2025-12-09 · checked 2026-09-13)
The Government's action plan st…two public-railway managers
4 sources · all primary
- ● Vabariigi Valitsus (Government of the Republic of Estonia) / Kliimaministeerium · Avaliku raudteeinfrastruktuuri arendamist suunav tegevuskava aastateks 2021–2028, confirmed by the Government under Railway Act section 73(1) — 22 pages: two public railway managers, state-owned AS Eesti Raudtee and privately owned Edelaraudtee AS; EUR 840.2 million to be invested in AS Eesti Raudtee infrastructure over 2021–2028 and EUR 45.8 million in Edelaraudtee AS infrastructure; electrification of Tallinn–Narva, Tapa–Tartu–Valga and Tartu–Koidula costed at EUR 274.2 million; Haapsalu restoration stage II Risti–Haapsalu–Rohuküla at EUR 80 million and electrification non-eligible costs at EUR 31 million still to be found; Tallinn ring railway estimated at about EUR 112 million; Valga–Koidula reconstruction and reopening to passenger trains at EUR 42–45 million; level-crossing safety 2021–2024 about EUR 14.2 million covering 123 crossings. The strings ERTMS and ETCS appear nowhere in the document (published 2021 · checked 2026-09-13)
- ● Edelaraudtee aktsiaselts · Raudteevõrgustiku teadaanne liiklusgraafikuperioodiks 13.12.2026 – 11.12.2027, approved by order EDI-2026-KK-7 of 30 January 2026 — 34 pages; the manager of the public network on the Tallinn-Väike–Lelle–Türi–Viljandi, Lelle–Pärnu and Liiva–Ülemiste lines, about 222 km, 1520/1524 mm, no electrification and no ETCS anywhere in the document (published 2026-01-30 · checked 2026-09-13)
- ● Republic of Estonia — e-Äriregister (e-Business Register) · Edelaraudtee aktsiaselts, registry code 10786958; former name Edelaraudtee Infrastruktuuri AS; share capital EUR 274,820; sole ownership through the holder account of AS GO GROUP (registry code 11071150) (published 2026 · checked 2026-09-13)
- ● Konkurentsiamet (Estonian Competition Authority) · Raudtee valdkonna tutvustus — the authority's own statement of its rail mandate, the complaints it decides under the Railway Act, and the two public-use infrastructure managers with their network lengths (AS Eesti Raudtee 1229 km, Edelaraudtee Infrastruktuuri AS 223.8 km); page last updated 13 July 2026 (published 2026-07-13 · checked 2026-09-13)
Both existing public networks r…1520/1524 mm today, 1435 mm being built
4 sources · all primary
- ● AS Eesti Raudtee · Raudteevõrgustiku teadaanne 2026/2027 liiklusgraafikuperioodiks, 13.12.2026 kuni 11.12.2027, version 1.0 of 9 December 2025 (board decision 865/1) — 77 pages (published 2025-12-09 · checked 2026-09-13)
- ● Edelaraudtee aktsiaselts · Raudteevõrgustiku teadaanne liiklusgraafikuperioodiks 13.12.2026 – 11.12.2027, approved by order EDI-2026-KK-7 of 30 January 2026 — 34 pages; the manager of the public network on the Tallinn-Väike–Lelle–Türi–Viljandi, Lelle–Pärnu and Liiva–Ülemiste lines, about 222 km, 1520/1524 mm, no electrification and no ETCS anywhere in the document (published 2026-01-30 · checked 2026-09-13)
- ● OÜ Rail Baltic Estonia · Korduma kippuvad küsimused — programme parameters: 870 km in the three states of which 213 km in Estonia, 1435 mm, 249 km/h passenger and 120 km/h freight design speed, two international terminals and twelve local stops, EUR 15.3bn by end-2030 with up to 85 per cent EU funding, and about EUR 3.1bn invested through Rail Baltic Estonia (published 2026 · checked 2026-09-13)
- ● Aktsiaselts Tallinna Linnatransport · Trammiliikluse ajalugu — 'Põhiline, mis on jäänud, on rööbastee rajalaius – 1067 mm ehk pool sülda, nagu see 1888. aastal maha pandi' (published 2026 · checked 2026-09-13)
Neither Estonian network statem…no Class A system installed
4 sources · all primary
- ● AS Eesti Raudtee · Raudteevõrgustiku teadaanne 2026/2027 liiklusgraafikuperioodiks, 13.12.2026 kuni 11.12.2027, version 1.0 of 9 December 2025 (board decision 865/1) — 77 pages (published 2025-12-09 · checked 2026-09-13)
- ● AS Eesti Raudtee · Raudteevõrgustiku teadaanne 2025/2026 liiklusgraafikuperioodiks, 14.12.2025 kuni 12.12.2026, version 1.3 of 4 December 2025 (board decision 864/9) — 79 pages (published 2025-12-04 · checked 2026-09-13)
- ● Edelaraudtee aktsiaselts · Raudteevõrgustiku teadaanne liiklusgraafikuperioodiks 13.12.2026 – 11.12.2027, approved by order EDI-2026-KK-7 of 30 January 2026 — 34 pages; the manager of the public network on the Tallinn-Väike–Lelle–Türi–Viljandi, Lelle–Pärnu and Liiva–Ülemiste lines, about 222 km, 1520/1524 mm, no electrification and no ETCS anywhere in the document (published 2026-01-30 · checked 2026-09-13)
- ● Vabariigi Valitsus (Government of the Republic of Estonia) / Kliimaministeerium · Avaliku raudteeinfrastruktuuri arendamist suunav tegevuskava aastateks 2021–2028, confirmed by the Government under Railway Act section 73(1) — 22 pages: two public railway managers, state-owned AS Eesti Raudtee and privately owned Edelaraudtee AS; EUR 840.2 million to be invested in AS Eesti Raudtee infrastructure over 2021–2028 and EUR 45.8 million in Edelaraudtee AS infrastructure; electrification of Tallinn–Narva, Tapa–Tartu–Valga and Tartu–Koidula costed at EUR 274.2 million; Haapsalu restoration stage II Risti–Haapsalu–Rohuküla at EUR 80 million and electrification non-eligible costs at EUR 31 million still to be found; Tallinn ring railway estimated at about EUR 112 million; Valga–Koidula reconstruction and reopening to passenger trains at EUR 42–45 million; level-crossing safety 2021–2024 about EUR 14.2 million covering 123 crossings. The strings ERTMS and ETCS appear nowhere in the document (published 2021 · checked 2026-09-13)
The Estonian section of Rail Ba…213 km, whole route under contract
4 sources · all primary
- ● OÜ Rail Baltic Estonia · News, 17 December 2025: Rail Baltica edeneb terves Baltikumis, ehitustegevus laieneb kogu Eesti põhitrassile — the whole main line under construction contracts, more than 100 km in active construction, about 86 per cent of the route secured, about EUR 1.1bn of commitments signed (published 2025-12-17 · checked 2026-09-13)
- ● Kliimaministeerium (Ministry of Climate) · News, 19 May 2026: Balti transpordiministrid arutasid Tallinnas Rail Balticu ehitust — the whole main line covered by construction contracts and active construction on more than 100 km (published 2026-05-19 · checked 2026-09-13)
- ● OÜ Rail Baltic Estonia · News, 12 August 2026: Viimane Rail Baltica lõik sai heakskiidu — the Pärnu–Kabli environmental impact assessment declared compliant by TTJA; 'Eesti eesmärk on luua valmisolek avada liiklus Rail Baltical aastal 2030' (published 2026-08-12 · checked 2026-09-13)
- ● OÜ Rail Baltic Estonia · Korduma kippuvad küsimused — programme parameters: 870 km in the three states of which 213 km in Estonia, 1435 mm, 249 km/h passenger and 120 km/h freight design speed, two international terminals and twelve local stops, EUR 15.3bn by end-2030 with up to 85 per cent EU funding, and about EUR 3.1bn invested through Rail Baltic Estonia (published 2026 · checked 2026-09-13)
Rail Baltic Estonia has let EUR…EUR 1.86bn let by Rail Baltic Estonia
6 sources · all primary
- ● Tenders Electronic Daily (TED) · Contract award notice 329183-2025, 22 May 2025 — Rail Baltica Ülemiste-Pärnu, Pärnu–Läti piir põhitrassi projekteerimine ja ehitus (Allianss): LOT-0001 'Allianss 1 Ülemiste-Pärnu lõik' EUR 540,000,000 and LOT-0002 'Allianss 2 Pärnu–Ikla' EUR 392,000,000, both concluded 16 May 2025, twelve winners with the tendering-party-leader flag on GRK Eesti AS and Bouygues Travaux Publics (published 2025 · checked 2026-09-13)
- ● Tenders Electronic Daily (TED) · Contract award notice 533326-2024, 5 September 2024 — Rail Baltica Raplamaa põhitrassi raudteetaristu IV etapi ehitustööd lõigul Alu - Kärpla, buyer reference 273438, EUR 87,842,256.17 (published 2024 · checked 2026-09-13)
- ● Tenders Electronic Daily (TED) · Contract award notice 335835-2025, 23 May 2025 — Rail Baltic Ülemiste rahvusvahelise reisiterminali ehitustööd, buyer reference 282839, EUR 84,796,799.14 to Aktsiaselts Merko Ehitus Eesti, contract concluded 21 May 2025 (published 2025 · checked 2026-09-13)
- ● Tenders Electronic Daily (TED) · Contract modification notice 483341-2025, 24 July 2025 (dispatched 22 July 2025) — Soodevahe - Kangru, BT-720 EUR 73,792,051.70, tenderers Verston Eesti OÜ and Osaühing Järelpinge Inseneribüroo (published 2025 · checked 2026-09-13)
- ● Tenders Electronic Daily (TED) · Contract award notice 157363-2025, 11 March 2025 — Rail Baltica Raplamaa põhitrassi raudteetaristu V etapi ehitustööd lõigul Kärpla-Selja, buyer reference 283556, EUR 67,622,114.00 to AS TREV-2 Grupp (published 2025 · checked 2026-09-13)
- ● Tenders Electronic Daily (TED) · Contract award notice 687755-2024, 12 November 2024 — Rail Baltica Harjumaa põhitrassi raudteetaristu III etapi ehitustööd lõigul Kangru - Saku, buyer reference 273827, EUR 67,234,567.89 to INF INFRA OÜ, contract concluded 11 November 2024 (published 2024 · checked 2026-09-13)
AS Eesti Raudtee's electrificat…3 kV DC to 25 kV AC, 800 km target
4 sources · all primary
- ● AS Eesti Raudtee · Projektid — käimasolevad projektid: the electrification project at EUR 273.9m with EUR 192.0m of Cohesion Fund and EUR 81.9m of national co-financing, running 2022 Q1 to 30 June 2028 and aiming to extend electrified track to 800 km with a first stage to about 500 km; the CCS signalling renewal on six sections and about 50 stations at a little over EUR 115 million; and the traffic-management automation project with INDRA SISTEMAS S.A. at EUR 18.4 million (published 2026 · checked 2026-09-13)
- ● AS Eesti Raudtee · Raudteevõrgustiku teadaanne 2026/2027 liiklusgraafikuperioodiks, 13.12.2026 kuni 11.12.2027, version 1.0 of 9 December 2025 (board decision 865/1) — 77 pages (published 2025-12-09 · checked 2026-09-13)
- ● AS Eesti Raudtee · Raudteevõrgustiku teadaanne 2025/2026 liiklusgraafikuperioodiks, 14.12.2025 kuni 12.12.2026, version 1.3 of 4 December 2025 (board decision 864/9) — 79 pages (published 2025-12-04 · checked 2026-09-13)
- ● AS Eesti Raudtee · Aastaraamat 2025 (annual report, audited by AS PricewaterhouseCoopers) — 146 pages: revenue EUR 31.2m, EBITDA EUR 37.2m, investment EUR 142.1m, 704 employees, 2.87 million tonnes of freight carried on the network, 6.59 million passengers on Eesti Raudtee infrastructure and 7.66 million in Estonia, 5.16 million passenger train-km, 1,709 million gross tonne-km of which 892 million freight, and EUR 140.7m of investment planned for 2026 (published 2026 · checked 2026-09-13)
Statistics Estonia's rail serie…6.17m tonnes in 2025, down from 21.34m in 2019
2 sources · all primary
- ● Statistikaamet (Statistics Estonia) · Table TS1420, passenger and freight traffic on railways, read through the PxWeb API at https://andmed.stat.ee/api/v1/en/stat/TS1420: passengers 8,373.1 thousand in 2019 falling to 7,678.7 thousand in 2025; passenger-km 391,688 thousand in 2019 and 342,403.2 thousand in 2025; goods carried 21,340.9 thousand tonnes in 2019 and 6,174.9 thousand tonnes in 2025; freight turnover 2,160,293.2 thousand tonne-km in 2019 and 485,205.6 thousand tonne-km in 2025. The two public-railway sub-series stop after 2022 (published 2026 · checked 2026-09-13)
- ● AS Eesti Raudtee · Aastaraamat 2025 (annual report, audited by AS PricewaterhouseCoopers) — 146 pages: revenue EUR 31.2m, EBITDA EUR 37.2m, investment EUR 142.1m, 704 employees, 2.87 million tonnes of freight carried on the network, 6.59 million passengers on Eesti Raudtee infrastructure and 7.66 million in Estonia, 5.16 million passenger train-km, 1,709 million gross tonne-km of which 892 million freight, and EUR 140.7m of investment planned for 2026 (published 2026 · checked 2026-09-13)
AS Eesti Raudtee published on 1…Koidula crossing suspended 1 July 2026
2 sources · all primary
- ● AS Eesti Raudtee · News, 1 July 2026: Venemaa otsustas ajutiselt peatada raudteeveod läbi Koidula raudteepiiripunkti (published 2026-07-01 · checked 2026-09-13)
- ● AS Eesti Raudtee · Aastaraamat 2025 (annual report, audited by AS PricewaterhouseCoopers) — 146 pages: revenue EUR 31.2m, EBITDA EUR 37.2m, investment EUR 142.1m, 704 employees, 2.87 million tonnes of freight carried on the network, 6.59 million passengers on Eesti Raudtee infrastructure and 7.66 million in Estonia, 5.16 million passenger train-km, 1,709 million gross tonne-km of which 892 million freight, and EUR 140.7m of investment planned for 2026 (published 2026 · checked 2026-09-13)
Statistics Estonia puts 2025 at…7.68m passengers in 2025
5 sources · all primary
- ● Statistikaamet (Statistics Estonia) · Table TS1420, passenger and freight traffic on railways, read through the PxWeb API at https://andmed.stat.ee/api/v1/en/stat/TS1420: passengers 8,373.1 thousand in 2019 falling to 7,678.7 thousand in 2025; passenger-km 391,688 thousand in 2019 and 342,403.2 thousand in 2025; goods carried 21,340.9 thousand tonnes in 2019 and 6,174.9 thousand tonnes in 2025; freight turnover 2,160,293.2 thousand tonne-km in 2019 and 485,205.6 thousand tonne-km in 2025. The two public-railway sub-series stop after 2022 (published 2026 · checked 2026-09-13)
- ● AS Eesti Liinirongid (Elron) · 2025. a majandusaasta aruanne — 36 pages: 100 per cent state-owned and within the administrative area of the Regionaal- ja Põllumajandusministeerium; sixteen lines, six electric and ten diesel; 748.245 km of lines of which 174.886 km electrified; 20 diesel and 18 electric units; 7.66 million passengers in 2025 against 7.93 million in 2024; 98.16 per cent schedule adherence against a 98.75 per cent target; operating income EUR 73.5 million with state operating support of EUR 41.8 million and ticket revenue of EUR 22.093 million; thirteen new Škoda EMUs arrived by end-2025 (published 2026-05 · checked 2026-09-13)
- ● AS Eesti Raudtee · Aastaraamat 2025 (annual report, audited by AS PricewaterhouseCoopers) — 146 pages: revenue EUR 31.2m, EBITDA EUR 37.2m, investment EUR 142.1m, 704 employees, 2.87 million tonnes of freight carried on the network, 6.59 million passengers on Eesti Raudtee infrastructure and 7.66 million in Estonia, 5.16 million passenger train-km, 1,709 million gross tonne-km of which 892 million freight, and EUR 140.7m of investment planned for 2026 (published 2026 · checked 2026-09-13)
- ● AS Eesti Liinirongid (Elron) · News, 2 August 2026: Järjest enam reisijaid valib Lätti ja Leetu sõitmiseks rongi — 'Alates 6. jaanuarist 2025 toimib Tallinn–Tartu–Riia–Vilniuse ümberistumisega ühendus koostöös Läti reisirongioperaatori Vivi ja Leedu reisirongioperaatoriga LTG Link. Esimesel aastal kasutas ühendust Eestist Lätti või Leetu ning Lätist või Leedust Eestisse sõitmiseks üle 16 000 reisija.' The direct Tallinn–Tartu–Riga train started 12 January 2026 and was used for 8,287 international journeys to the end of June 2026; monthly journeys on the international services grew from about 2,000 in January to nearly 4,400 in June 2026 (published 2026-08-02 · checked 2026-09-14)
- ● AS Eesti Liinirongid (Elron) · News, 12 January 2026: Tallinn – Tartu – Riia rongiliin alustab liinireise — 'Tallinn – Tartu – Riia rongiliin käivitub 12. jaanuaril. 12. jaanuarist väljub Tallinn–Tartu–Riia rong Tallinnast kell 14.50, Tartust kell 17.05 ja jõuab Riiga kell 20.46. Riiast väljub rong kell 7.38 … Esimene väljumine suunal Riia–Tartu–Tallinn toimub 13. jaanuaril kell 7.38.' The line is worked by a two-car Stadler FLIRT diesel unit; the same release records the existing one-change Tallinn–Tartu–Valga–Riia–Vilnius connection running since January 2025 (published 2026-01-12 · checked 2026-09-14)
TTJAEUR 0.53 per train-km on the main network
4 sources · all primary
- ● Tarbijakaitse ja Tehnilise Järelevalve Amet · News, 14 August 2026: TTJA jätkab raudtee kaubavedude soodustamist uute kasutustasudega — infrastructure charges determined on 13 August 2026 for the 13.12.2026–12.12.2027 timetable period (published 2026-08-14 · checked 2026-09-13)
- ● AS Eesti Raudtee · News, 17 August 2026: Jätkatakse raudtee kaubavedude soodustamist uute kasutustasudega (published 2026-08-17 · checked 2026-09-13)
- ● Riigi Teataja (State Gazette of Estonia) · Raudteeseadus (Railway Act), consolidated text RT I, 19.02.2026, 2, in force from 1 March 2026, read through the gazette's own back-end at https://www.riigiteataja.ee/public-api/api/v1/akt/119022026002/blob-html because the public page is a JavaScript application. Section 73(1)–(2): the Ministry of Climate draws up the action plan guiding the development of the public railway infrastructure and the Government approves it for at least five years. Section 106: TTJA determines the infrastructure charge and mark-ups and collects the charges. Section 108(1)–(2): Konkurentsiamet monitors the competitive situation on the rail services market and 'on ka reguleeriv asutus Euroopa Parlamendi ja nõukogu direktiivi 2012/34/EL tähenduses'. Section 143(1) lists six supervisory bodies; 143(3) gives Konkurentsiamet accounting separation, the licences in section 12(1) points 1–3 and complaints under section 109; 143(4)–(5) gives TTJA the upkeep of structures and rolling stock, safety management system supervision, the licences in section 12(1) points 4–5, the driver chapter, the interoperability chapter and supervision of single safety certificates and of the trackside control-command and signalling, energy and infrastructure subsystems under Article 17 of Directive (EU) 2016/798; 143(6) limits Transpordiamet to checking compliance with the requirements set for railway undertakings having regard to section 7, which applies Regulation (EU) 2021/782 on rail passenger rights (published 2026-03-01 · checked 2026-09-13)
- ● AS Eesti Raudtee · Aastaraamat 2025 (annual report, audited by AS PricewaterhouseCoopers) — 146 pages: revenue EUR 31.2m, EBITDA EUR 37.2m, investment EUR 142.1m, 704 employees, 2.87 million tonnes of freight carried on the network, 6.59 million passengers on Eesti Raudtee infrastructure and 7.66 million in Estonia, 5.16 million passenger train-km, 1,709 million gross tonne-km of which 892 million freight, and EUR 140.7m of investment planned for 2026 (published 2026 · checked 2026-09-13)
Two Estonian rail procedures in…2 procedures and one lot
5 sources · all primary
- ● Tenders Electronic Daily (TED) · Contract award notice 442988-2026, 29 June 2026 (dispatched 26 June 2026) — Ülemiste depoohoone ja taristu 2. etapi ehitustööd, buyer reference 290296: TenderResultCode clos-nw with non-award justification all-rej (published 2026 · checked 2026-09-13)
- ● Tenders Electronic Daily (TED) · Contract award notice 449255-2023, 24 July 2023 — Kangru liiklussõlme ja Rail Balticut ületavate viaduktide ehitustööd, buyer reference 264499: TenderResultCode clos-nw with non-award justification chan-need (published 2023 · checked 2026-09-13)
- ● Tenders Electronic Daily (TED) · Contract award notice 762411-2023, 15 December 2023 — Elektrifitseerimise projekti uute veoalajaamade elektrilised liitumised III, buyer reference 273485, EUR 15,067,403.18 to Elektrilevi OÜ across LOT-0001 at EUR 8,490,211.18 and LOT-0002 at EUR 6,577,192.00, with LOT-0003 carrying clos-nw and the non-award justification chan-need (published 2023 · checked 2026-09-13)
- ● EU Vocabularies (Publications Office) · Non-award justification authority table — ins-fund 'Decision of the buyer, because of insufficient funds', all-rej 'All tenders, requests to participate or projects were withdrawn or found inadmissible', other (published 2026 · checked 2026-09-13)
- ● AS Eesti Liinirongid (Elron) · News, 9 September 2026: Rail Baltica rongihankele nõuetekohaseid pakkumisi ei laekunud — 'Balti riikide reisirongioperaatorite Elroni, Vivi ja LTG Linki Rail Baltica regionaalrongide ühishankele tähtajaks nõuetekohaseid pakkumisi ei laekunud. Pärast dokumentide ja tagasiside läbitöötamist kuulutatakse välja uus hange.' Six train manufacturers registered; two raised questions on technical requirements and contract terms up to the last days; up to 20 regional trains suitable for 1435 mm gauge with a maximum speed of 200 km/h, Estonia buying five with the possibility of increasing the order to seven, Latvia up to five and Lithuania up to eight; the procurement was advertised on 18 March and tenders could be submitted until 8 September at 12.00 (published 2026-09-09 · checked 2026-09-13)
Elron's published fleet is 20 d…38 Stadler units plus 16 Škoda on order
4 sources · all primary
- ● AS Eesti Liinirongid (Elron) · 2025. a majandusaasta aruanne — 36 pages: 100 per cent state-owned and within the administrative area of the Regionaal- ja Põllumajandusministeerium; sixteen lines, six electric and ten diesel; 748.245 km of lines of which 174.886 km electrified; 20 diesel and 18 electric units; 7.66 million passengers in 2025 against 7.93 million in 2024; 98.16 per cent schedule adherence against a 98.75 per cent target; operating income EUR 73.5 million with state operating support of EUR 41.8 million and ticket revenue of EUR 22.093 million; thirteen new Škoda EMUs arrived by end-2025 (published 2026-05 · checked 2026-09-13)
- ● AS Eesti Liinirongid (Elron) · Elroni rongid — published fleet list: 20 diesel units and 18 electric units, all Stadler units entering service between July 2013 and May 2014, and 98 per cent on-time arrival (published 2026 · checked 2026-09-13)
- ● Aktsiaselts Tallinna Linnatransport · Trammiveerem — published tram fleet: 23 PESA Twist 147N delivered on TLT's order from August 2024, 28.6 m long and carrying up to 309 passengers of whom 65 seated; CAF Urbos AXL in service since 2015, 31,000 mm long, 79 seats and 140 standing, top speed 70 km/h, 600 V supply; Tatra KT4 built by ČKD Tatra 1979–1990, 75 new units taken into service in Tallinn 1981–1990 with further used units bought from Germany between 1996 and 2018. Ordering desk +372 643 4122 and tellimine@tlt.ee (published 2026 · checked 2026-09-13)
- ● Republic of Estonia — Riigihangete register · Open-data interface, contract award notices by month: GET https://riigihanked.riik.ee/rhr/api/public/v1/opendata/notice_award/<YYYY>/month/<M>/xml — the route through which this file read the winners of pre-eForms Estonian award notices (published 2026 · checked 2026-09-13)
The Ministry of Climate publish…state freight operator sold 10 December 2024
2 sources · all primary
- ● Kliimaministeerium (Ministry of Climate) · Liikuvus — Raudtee — AS Raudtee Varad: the ministry's own account of the privatisation of the state freight operator. Until December 2024 the group carried freight on Estonian railways and maintained and repaired rolling stock under the name AS Operail; it left wagon leasing and Finnish freight by the owner's decision by the start of 2023; in February 2024 the government decided to privatise the remaining business lines; the two-stage auction opened on 7 June 2024, the best binding bid was made by the Estonian company AS Tiigi Keskus, the sale and purchase agreement was signed on 31 October 2024 and the business together with the subsidiary Operail Repairs OÜ passed to the new owner on 10 December 2024. The legal entity left with the state, AS Raudtee Varad (registry code 11575850) and its subsidiary RV Leasing Finland Oy, does no active business, has no employees, and holds Russian-owned open wagons that are frozen assets which sanctions forbid returning to Russia or buying out (published 2026 · checked 2026-09-13)
- ● Operail OÜ · About the company — 'An Estonian capital based railway company with international reach – we transport goods, maintain and repair rolling stock, and build locomotives'; 38 locomotives of the C30-M, C36-7i and TEM TMH types; the government decided in February 2024 to divest all business segments and the sale to AS Tiigi Keskus completed on 31 October, with Operail continuing on the railway as a private company from December 2024 (published 2026 · checked 2026-09-13)
Rail Baltica is bought on two l…line-wide contracts are let from Riga
7 sources · all primary
- ● Tenders Electronic Daily (TED) · Contract notice 391326-2022, 19 July 2022 — Konsolidētās dzelzceļa balasta piegādes Rail Baltica dzelzceļa līnijas būvniecībai, buyer RB Rail AS (Riga), reference RBR 2022/14, CPV 14212310, divided into six delivery-region lots named in section II.2.1: lot 1 Tallinn and lot 2 Pērnava (Pärnu) in Estonia, lot 3 Iecava and lot 4 Skulte in Latvia, lot 5 Paneveža (Panevėžys) and lot 6 Kauņa (Kaunas) in Lithuania, each for 84 months. The notice predates eForms and the TED Search API returns no title-lot or description-lot for it; the lot list was read from the rendered notice in a browser session on 14 September 2026 (published 2022 · checked 2026-09-14)
- ● Tenders Electronic Daily (TED) · Contract award notice 180916-2026, 16 March 2026 — RB Rail AS consolidated ballast framework RBR2022/14, EUR 53,625,000 on the lot TED identifies as LOT-0000, to Baltic Stone Terminal OU, Bremanger Querry AS and Graniet Import Benelux BV (published 2026 · checked 2026-09-13)
- ● Tenders Electronic Daily (TED) · Contract award notice 178263-2026, 16 March 2026 — RB Rail AS consolidated ballast framework RBR2022/14: LOT-0005 closed without a winner, clos-nw, non-award justification chan-need (published 2026 · checked 2026-09-13)
- ● Tenders Electronic Daily (TED) · Contract award notice 178659-2026, 16 March 2026 — RB Rail AS consolidated ballast framework RBR2022/14: LOT-0002, LOT-0004 and LOT-0006 each closed without a winner, clos-nw, non-award justification other (published 2026 · checked 2026-09-13)
- ● OÜ Rail Baltic Estonia · Hanked — the buyer's own statement of the division of procurement between RB Rail AS and the three national implementing bodies (published 2026 · checked 2026-09-13)
- ● EU Vocabularies (Publications Office) · Non-award justification authority table — ins-fund 'Decision of the buyer, because of insufficient funds', all-rej 'All tenders, requests to participate or projects were withdrawn or found inadmissible', other (published 2026 · checked 2026-09-13)
- ● Iepirkumu uzraudzības birojs (Latvian Procurement Monitoring Bureau) · Public procurement search endpoint, GET https://infob.iub.gov.lv/api/search?searchPhrase=true&withInflections=true&query=RBR2022%2F14 — queried for the RB Rail reference RBR2022/14 and answering HTTP 200 with response header x-total-count 0, x-count 0 and an empty JSON array, i.e. the Latvian register publishes no record under that reference (published 2026 · checked 2026-09-14)
The National Audit Office of Es…cost estimate quadrupled to 2023
2 sources · all primary
- ● Riigikontroll (National Audit Office of Estonia) · Eesti, Läti ja Leedu riigikontrolli ühine ülevaade Rail Balticu projekti kohta, 11 June 2024 (published 2024-06-11 · checked 2026-09-13)
- ● Riigikontroll (National Audit Office of Estonia) · Press release, 12 June 2024 — the page's own <time> stamp reads 2024-06-12 and the release's dateline reads 'TALLINN – RIIA – VILNIUS, 12. juuni 2024'. The joint report itself and the auditees' reply letters are dated 11 June 2024, and the Auditor General's separate comment on the report is also dated 12 June 2024: Baltimaade riigikontrollide ühisaruanne — Rail Balticu projekti ähvardab hinnanguliselt 10–19 miljardi eurone eelarvepuudujääk (published 2024-06-12 · checked 2026-09-14)
Buyers
| Buyer | Type | Tenders | Contracts awarded |
|---|---|---|---|
| OÜ Rail Baltic Estonia | High-speed rail SPV | 30 | 42 |
| Aktsiaselts Eesti Raudtee | Infrastructure manager | 14 | 14 |
| Aktsiaselts Tallinna Linnatransport | Transit authority | 2 | 2 |
| Edelaraudtee aktsiaselts | Infrastructure manager | 1 | 1 |
| Kliimaministeerium | National rail HQ | 1 | 1 |
| AS Eesti Liinirongid | National operator | 1 | 0 |
| Konkurentsiamet | Regulator / standards | 0 | 0 |
| Operail OÜ | National operator | 0 | 0 |
| Tarbijakaitse ja Tehnilise Järelevalve Amet | Regulator / standards | 0 | 0 |
| Transpordiamet | Regulator / standards | 0 | 0 |
Tenders
Cities
| City | Network status | Networks |
|---|---|---|
| Tallinn | operational — seat of AS Eesti Raudtee, OÜ Rail Baltic Estonia, AS Eesti Liinirongid (Elron), Operail OÜ and Aktsiaselts Tallinna Linnatransport, and of the rail safety authority TTJA and the rail regulatory body Konkurentsiamet; the 1520/1524 mm node where the Tallinn–Keila–Paldiski, Tallinn–Tapa and Tallinn-Väike–Lelle lines meet, and the city whose tram network is the only urban rail system in this file. No metro. Rail Baltica's Estonian terminus is the Ülemiste joint terminal, named Linda, under construction to a Zaha Hadid Architects and Esplan design with completion expected in 2028 | Tallinn tram network (Aktsiaselts Tallinna Linnatransport); Ülemiste rail node (AS Eesti Raudtee); Rail Baltica Ülemiste joint terminal 'Linda' (OÜ Rail Baltic Estonia) |
| Pärnu | operational on the 1520/1524 mm Lelle–Pärnu line managed by Edelaraudtee aktsiaselts, and the site of Estonia's second Rail Baltica international passenger terminal, planned at Papiniidu; the implementing body states that the terminal construction tender was to be advertised in summer 2026 with completion planned for 2030, and no such notice had been published on TED by the run date | |
| Tartu | operational — the southern end of the Tapa–Tartu line and the junction for Tartu–Valga and Tartu–Koidula; the terminus of the first stage of the Eesti Raudtee electrification programme, whose catenary works on the Aegviidu–Tapa–Tartu direction the manager states will finish in autumn 2026 | |
| Narva | operational — the eastern border station on the Tapa–Narva line, with 1,500 m usable station tracks and Siemens Simis IS interlocking; Eesti Raudtee's Tapa–Narva catenary and traction substation contract and its CCS renewal both run to this section, and the manager records border-station capacity utilisation at Narva of 7.5 per cent in 2025 | |
| Tapa | operational — the junction where the Tallinn–Narva and Tapa–Tartu lines divide and the pivot of both national programmes: the first 25 kV AC traction substation in Estonia was energised here together with the Aegviidu–Tapa contact line, and the Tapa station interlocking was the first section of the CCS renewal completed | |
| Rapla | operational on the Edelaraudtee Tallinn-Väike–Lelle–Viljandi line, whose Rapla–Lelle section Edelaraudtee rebuilt under a EUR 24.1m design-and-build contract whose published scope is a complex rebuild of the infrastructure to raise train speed to 160 km/h, and the county through which the largest single block of Rail Baltica main-line works runs — five construction contracts across the Raplamaa stages I to V, plus a planned Rail Baltica local stop | |
| Viljandi | operational — the southern terminus of the Edelaraudtee Tallinn-Väike–Lelle–Türi–Viljandi line, not electrified and not on the Rail Baltica route | |
| Valga | operational — the southern border station to Latvia on the Tartu–Valga line, with 850 m usable station tracks; the interchange for the Tartu–Riga international service that the Ministry of Climate awarded to Elron in December 2025, and the Estonian station with the highest published border capacity utilisation, 21.1 per cent in 2025 |
Players with a footprint here
| Player | Kind | Footprint |
|---|---|---|
| GRK | Civil contractor | Project presence |
| Järelpinge | Engineering consultant | Project presence |
| Verston | Civil contractor | Project presence |
| GoTrack | Track & electrification contractor | Project presence |
| Merko | Civil contractor | Project presence |
| TREF Nord | Civil contractor | Project presence |
| TREV-2 | Civil contractor | Project presence |
| Tariston | Civil contractor | Project presence |
| ATEMO | Civil contractor | Project presence |
| Ingerop | Engineering consultant | Project presence |
| KMG Infra | Civil contractor | Project presence |
| Bouygues TP | Civil contractor | Project presence |
| Elektrilevi | Other | Project presence |
What changed
From This Week in Rail, newest first.
- 2026-09-28 — Rail Baltic Estonia tenders supervision and consultancy for the track-bed substructure at Ülemiste and stage I of the Kantsi tunnel.
- 2026-09-28 — Elron tests its Škoda trains at night between Tapa and Tamsalu for the first time.
Withheld in the free surface
- Capex in this region (3)
- Market narrative
Full detail withheld: 2 fields. In the European Union edition · See a fully open example
- Programme profile
- Rail baltica boundary note
- Signalling note
- Buyer practice note
- Portal note
- Market monitoring note
- Methodology note
Full detail withheld: 7 fields. In the European Union edition · See a fully open example