Tender · In execution
? How to use this page

How to use a tender page

  1. What is being bought, for how much, and what happens next.
  2. Next step tells you the procedure and where the notice is; Watch to follow deadlines and the award.
  3. Full scope, exact values, dates and bidders open with this market's edition, with a calendar export.

Rail Baltic Estonia main line Ülemiste border

Rail Baltic Estonia — the Rail Baltica main line from Ülemiste to the Latvian border in two alliance contracts, with a value recorded on TED: Alliance 1 led by GRK and Alliance 2 by Bouygues Travaux Publics

Awarded to Bouygues TP — OÜ Rail Baltic Estonia now holds 1 position with this supplier.

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the European Union edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Buyer
OÜ Rail Baltic Estonia
Where
Estonia · Pärnu
Segments
Track, Civil works, Consultancy
Technology areas
Track & civil, Electrification
Status
In execution — Contract award notice 329183-2025 of May 2025, buyer reference 284278, two lots, both contracts concluded in May 2025.
Value band
over $1bn
Currency
EUR
Key dates (month)
Published October 2024 · Awarded May 2025

Status in full

Read more

Contract award notice 329183-2025 of May 2025, buyer reference 284278, two lots, both contracts concluded in May 2025. Lot 1 is titled 'Allianss 1 Ülemiste-Pärnu lõik' and lot 2 'Allianss 2 Pärnu–Ikla', with values recorded on BT-720-Tender, and a combined value recorded on total-value, result-value-notice and BT-161-NoticeResult. The buyer's own release of the same day puts the works at a published figure for Alliance 1 and for Alliance 2, with a combined figure published, and states that with the additional option to buy strategic materials — rails, sleepers, turnouts and ballast — the total cost may reach a further published figure. The two sets of figures are therefore the same contracts on two different scopes, not a divergence, and both are stated. Lot-to-holder attribution is readable: winner-name lists twelve organisations and tendering-party-leader flags the first and the eighth, splitting the list into a block of seven and a block of five that match the buyer's own published membership lists exactly. Alliance 1 holds GRK Eesti AS, Aktsiaselts Merko Ehitus Eesti, GRK Suomi Oy, NGE CONTRACTING, Sweco Finland Oy, Sweco Sverige AB and TSO SAS; Alliance 2 holds Bouygues Travaux Publics, Budimex S.A., INGEROP CONSEIL ET INGENIERIE (ICI), KMG Infra OÜ and WSP Finland OY. Five tenders were received on each of the two lots, read from BT-759-LotResult against the `tenders` code of BT-760-LotResult.

Next step

Awarded May 2025 — in execution.

Read the notice: Tenders Electronic Daily (TED) ↗

Recorded award: Bouygues TP — Rail Baltic Estonia main line Ülemiste border — Bouygues Travaux Publics

Withheld in the free surface

  • Full scope
  • Exact value
  • How the figure was arrived at
  • Key dates (2)
  • Published bidders
  • Note on the figure

Full detail withheld: 6 fields. In the European Union edition · See a fully open example

5 sources · all primary
  • ● Tenders Electronic Daily (TED) · Contract award notice 329183-2025, 22 May 2025 — Rail Baltica Ülemiste-Pärnu, Pärnu–Läti piir põhitrassi projekteerimine ja ehitus (Allianss): LOT-0001 'Allianss 1 Ülemiste-Pärnu lõik' EUR 540,000,000 and LOT-0002 'Allianss 2 Pärnu–Ikla' EUR 392,000,000, both concluded 16 May 2025, twelve winners with the tendering-party-leader flag on GRK Eesti AS and Bouygues Travaux Publics (published 2025 · checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · Contract notice 590536-2024, 1 October 2024 — Rail Baltica Ülemiste-Pärnu, Pärnu–Läti piir põhitrassi projekteerimine ja ehitus (Allianss), buyer reference 284278, two lots estimated at EUR 540,000,000 and EUR 392,000,000 (published 2024 · checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · Prior information notice 268147-2024, 6 May 2024 — Rail Baltica Tootsi-Pärnu, Pärnu–Läti piir põhitrassi ning Ülemiste–Pärnu põhitrassi pealisehituse projekteerimine ja ehitamine, buyer reference 279428, estimated EUR 900,000,000, announcing a market consultation (published 2024 · checked 2026-09-13)
  • ● OÜ Rail Baltic Estonia · News, 16 May 2025: Rail Baltic Estonia sõlmis Rail Baltica põhitrassi ehituseks rekordilised lepingud rahvusvaheliste konsortsiumitega — names the members of Allianss 1 and Allianss 2 separately and gives EUR 394m and EUR 332m works values against a EUR 932m ceiling with the strategic-materials option (published 2025-05-16 · checked 2026-09-13)
  • ● OÜ Rail Baltic Estonia · Korduma kippuvad küsimused — programme parameters: 870 km in the three states of which 213 km in Estonia, 1435 mm, 249 km/h passenger and 120 km/h freight design speed, two international terminals and twelve local stops, EUR 15.3bn by end-2030 with up to 85 per cent EU funding, and about EUR 3.1bn invested through Rail Baltic Estonia (published 2026 · checked 2026-09-13)

Related tenders

Same buyer first, then the same segment in this market.

TenderBuyerStatusValue bandNext key date
Rail Baltic Estonia Raplamaa IV Alu KärplaRail Baltic EstoniaIn execution$100–500mAwarded September 2024
Rail Baltic Estonia Ülemiste depot stage 2Rail Baltic EstoniaCancelled$25–100mDate March 2026
Rail Baltic Kangru junction viaducts first procedureRail Baltic EstoniaCancelledvalue not published on the noticeDate June 2023
Show all 6 related tenders
TenderBuyerStatusValue bandNext key date
Rail Baltic Estonia Harjumaa II Soodevahe KangruRail Baltic EstoniaIn execution$25–100mAwarded September 2024
Rail Baltic Estonia Harjumaa III Kangru SakuRail Baltic EstoniaIn execution$25–100mAwarded November 2024
Rail Baltic Estonia Raplamaa V Kärpla SeljaRail Baltic EstoniaIn execution$25–100mAwarded March 2025

Browse: the Atlas · European Union · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.