Rapla–Lelle complex rebuild 160 km/h

Edelaraudtee — complex rebuild of the Rapla–Lelle section for 160 km/h: awarded to Osaühing GoTrack, the only Edelaraudtee contract above the floor

Awarded to GoTrack — Edelaraudtee aktsiaselts now holds 1 position with this supplier.

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the European Union edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Buyer
Edelaraudtee aktsiaselts
Where
Estonia · Rapla
Segments
Track, Signalling, Electrification
Technology areas
Track & civil, Signalling & train control
Status
In execution — Contract award notice 564998-2023 of 19 September 2023, buyer reference 263478, contract concluded 15 September 2023.
Value band
$25–100m
Currency
EUR
Key dates (month)
Awarded September 2023

Status in full

Read more

Contract award notice 564998-2023 of 19 September 2023, buyer reference 263478, contract concluded 15 September 2023. Osaühing GoTrack is the only economic operator named, on both winner-name and organisation-name-tenderer; no subcontractor is named. This is the only Edelaraudtee procurement above the EUR 5 million Atlas floor anywhere in the sweep of TED from 1 January 2022.

Next step

Awarded September 2023 — in execution.

Read the notice: Tenders Electronic Daily (TED) ↗

Recorded award: GoTrack — Rapla–Lelle complex rebuild 160 km/h — Osaühing GoTrack

Withheld in the free surface

  • Full scope
  • Exact value
  • How the figure was arrived at
  • Key dates (1)
  • Published bidders

Full detail withheld: 5 fields. In the European Union edition · See a fully open example

2 sources · all primary
  • ● Tenders Electronic Daily (TED) · Contract award notice 564998-2023, 19 September 2023 — Rapla-Lelle raudteelõigu ümberehitus 2, buyer Edelaraudtee aktsiaselts, buyer reference 263478, EUR 24,059,699.44 to Osaühing GoTrack, contract concluded 15 September 2023 (published 2023 · checked 2026-09-13)
  • ● Edelaraudtee aktsiaselts · Raudteevõrgustiku teadaanne liiklusgraafikuperioodiks 13.12.2026 – 11.12.2027, approved by order EDI-2026-KK-7 of 30 January 2026 — 34 pages; the manager of the public network on the Tallinn-Väike–Lelle–Türi–Viljandi, Lelle–Pärnu and Liiva–Ülemiste lines, about 222 km, 1520/1524 mm, no electrification and no ETCS anywhere in the document (published 2026-01-30 · checked 2026-09-13)

Related tenders

Same buyer first, then the same segment in this market.

TenderBuyerStatusValue bandNext key date
DB InfraGO permanent-way repair framework, four waves · 3 partsDB InfraGOOpenover $1bn each part (USD)Closes November 2026
DB InfraGO permanent-way repair frameworks wave 1DB InfraGOOpen€1.41bn framework maximum
DB InfraGO permanent-way repair frameworks wave 2DB InfraGOOpenover $1bnCloses November 2026
DB InfraGO permanent-way repair frameworks wave 3DB InfraGOOpenover $1bnCloses November 2026
Show all 6 related tenders
TenderBuyerStatusValue bandNext key date
DB InfraGO permanent-way repair frameworks wave 4DB InfraGOOpenover $1bnCloses December 2026
LTG Infra Rail Baltica Kaunas–Panevėžys formation structuresLTG InfraOpenover $1bnCloses October 2027
Ligne Nouvelle Montpellier–Perpignan construction Phase 1SNCF RéseauOpenover $1bnCloses October 2026

Browse: the Atlas · European Union · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.