European Union · Country
? How to use this page
How to use a region page
- Counts and the pipeline for this region come first; the tabs list its buyers, players and tenders.
- Cities on the map open their own pages.
- Capex, pipeline value and the market narrative open with this market's edition.
Lithuania
10 buyers · 59 tenders · checked 2026-10-03
LTG holds most contracts; Rail Baltica 114 km Kaunas-Panevėžys EUR 733.8m works awarded, rails welded CWR September 2026; EUR 112.4m signalling; no Class A system.
Everything here is free. One market edition opens in full with one email. Open your free edition
0Metro systems operating
10Buyers tracked
59Tenders tracked
- Live pipeline
- EUR 1.33bn of valued rail records tracked since January 2024 — EUR 1,333,642,020.48 across 26 records, of which EUR 1,326,662,127.48 is contract awards and EUR 6,979,893 a single contract modification — with EUR 733.8m of it Rail Baltica mainline works in six sections and EUR 232.2m a single group-internal electric locomotive purchase. Alongside that sit 26 standing dynamic purchasing systems open for supplier admission today, whose published ceilings total between EUR 2.21bn and EUR 2.95bn depending on two records that publish two figures each; those ceilings are spending headroom to 2027–2035, not committed money, and they overlap the award total by the EUR 621.5m already called off inside the Rail Baltica works system. Seven competitions — the Panevėžys–LT/LV border design package, the Stasylos signalling design-and-build, the Rail Baltica regional train order, the Berčiūnai–Joniškėlis design expertise, the Kaunas–Šveicarija works of November 2024 and RB Rail's two Lithuanian design packages — carry no published value at all
- Technology areas
- Track & civil, Signalling & train control, Electrification, Rolling-stock hardware, Digital operations, Predictive maintenance, Cybersecurity, AI inspection
Key figures
Lithuanian railway managed by L…1,924.3 km · 559.5 km electrified
1 source · primary
- ● AB LTG Infra · Network Statement 2026–2027 and annexes (215 pp., English) — network extent, gauges, electrification, signalling systems, axle loads, infrastructure development, regulatory and contact directory (published 2026 · checked 2026-09-13)
Lithuania runs two gauges: 11,520 mm and 1,435 mm
1 source · primary
- ● AB LTG Infra · Network Statement 2026–2027 and annexes (215 pp., English) — network extent, gauges, electrification, signalling systems, axle loads, infrastructure development, regulatory and contact directory (published 2026 · checked 2026-09-13)
LTG Infra's Network Statement 2…no Class A system installed
1 source · primary
- ● AB LTG Infra · Network Statement 2026–2027 and annexes (215 pp., English) — network extent, gauges, electrification, signalling systems, axle loads, infrastructure development, regulatory and contact directory (published 2026 · checked 2026-09-13)
Lithuania is building a 114 km…114 km under construction
3 sources · all primary
- ● UAB Rail Baltica statyba · Home — 'Lithuania is building a high-speed railway line: a 114 km section between Kaunas and Panevėžys and 10 km of European-standard track' (published 2026 · checked 2026-09-13)
- ● RB Rail AS · Progress today — Lithuania 114 km of mainline under construction with first tracks being laid; electrification design-and-build contract awarded; signalling and control-command procurement under way; framework agreements signed for sleepers, rails, ballast and turnouts; the Baltic national carriers Elron, Vivi and LTG Link have launched a joint procurement for up to 20 Rail Baltica regional trains built to 1,435 mm gauge and capable of 200 km/h (published 2026 · checked 2026-09-13)
- ● UAB Rail Baltica statyba / AB LTG Infra · News, 9 September 2026 — rail welding into continuous welded rail completed on the almost 9 km Šveicarija–Žeimiai double-track European-gauge section; turnout system installation is the next stage; superstructure works are performed by the joint-activity partners Leonhard Weiss International (Germany) and Leonhard Weiss OÜ (Estonia); turnout systems for the section are being manufactured by voestalpine Railway Systems Lietuva; Lithuania has secured funding for 114 km of mainline and is seeking further funding in the next EU financing period (published 2026-09-09 · checked 2026-09-13)
Rail Baltica mainline works awa…EUR 733.8m in six sections
6 sources · all primary
- ● Tenders Electronic Daily (TED) · Contract award notice 771094-2025, 20 November 2025 — 26517 Rail Baltica Kaunas–Panevėžys–LT/LV border, new formation Ramygala–Berčiūnai 78–102.43 km (24.43 km), works (DPS 28275) (published 2025 · checked 2026-09-13)
- ● Tenders Electronic Daily (TED) · Contract award notice 555836-2025, 26 August 2025 — 29036 Rail Baltica Kaunas–Šveicarija 9.0–19.4 km (10.4 km), new formation, structures and roads (published 2025 · checked 2026-09-13)
- ● Tenders Electronic Daily (TED) · Contract award notice 705584-2024, 19 November 2024 — No. 22005 Rail Baltica Kaunas–Panevėžys–LT/LV: new double-track formation, engineering structures and local roads, Šėta–Ramygala (published 2024 · checked 2026-09-13)
- ● Tenders Electronic Daily (TED) · Contract award notice 680784-2025, 16 October 2025 — 26518 Rail Baltica Kaunas–Panevėžys–LT/LV border, new formation Berčiūnai–Joniškėlis 102.43–114.71 km (12.28 km) (published 2025 · checked 2026-09-13)
- ● Tenders Electronic Daily (TED) · Contract award notice 555214-2025, 26 August 2025 — 29108 Rail Baltica Kaunas–Šveicarija 0.5–9.0 km (8.5 km), new formation, structures and roads (published 2025 · checked 2026-09-13)
- ● Tenders Electronic Daily (TED) · Contract award notice 555080-2025, 26 August 2025 — 26524 Rail Baltica Kaunas–Panevėžys–LT/LV border, new formation Šėta–Ramygala 65.9–78 km (12.1 km) (published 2025 · checked 2026-09-13)
LTG Infra's electrification of…8% to 26.8% electrified
2 sources · all primary
- ● AB LTG Infra · Network Statement 2026–2027 and annexes (215 pp., English) — network extent, gauges, electrification, signalling systems, axle loads, infrastructure development, regulatory and contact directory (published 2026 · checked 2026-09-13)
- ● AB Lietuvos geležinkeliai (LTG) · Railway electrification — Vilnius–Klaipėda corridor electrification, stated benefits and passenger targets (published 2026 · checked 2026-09-13)
Seven Lithuanian rail procedure…7 procedures and one lot
9 sources · all primary
- ● Tenders Electronic Daily (TED) · Contract award notice 114818-2025, 20 February 2025 — RB Rail AS RBR 2022/18, design and construction-supervision services for the new line from the Vilnius urban node to the Kaunas urban node; closed without a winner, non-award justification ins-fund (published 2025 · checked 2026-09-13)
- ● Tenders Electronic Daily (TED) · Contract award notice 519423-2025, 7 August 2025 — RB Rail AS RBR2022/25, design and construction-supervision services for the new line through the Kaunas urban node; closed without a winner, non-award justification ins-fund (published 2025 · checked 2026-09-13)
- ● Tenders Electronic Daily (TED) · Contract award notice 703595-2024, 19 November 2024 — No. 22006 Rail Baltica Kaunas–Šveicarija: procedure closed without a winner, non-award justification all-rej (published 2024 · checked 2026-09-13)
- ● Tenders Electronic Daily (TED) · Contract award notice 335785-2025, 23 May 2025 — NUTRAUKTAS 27771 Rail Baltica railway infrastructure maintenance depot in Kaunas, design and design-supervision services; closed without a winner, non-award justification chan-need (no longer needed); no value published (published 2025 · checked 2026-09-13)
- ● Tenders Electronic Daily (TED) · Contract award notice 335523-2025, 23 May 2025 — NUTRAUKTAS 27770 Rail Baltica railway infrastructure maintenance depot in Panevėžys, design and design-supervision services; closed without a winner, non-award justification chan-need (no longer needed); no value published (published 2025 · checked 2026-09-13)
- ● Tenders Electronic Daily (TED) · Contract award notice 623972-2026, 10 September 2026 — NUTRAUKTAS 32966 electrification of the Juodšiliai–Rūdninkai training-ground railway line; TenderResultCode clos-nw, non-award justification 'other' (published 2026 · checked 2026-09-13)
- ● Tenders Electronic Daily (TED) · Contract award notice 624954-2026, 10 September 2026 — second termination notice for 32966, same title, clos-nw, non-award justification 'other' (published 2026 · checked 2026-09-13)
- ● Tenders Electronic Daily (TED) · Contract award notice 179597-2026, 16 March 2026 — RB Rail AS RBR2021/15, consolidated supply of rails for the Rail Baltica line (published 2026 · checked 2026-09-13)
- ● EU Vocabularies (Publications Office) · Non-award justification authority table — ins-fund 'Decision of the buyer, because of insufficient funds', all-rej 'All tenders, requests to participate or projects were withdrawn or found inadmissible', other (published 2026 · checked 2026-09-13)
RRT's annual rail services mark…12.91bn gross tonne-km in 2025
2 sources · all primary
- ● Lietuvos Respublikos ryšių reguliavimo tarnyba (RRT) · Lietuvos geležinkelių transporto paslaugų rinka 2025 m. — the regulator's annual rail services market report, 21 pages, published 4 June 2026: network length, market participants, actual work volume, train traffic, passenger and freight market pages, carrier charges, carrier and infrastructure-manager revenues, service-facility operator revenues and train punctuality (published 2026 · checked 2026-09-13)
- ● Lietuvos Respublikos ryšių reguliavimo tarnyba (RRT) · Lietuvos geležinkelių transporto paslaugų rinka 2025 m. — Ataskaitos lentelės, the report's own data tables; table 12 publishes the annual freight market shares by actual work volume and table 11 the annual freight volumes (published 2026 · checked 2026-09-13)
Seven railway undertakings carr…LTG Cargo 96.05% of freight work in 2025
2 sources · all primary
- ● Lietuvos Respublikos ryšių reguliavimo tarnyba (RRT) · Lietuvos geležinkelių transporto paslaugų rinka 2025 m. — the regulator's annual rail services market report, 21 pages, published 4 June 2026: network length, market participants, actual work volume, train traffic, passenger and freight market pages, carrier charges, carrier and infrastructure-manager revenues, service-facility operator revenues and train punctuality (published 2026 · checked 2026-09-13)
- ● Lietuvos Respublikos ryšių reguliavimo tarnyba (RRT) · Lietuvos geležinkelių transporto paslaugų rinka 2025 m. — Ataskaitos lentelės, the report's own data tables; table 12 publishes the annual freight market shares by actual work volume and table 11 the annual freight volumes (published 2026 · checked 2026-09-13)
RRT records 2025 punctuality at…77.51% of trains on time in 2025
2 sources · all primary
- ● Lietuvos Respublikos ryšių reguliavimo tarnyba (RRT) · Lietuvos geležinkelių transporto paslaugų rinka 2025 m. — the regulator's annual rail services market report, 21 pages, published 4 June 2026: network length, market participants, actual work volume, train traffic, passenger and freight market pages, carrier charges, carrier and infrastructure-manager revenues, service-facility operator revenues and train punctuality (published 2026 · checked 2026-09-13)
- ● Lietuvos Respublikos ryšių reguliavimo tarnyba (RRT) · Lietuvos geležinkelių transporto paslaugų rinka 2025 m. — Ataskaitos lentelės, the report's own data tables; table 12 publishes the annual freight market shares by actual work volume and table 11 the annual freight volumes (published 2026 · checked 2026-09-13)
Railway undertakings took EUR 3…EUR 371.4m carrier revenue in 2025
2 sources · all primary
- ● Lietuvos Respublikos ryšių reguliavimo tarnyba (RRT) · Lietuvos geležinkelių transporto paslaugų rinka 2025 m. — the regulator's annual rail services market report, 21 pages, published 4 June 2026: network length, market participants, actual work volume, train traffic, passenger and freight market pages, carrier charges, carrier and infrastructure-manager revenues, service-facility operator revenues and train punctuality (published 2026 · checked 2026-09-13)
- ● Lietuvos Respublikos ryšių reguliavimo tarnyba (RRT) · Lietuvos geležinkelių transporto paslaugų rinka 2025 m. — Ataskaitos lentelės, the report's own data tables; table 12 publishes the annual freight market shares by actual work volume and table 11 the annual freight volumes (published 2026 · checked 2026-09-13)
Buyers
| Buyer | Type | Tenders | Contracts awarded |
|---|---|---|---|
| Akcinė bendrovė „LTG Infra“ | Infrastructure manager | 35 | 5 |
| RB Rail AS | High-speed rail SPV | 14 | 16 |
| Akcinė bendrovė „Lietuvos geležinkeliai“ | State SPV | 10 | 5 |
| Akcinė bendrovė „LTG Cargo“ | National operator | 6 | 0 |
| Uždaroji akcinė bendrovė „LTG Link“ | National operator | 4 | 1 |
| Lietuvos Respublikos ryšių reguliavimo tarnyba | Regulator / standards | 0 | 0 |
| Lietuvos Respublikos susisiekimo ministerija | National rail HQ | 0 | 0 |
| Lietuvos transporto saugos administracija | Regulator / standards | 0 | 0 |
| Uždaroji akcinė bendrovė „LTG Kompetencijų centras“ | Other | 0 | 0 |
| Uždaroji akcinė bendrovė „Rail Baltica statyba“ | High-speed rail SPV | 0 | 0 |
Tenders
Cities
| City | Network status | Networks |
|---|---|---|
| Vilnius | operational — seat of AB Lietuvos geležinkeliai, AB LTG Infra, UAB LTG Link, AB LTG Cargo, UAB LTG Kompetencijų centras and UAB Rail Baltica statyba, and of the rail market regulator RRT and the safety authority LTSA; Vilnius is an electrified 1,520 mm node on the State border–Kena–Naujoji Vilnia–Vilnius, Vilnius–Kaunas, Kyviškės–Valčiūnai–Vaidotai–Paneriai and Lentvaris–Trakai lines, with the Vaidotai marshalling yard and the Vilnius intermodal terminal; no metro, and the Rail Baltica Kaunas–Vilnius segment is still in spatial planning | Vilnius rail node (LTG Infra); Vilnius intermodal terminal (LTG Infra / LTG Cargo) |
| Kaunas | operational — the meeting point of the 1,520 mm and 1,435 mm networks and the pivot of Rail Baltica in Lithuania: the European-gauge line runs from the Polish border to Kaunas (Jiesia) and Palemonas, the Kaunas urban node is in design, and the Kaunas–Šveicarija and Kaunas–Panevėžys mainline sections are under construction; Kaunas intermodal terminal and the Palemonas military/civil loading yard sit here, and a Rail Baltica infrastructure maintenance depot is planned | Kaunas rail node (LTG Infra); Kaunas intermodal terminal (LTG Infra / LTG Cargo); Palemonas loading yard (LTG Infra) |
| Panevėžys | under construction — the northern end of the 114 km Rail Baltica mainline section being built between Kaunas and Panevėžys; the Ramygala–Berčiūnai, Berčiūnai–Joniškėlis and Šėta–Ramygala works contracts all run through the Panevėžys district, design and supervision for Panevėžys to the Latvian border is under evaluation, and a Rail Baltica infrastructure maintenance depot is planned | Rail Baltica Kaunas–Panevėžys mainline (LTG Infra) |
| Klaipėda | operational — the seaport end of the Kaišiadorys–Klaipėda (Draugystė) electrified corridor and of the RFC8 North Sea–Baltic freight corridor branch Šiauliai–Klaipėda; LTG Infra runs a fuel terminal at Klaipėda and the Klaipėda region is one of the two track-maintenance contract areas | Klaipėda rail node (LTG Infra) |
| Šiauliai | operational — junction of the Radviliškis–Šiauliai–Klaipėda and Šiauliai–Joniškis–Latvian border lines on the trans-European network; the Šiauliai and Klaipėda regions form one of the two track-maintenance contract areas, and the Šiauliai–Klaipėda line carries SIMIS-IS microprocessor interlockings | Šiauliai rail node (LTG Infra) |
| Radviliškis | operational — the largest junction on the 1,520 mm network, where the Kaišiadorys–Radviliškis, Radviliškis–Šiauliai–Klaipėda, Radviliškis–Rokiškis–Latvian border and Radviliškis–Pagėgiai lines meet; LTG Infra runs a fuel terminal here and platform reconstruction design for the station was bought in 2026 | Radviliškis junction (LTG Infra) |
Players with a footprint here
| Player | Kind | Footprint |
|---|---|---|
| Fima | Signalling & systems | Project presence |
| IDOM | Engineering consultant | Project presence |
| Sateba | Track technology supplier | Project presence |
| Kauno tiltai | Civil contractor | Project presence |
Withheld in the free surface
- Capex in this region (3)
- Market narrative
Full detail withheld: 2 fields. In the European Union edition · See a fully open example
- Programme profile
- Rail baltica note
- Signalling note
- Funding note
- Buyer practice note
- Contested note
- Open market note
- Supply base note
- How to watch
- Market monitoring note
Full detail withheld: 10 fields. In the European Union edition · See a fully open example
Browse: the Atlas · European Union · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.