Player · Civil contractor
? How to use this page

How to use a player page

  1. Where this supplier already holds positions, market by market.
  2. Competes with shows its rivals; Compare puts two players side by side.
  3. Order book and the partner path open with an edition.

AB Kauno tiltai

Subsidiary · HQ LT

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the European Union edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Kind
Civil contractor
Markets
1
Positions held
2

Lithuanian road, bridge and railway construction company, part of the Trakcja group.

Kind
Civil contractor
Headquarters
LT
Ownership
Subsidiary
Parent
Trakcja
Segments
Civil works, Track
Present in
European Union

Footprint

European Union

KindWhereDetailSources
Project presenceLithuaniaNamed as a winner on 2 awarded tenders the Atlas carries (buyers: LTG Infra)
  • ● Tenders Electronic Daily (TED) · Contract award notice 771094-2025, 20 November 2025 — 26517 Rail Baltica Kaunas–Panevėžys–LT/LV border, new formation Ramygala–Berčiūnai 78–102.43 km (24.43 km), works (DPS 28275) (published 2025 · checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · Contract award notice 100517-2026, 12 February 2026 — 31669 railway infrastructure design, works and design-execution supervision; negotiated procedure without prior call (published 2026 · checked 2026-09-13)

Positions held

SegmentTechnologyPhase
  • awarded by LTG Infra — LTG Infra railway infrastructure design works supervision — AB Kauno tiltai (active · since 2026-02)
  • awarded by LTG Infra — LTG Infra Rail Baltica Ramygala–Berčiūnai 24.43 km — AB Kauno tiltai (active · since 2025-11)
Sources for these relationships (3)
  • ● UAB Rail Baltica statyba · Project implementation — Kaunas–Lithuanian/Latvian border (mainline construction on the 114 km Kaunas–Panevėžys section and superstructure works), Kaunas railway node (designed by LTG Infra's own design unit, partly by public tender), Poland/Lithuania border–Kaunas (phase one complete, European-gauge line laid from the Polish border to Kaunas/Jiesia), Kaunas–Vilnius (design to begin once spatial planning is complete) (published 2026 · checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · Contract award notice 100517-2026, 12 February 2026 — 31669 railway infrastructure design, works and design-execution supervision; negotiated procedure without prior call (published 2026 · checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · Contract award notice 771094-2025, 20 November 2025 — 26517 Rail Baltica Kaunas–Panevėžys–LT/LV border, new formation Ramygala–Berčiūnai 78–102.43 km (24.43 km), works (DPS 28275) (published 2025 · checked 2026-09-13)

Competes with

Other civil contractor players present in the same markets.

PlayerHQMarketsPositions
VINCIFranceEuropean Union, United States, United Kingdom16
STRABAGAustriaEuropean Union15
DragadosSpainEuropean Union, United States, United Kingdom, Canada11
SŽ-ŽGPSIEuropean Union12
WebuildItalyEuropean Union, United States, Canada10
FCCSpainEuropean Union, Canada9
GH HoldingSIEuropean Union8
GRKFinlandEuropean Union8
3 sources · all primary
  • ● Tenders Electronic Daily (TED) · Contract award notice 100517-2026, 12 February 2026 — 31669 railway infrastructure design, works and design-execution supervision; negotiated procedure without prior call (published 2026 · checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · Contract award notice 771094-2025, 20 November 2025 — 26517 Rail Baltica Kaunas–Panevėžys–LT/LV border, new formation Ramygala–Berčiūnai 78–102.43 km (24.43 km), works (DPS 28275) (published 2025 · checked 2026-09-13)
  • ● Lithuanian Wikipedia · AB Kauno tiltai — company page (checked 2026-10-03)

Browse: the Atlas · European Union · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.