Buyer · Federal agency
? How to use this page

How to use a buyer page

  1. Who this buyer is, then who already holds positions here and what it is tendering.
  2. Click Watch and every change lands in your weekly digest.
  3. How to sell here — the route in, thresholds, portals and contacts — opens with this market's edition.

Federal Railroad Administration

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Type
Federal agency — US DOT modal agency; rail safety regulator and intercity passenger rail funder
Market · Region
United States
Open tenders
0
Technology areas
Signalling & train control, Cybersecurity, Track & civil

Regulates rail safety and funds intercity passenger rail including California HSR, Brightline West and Amtrak's NEC.

About this buyer

Read more

Regulates rail safety and funds intercity passenger rail (Federal-State Partnership, CRISI) — the federal money behind California HSR, Brightline West and Amtrak's NEC.

Type
Federal agency — US DOT modal agency; rail safety regulator and intercity passenger rail funder
Programmes
IIJA / Bipartisan Infrastructure Law, US high-speed rail, Northeast Corridor
Technology areas
Signalling & train control, Cybersecurity, Track & civil

Structure

  • funds MDOT Office of Rail — Federal-State Partnership awards announced 27 August 2026 for three Michigan Line projects: track and turnout renewal, four-bridge reconstruction and Blackman Road Bridge replacement (active · since 2026-08-27)
  • funds MBTA — Federal Railroad Administration grant for final design and construction of the Haverhill Double-Track Project (active · since 2026-08-14)
  • funds City of Ludington — CRISI grant for Marquette Rail track and yard improvements (active · since 2026-01-30)
  • funds Elkhart — Railroad Crossing Elimination grant 69A36526420920RCEIN for the Hively Avenue overpass (active · since 2026-01-29)
  • funds Fort Wayne — Railroad Crossing Elimination grant 69A36526420740RCEIN for a railway overpass; Norfolk Southern named as beneficiary (active · since 2026-01-27)
  • funds Lake State Railway — CRISI grant for the Huron Subdivision between Alpena and Pinconning, plus the earlier Mackinaw Subdivision grant (active · since 2025-12-16)
  • funds Schererville — Railroad Crossing Elimination grant 69A36525420390RCEIN for a grade-separated crossing; Norfolk Southern named as beneficiary (active · since 2025-07-15)
  • funds West Michigan Railroad — CRISI grant for rail replacement and mainline reconstruction (active · since 2025-06-11)
  • funds City of Detroit — Railroad Crossing Elimination grant for project development at Lonyo and Central streets (active · since 2025-05-30)
  • funds ORDC — Railroad Crossing Elimination Program (RCEP) awards, announced 10 January 2025, funding four Ohio Grade Crossing Elimination Program grade-separation projects for which ORDC is the direct federal grantee (Delaware County; North Ridgeville; Circleville; Hudson) (active · since 2025-01-10)
  • funds MDOT Office of Rail — CRISI selection for the Livernois Intermodal Facility (Detroit RECHARGED) (active · since 2024-10-30)
  • funds City of Monroe — Railroad Crossing Elimination grant for the West Elm Avenue grade separation (active · since 2024-09-27)
  • funds MDOT Office of Rail — Corridor ID Step 1 grants for the Wolverine, Blue Water and Pere Marquette corridors (active · since 2024-06-05)
  • funds LADOTD — Corridor Identification and Development Programme funding for the Baton Rouge to New Orleans corridor, announced 8 December 2023 (active · since 2023-12-08)
  • funds SRC — Corridor Identification and Development Programme funding each for the Mobile to New Orleans and I-20 corridors, announced 8 December 2023 (active · since 2023-12-08)
  • funds INDOT Rail Programs — CRISI grant 69A36523420230CRSIN to rehabilitate the CFE main line and Decatur Subdivision; CSX Transportation named among the beneficiaries (ended · since 2023-09-26)
  • funds MDOT Office of Rail — Federal-State Partnership grant for Ypsilanti-Jackson curve modification and continuous welded rail (active · since 2023-03-01)
  • funds MDOT Office of Rail — CRISI grants to MDOT: Great Lakes Central Ann Arbor-Owosso rehabilitation, Manistee River Bridge replacement and Michigan Line trespass prevention (active · since 2023-02-16)
  • controlled by USDOT — Operating administration of the DOT (active)
  • funds Amtrak — Annual federal grant agreements administered by the FRA (active)
  • funds UDOT — Railroad Crossing Elimination grant 69A36525420610RCEUT, Central Utah Rail Corridor Consolidation development work (1 May 2025 to 28 February 2029) (active)
  • funds CTDOT — Federal-State Partnership award for Walk Bridge construction, cumulative on USAspending (in 2023 plus in 2025) (active)
  • funds CTDOT — Federal-State Partnership award for TIME-1 Contract A, plus congressionally directed CRISI (active)
  • funds Housatonic Railroad — CRISI award, track and bridge rehabilitation near Danbury (active)
  • funds CTDOT — Federal-State Partnership award, design of seven rail overpass bridges on the New Haven Line (active)
  • funds CTDOT — FFY2024 Federal-State Partnership award, Cos Cob Bridge replacement planning study (capital plan listing) (active)
  • funds TRRA — CRISI grant 69A36522403380CRSMO, bridge rehabilitation, to 31 January 2029 (active)
  • funds TRRA — CRISI grant 69A36521402540CRSMO, Merchants Bridge Rehabilitation Program (period ended 31 January 2024) (ended)
  • funds TRRA — CRISI grant 69A36520401670CRSMO, MacArthur Bridge truss over South Broadway (period ended 31 December 2023) (ended)
  • funds MoDOT — CRISI grant 69A36525420750CRSMO, U.S. 60 rail overpass with BNSF, to 30 June 2028 (active)
  • funds TDOT Rail — CRISI grant for the Tennessee Short Line Railroads Bridge Bundle (announced 28 September 2023) (active)
  • funds TennKen — CRISI award 69A36524421220CRSNJ, federal, signed 27 August 2024, mainline track rehabilitation (active)
  • funds Eau Claire — Railroad Crossing Elimination award for the Galloway Street grade separation (federal award 69A36525420460RCEWI) (active)
  • funds WisDOT — INFRA award for Merrimac Bridge Phase III (federal award 69A36522403220INFWI) (active)
  • funds WisDOT — CRISI grant for the Twin Cities-Milwaukee-Chicago infrastructure project (federal award 69A36522403260CRSWI) (active)
  • funds WisDOT — CRISI award for the Muskego Yard Bypass, announced 28 October 2024 (active)
  • funds WisDOT — Federal-State Partnership grant for Next Generation single-level coaches (federal award 69A36520402040FSPWI) (active)
  • funds WisDOT — National Railroad Partnership Program grant of over for Charger locomotive overhauls, multi-state with WisDOT as lead applicant, announced by the FRA on 14 August 2026 (active)
  • funds NOPB / Rail NOLA — CRISI grant 69A36523403760CRSLA, federal, switching and railcar storage capacity, 1 November 2022 to 31 December 2024 (active)
  • funds Timber Rock Railroad — CRISI grant 69A36526422820CRSLA, federal, bridges and track from Derider, Louisiana to Kirbyville, Texas, 1 October 2025 to 30 August 2029 (active)
  • funds LNW — CRISI award for the McNeil Subdivision announced 25 October 2024; federal grant record not found (pending)
  • funds Dona Ana County — Railroad Crossing Elimination award for the Industrial Avenue grade separation at Santa Teresa (reported June 2023) (active)
  • funds NMDOT — Railroad Crossing Elimination selection of for the Allison Road grade separation in Gallup (announced January 2025) (active)
  • funds RIDOT — Federal-State Partnership (State of Good Repair) award, Providence Station State of Good Repair and Capacity Project (active)
  • funds QDC — CRISI award, Mill Creek Railyard under the Quonset freight rail enhancements project (active)
  • funds DelDOT — Grant FR-HSR-0097-11, federal, Delaware Northeast Corridor third track, 28 September 2011 to 30 June 2021 (ended)
  • funds DelDOT — Corridor ID Step 1 grant 69A36524520110FSPDE, federal, Diamond State Corridor, 1 April 2024 to 31 July 2026 (active)
  • funds Delmarva Central — CRISI grant 69A36521402580CRSPA, federal, main line, crossings and moveable bridges, to 30 October 2028 (active)
  • funds NNEPRA — CRISI award, Wells Area Improvement Project (active)
  • funds NNEPRA — Federal-State Partnership for Intercity Passenger Rail award, Downeaster crosstie replacement (active)
  • funds NNEPRA — FRA selection of 14 August 2026, Portland Station Relocation under the FY 2024-2026 Federal-State Partnership (National Railroad Partnership Program); grant obligation pending (pending)
  • funds MaineDOT — CRISI award, Eastern Maine Railway mainlines and Millinocket dormant track (active)
  • funds MaineDOT — CRISI award, 75 miles of Pan Am Railways mainline in central Maine (now CSX) (active)
  • funds MaineDOT — Nationally Significant Freight and Highway Projects award, Maine Railroad Bridge Capacity Project (ended 31 December 2023) (ended)
  • funds PAL — CRISI award 69A36524420560CRSKY, federal, signed 13 August 2024, for PAL bridges, Paducah Yard and locomotives (active)
  • funds GRADD — Award 69A36525420030INFKY, federal, signed 6 August 2025, for the Rockport Railroad Bridge (active)
  • funds L&I — CRISI award 69A36525421620CRSIN, federal, signed 19 September 2025, for the Clagg lift span (active)
  • funds KYTC Rail Planning — Railroad Crossing Elimination FY2023-2024 selection federal, for the Quarry Road grade separation (selection, not a signed award) (pending)
  • funds Palmetto Railways — INFRA award for the Camp Hall industrial rail line (federal award 69A36524420000INFSC) (active)
  • funds Lancaster & Chester — CRISI award for the Piedmont freight rail service improvement programme (federal award 69A36520501390CRSSC) (active)
  • funds Chester County — CRISI selection for the Piedmont Regional Rail Capacity Improvement Project (FRA, 29 October 2024; no grant agreement found) (active)
  • funds City of Columbia — Railroad Crossing Elimination selection for the Assembly Street rail separation, announced 10 January 2025 (no FRA agreement found) (pending)
  • funds ODOT — Railroad Crossing Elimination selection of for the Occupied Crossing Mitigation Project in Davis (FRA list, 10 January 2025) (pending)
  • funds ODOT — CRISI award for the Kiamichi Tri-State rail upgrade, phase 1 (signed December 2022) (active)
  • funds Kiamichi Railroad — CRISI selection of for the Kiamichi Tri-State rail upgrade, phase 2 (2024 round) (pending)
  • funds Stillwater Central — CRISI selection of for the Oklahoma Short Line Track Upgrade and Growth Project (2024 round) (pending)
  • funds Alabama Port Authority — CRISI award 69A36523420020CCDAL, federal, signed 10 July 2023, for the Montgomery ICTF and the Chickasaw Lead (active)
  • funds Pelham — Railroad Crossing Elimination award 69A36526420550RCEAL, federal, signed 2 February 2026, for Shelby County Road 52 (active)
  • funds Calera — Railroad Crossing Elimination award 69A36526420170RCEAL, federal, signed 21 January 2026, for the State Route 25 grade separation (active)
  • funds Birmingham — CRISI award 69A36525421200CRSAL, federal, signed 3 July 2025, for blocked-crossing design with Norfolk Southern (active)
  • funds CRANDIC — FRA CRISI awards signed in 2025: tie replacement (federal), yard safety and operations (federal) and UP overhead bridge (federal) (active)
  • funds IAIS — FRA CRISI award announced October 2024 for four bridges, per the Senator's release; the railroad's release thanks the Iowa and Illinois DOTs for their support (active)
  • funds IANR — FRA CRISI award signed January 2023 for continuous welded rail, federal (active)
  • funds CRANDIC — FRA CRISI award signed December 2025 for yard safety in Cedar Rapids, federal (active)
  • funds KDOT — CRISI award for the Cimarron Valley Railroad upgrade (agreement signed April 2023) (active)
  • funds KDOT — CRISI award for the Kyle Railroad Concordia Subdivision (agreement signed June 2023) (active)
  • funds KDOT — CRISI selection of for the SKOL Neodesha Subdivision, KDOT as grantee (announced October 2023) (pending)
  • funds KDOT — Corridor ID award for the Heartland Flyer corridor to Newton (April 2024) (active)
  • funds Wellington — Railroad Crossing Elimination grant for the Wellington Sealed Corridor Project (signed January 2026) (active)
  • funds KDOT — CRISI award for the SKOL rehabilitation project (signed June 2021) (active)
  • funds Nebraska Central Railroad — FRA grant for the NCRC infrastructure improvements project (signed 20 May 2020) (active)
  • funds Nebraska Central Railroad — FRA grant for four rail sidings (signed 6 March 2024) (active)
  • funds Manning Rail — FRA grant for the Fairmont to Burress grain line upgrade (signed 23 September 2025) (active)
  • funds City of Lincoln — Railroad Crossing Elimination selection of for the 33rd/Cornhusker Viaduct (announced January 2025) (pending)
  • funds NDOT — Railroad Crossing Elimination planning grant for the Grand Island rail crossing study (signed 1 December 2025) (active)
  • funds Port of Little Rock — FRA FY2021 CRISI selection for port track and an engine facility (active)
  • funds DQE — FRA FY2022 CRISI selection announced 25 September 2023 across Arkansas and Oklahoma (active)
  • funds HCPHC — Federal grant for the Port Bienville classification yard (signed June 2025) (active)
  • funds Port of Rosedale — CRISI grant for the Great River Railroad restoration (signed February 2026) (active)
  • funds Natchez Railway — CRISI grant for Natchez Railway improvements (signed January 2026) (active)
  • funds Hattiesburg — CRISI grant for the Hall Avenue crossing relief project (signed August 2023) (active)
  • funds Grenada Railroad — CRISI grant to Grenada Railroad (signed April 2022; period ended August 2023) (ended)
  • funds A&O — FY2022 CRISI grant, Supporting Anticipated Freight Growth in Rural West Virginia (active)
  • funds Winchester & Western — CRISI grant for Winchester & Western mainline rehabilitation, announced 25 October 2024 (active)
  • funds Cathcart Rail — CRISI grant for Belpre Industrial Parkersburg bridge repairs, announced 25 October 2024 (active)
  • funds VTrans Rail — FRA grants held by VTrans: the BUILD-coded corridor upgrade record, CRISI lines for Vermonter safety and station work, and two Corridor ID planning grants (active)
  • funds NECR — CRISI grant signed 27 January 2026 for NECR track and bridge work in Vermont, with Providence & Worcester work in two other states (active)
  • funds NHDOT — FRA grant FR-HSR-0101-12, New Hampshire Capital Corridor planning, 2011 to 2015 (ended)
  • funds ITD — Railroad Crossing Elimination grant, SH-53 Pleasant View interchange, signed August 2024 (active)
  • funds ITD — CRISI grant, Magic Valley Rail Safety and Capacity Expansion, September 2021 (active)
  • funds BSPRA — FRA Corridor ID planning grant for the Big Sky North Coast Corridor (active)
  • funds WYDOT — CRISI Special Transportation Circumstances award, College Drive overpass, Cheyenne (active)
  • funds WYDOT — CRISI Special Transportation Circumstances award, two grade separations, Cheyenne area (active)
  • funds NDDOT — Railroad Crossing Elimination grant, Grand Forks underpass, signed July 2025 (active)
  • funds RRVW — CRISI grant, Casselton to Wahpeton welded rail, signed March 2024 (active)
  • funds NDDOT — CRISI grant, Independence to Oakes rail replacement, signed June 2023 (active)
  • funds SDDOT — CRISI grant, Sisseton Milbank modernization, signed December 2025 (active)
  • funds SDDOT — National Infrastructure Investments award, Pierre to Rapid City upgrade, signed September 2024 (active)
  • funds SDDOT — CRISI STC grant, DMVW Britton line, signed December 2025 (active)
  • funds SDDOT — CRISI grant, RCPE Pierre to Rapid City remaining segment, signed September 2025 (active)
  • funds SDDOT — CRISI STC grant, 11.84-mile welded rail replacement, signed December 2025 (active)
  • funds SDDOT — CRISI grant, Chamberlain to Presho track renewal, signed September 2025 (active)
  • funds Alaska Railroad — CRISI grant, positive train control vital functions (active)
  • funds Alaska Railroad — Federal-State Partnership award, Willow bridge at MP 190.5 (active)
Sources for these relationships (146)
  • ● USAspending award 69A36520401560CRSAK · FRA CRISI award to Alaska Railroad Corporation for vital functions for positive train control: federal 10,376,704, non-federal 2,594,176, signed 16 June 2020, performance to 31 January 2027 (published 2020-06-16 · checked 2026-10-08)
  • ● USAspending award 69A36526420910FSPAK · FRA Federal-State Partnership award to Alaska Railroad Corporation for replacement of the main-line bridge at MP 190.5 near Willow: federal 8,200,558, non-federal 2,327,072, signed 23 December 2025, performance to 31 March 2030 (published 2025-12-23 · checked 2026-10-08)
  • ○ FRA Railroad Crossing Elimination Program FY 2022 selections · FRA selection text read from a copy hosted by Railway Age because railroads.dot.gov returns HTTP 403 (Secondary host): City of Calera State Road 25 Railway-Highway Grade Separation, up to $11,742,184, realigning State Route 25 over the CSX railway to eliminate two crossings, 20 per cent non-federal match from the City and CSX, rural set-aside; City of Pelham Shelby County Road 52, up to $41,766,038, overpass over CSX's line with the cities of Pelham and Helena, Shelby County and CSX contributing the match (published 2023-06 · checked 2026-10-08)
  • ● USAspending.gov - FRA CRISI award 69A36523420020CCDAL, Alabama Port Authority · Federal award record: $67,300,000 federal, $23,073,440 non-federal, $90,373,440 total funding, signed 10 July 2023, performance 1 June 2023 to 30 April 2028; Montgomery inland intermodal container transfer facility with CSX and the City of Montgomery, and the Chickasaw Lead track in Mobile (published 2023-07-10 · checked 2026-10-08)
  • ● USAspending.gov - FRA CRISI award 69A36525421200CRSAL, City of Birmingham · Federal award record: $8,000,000 federal, $2,000,000 non-federal, $10,000,000 total funding, signed 3 July 2025, performance 1 July 2025 to 31 January 2027; preliminary engineering at 30 per cent, NEPA and project management with Norfolk Southern for blocked-crossing elimination (published 2025-07-03 · checked 2026-10-08)
  • ● USAspending.gov - FRA Railroad Crossing Elimination award 69A36526420170RCEAL, City of Calera · Federal award record: $11,742,184 federal, $2,935,546 non-federal, $14,677,730 total funding, signed 21 January 2026, performance 1 October 2025 to 1 February 2030; eliminates the 17th Avenue and 20th Avenue at-grade crossings (published 2026-01-21 · checked 2026-10-08)
  • ● USAspending.gov - FRA Railroad Crossing Elimination award 69A36526420550RCEAL, City of Pelham · Federal award record: $41,766,038 federal, $10,644,815 non-federal, $52,410,853 total funding, signed 2 February 2026, performance 1 October 2025 to 30 April 2031; closes two CSX crossings on Shelby County Road 52, full-cycle activities, no sub-recipients (published 2026-02-02 · checked 2026-10-08)
  • ● Amtrak · Audited consolidated financial statements FY2024 (preferred stock held by the DOT; FRA grant agreements) (published 2025 · checked 2026-09-06)
  • ● 2025 Arkansas State Rail Plan (full plan, August 2025) · Full plan: no dedicated state freight or passenger rail funding programme; Section 130 about $4 million a year; Little Rock Port Authority CRISI project; DeQueen and Eastern CRISI 2023; 91 LRITP rail projects of $1.72 billion with no funding; no Corridor ID applications from Arkansas (published 2025-08 · checked 2026-10-08)
  • ● CTDOT Transportation Infrastructure Capital Plan Report FY2026-FY2030 · Capital plan report: FSP-NEC awards, rail projects in design and construction, rail initiatives (published 2026-02 · checked 2026-10-07)
  • ● USAspending.gov (FRA award 69A36524421120CRSCT) · FRA CRISI award to Housatonic Railroad Co Inc, 5,372,500, 1 May 2025 to 30 April 2028 (published 2025-05-01 · checked 2026-10-07)
  • ● USAspending.gov (FRA award 69A36525420970FSPCT) · FRA Federal-State Partnership award to CTDOT, 44,000,000, 1 June 2025 to 31 March 2030: development, environmental review and final design of seven rail overpass bridges and Class 6 track between mileposts 56.8 and 60.1 (published 2025-06-01 · checked 2026-10-07)
  • ● USAspending.gov (FRA award 69A36526421300FSPCT) · FRA Federal-State Partnership award for TIME-1 Contract A, 172,000,000, 1 January 2026 to 31 January 2031 (published 2026-01-01 · checked 2026-10-07)
  • ● USAspending.gov (FRA award 69A36526220210CCDCT) · FRA congressionally directed CRISI award for part of TIME-1 Contract A, 12,000,000 (published 2025-10-01 · checked 2026-10-07)
  • ● USAspending.gov (FRA award 69A36523420020FSPCT) · FRA Federal-State Partnership award to CTDOT for Walk Bridge construction, 574,600,000, 1 August 2023 to 30 April 2032; read through the USAspending API (published 2023-08-01 · checked 2026-10-07)
  • ● USAspending: FRA CRISI grant 69A36521402580CRSPA (Delmarva Central Railroad) · Award record: CRISI project grant of 12,940,954 federal with 7,279,286 non-federal to Delmarva Central Railroad for its main line, nine crossings and three moveable bridges; signed 17 February 2021; period 1 December 2020 to 30 October 2028; place of performance Delaware. Federal award data. (published 2024-09-30 · checked 2026-10-08)
  • ● USAspending: FRA grant 69A36524520110FSPDE (Diamond State Corridor) · Award record: 500,000 to the Delaware Department of Transportation under the Federal-State Partnership programme code for the proposed Diamond State Corridor between Newark or Wilmington and Salisbury or Berlin, Maryland, to prepare the Corridor ID Step 2 scope; signed 12 March 2024; period 1 April 2024 to 31 July 2026. Federal award data. (published 2025-09-23 · checked 2026-10-08)
  • ● USAspending: FRA grant FR-HSR-0097-11 (Delaware NEC third track) · Award record: FRA High-Speed Rail Corridors and Intercity Passenger Rail capital grant of 13,300,000 to the Delaware Department of Transportation, 28 September 2011 to 30 June 2021, 'Delaware Northeast Corridor Third Track Project'. Federal award data. (published 2021-07-26 · checked 2026-10-08)
  • ● FRA CRISI FY2021 selections (Wayback Machine copy of railroads.dot.gov file) · Lists Arkansas - Freight Rail Capacity Improvement Project, Little Rock Port Authority, up to $5,569,373, 11,215 feet of track and an engine maintenance facility, 25 percent applicant match. railroads.dot.gov returns 403 to curl, so the Wayback copy of the FRA file was read (published 2022-06 · checked 2026-10-08)
  • ● FRA CRISI FY2022 selections: project summaries (Wayback Machine copy) · Lists Arkansas - Resilient Infrastructure & Safety Enhancement Project, DeQueen and Eastern Railroad, LLC, up to $11,830,000, with the Texas, Oklahoma and Eastern Railroad; 30 percent applicant match (published 2023-09-25 · checked 2026-10-08)
  • ● FRA Railroad Crossing Elimination FY2023-24 project selections · FRA selections document: Nebraska 33rd/Cornhusker Viaduct, up to $66,706,880, applicant City of Lincoln. railroads.dot.gov returns 403 to curl; read from Internet Archive copy (published 2025-01-10 · checked 2026-10-08)
  • ○ Iowa receiving $97 million for transportation efforts (KCRG, Senator's announcement) · Lists FRA CRISI awards under the IIJA announced 25 October 2024: Iowa Interstate $29,883,200 for the Colfax, De Soto, Rock River and Atkinson bridges; CRANDIC $19,040,000; East Erie Commercial Rail $48,412,512 for locomotive remanufacturing. Secondary: the federal amount for the Iowa Interstate award is read here because the railroad's release prints none and no USAspending record was found (published 2024-10-25 · checked 2026-10-08)
  • ● Iowa Interstate Railroad: FRA Awards Grant to Iowa Interstate · Railroad's own release of 29 October 2024: CRISI grant for design and construction of bridges at Colfax and De Soto in Iowa, the Rock River and Atkinson in Illinois; railroad commits a match of nearly $6 million; Iowa DOT and Illinois DOT named as partners; the page prints no federal amount (published 2024-10-29 · checked 2026-10-08)
  • ● USAspending award 69A36521403050CRSID · FRA CRISI grant to ITD, Magic Valley Rail Safety and Capacity Expansion: federal obligation, non-federal funding, total funding, period 1 September 2021 to 30 June 2023, Minidoka County (Rupert) (published 2021-09-22 · checked 2026-10-08)
  • ● USAspending award 69A36524420240RCEID · Federal Railroad Administration Railroad Crossing Elimination grant to ITD: federal obligation, non-federal funding and total funding, period 1 July 2024 to 31 October 2027, Kootenai County (published 2024-08-14 · checked 2026-10-08)
  • ● USAspending.gov - FRA award 69A36526420920RCEIN (City of Elkhart) · Federal award record: Railroad Crossing Elimination grant for the Hively Avenue overpass (published 2026-01-29 · checked 2026-10-07)
  • ● USAspending.gov - FRA award 69A36526420740RCEIN (City of Fort Wayne) · Federal award record: Railroad Crossing Elimination grant for a grade-separated overpass; beneficiaries City of Fort Wayne and Norfolk Southern (published 2026-01-27 · checked 2026-10-07)
  • ● USAspending.gov - FRA award 69A36523420230CRSIN (INDOT CRISI) · Federal award record: INDOT CRISI grant to rehabilitate the CFE main line and Decatur Subdivision between Warsaw and Etna Green; beneficiaries INDOT, CFE and CSX Transportation (published 2023-09-26 · checked 2026-10-07)
  • ● USAspending.gov - FRA award 69A36525420390RCEIN (Town of Schererville) · Federal award record: Railroad Crossing Elimination grant for a grade-separated crossing; beneficiaries Town of Schererville and Norfolk Southern (published 2025-07-15 · checked 2026-10-07)
  • ● Kansas Register: South Kansas & Oklahoma Railroad request for proposals · Notice published 6 February 2025 in the State's official register: Watco, for SKOL, seeks proposals for the Southeast Kansas Short Line Rail Upgrade and Growth Project (Neodesha Subdivision, mileposts 350.0 to 387.0, 49 crossings, 37 miles of welded rail and surfacing); KDOT project number cited; schedule with proposal due 26 March 2025 and award 11 April 2025 (published 2025-02-06 · checked 2026-10-08)
  • ○ 10/11 Now report on the Lincoln viaduct grant (10 January 2025) · TV report: up to $66.7m from FRA for a bridge over the rail corridor eliminating the North 33rd Street and Adams Street crossings; BNSF, the City and the Railroad Transportation Safety District provide a 20 percent match; recipient not explicitly named, total project cost not stated. Secondary (published 2025-01-10 · checked 2026-10-08)
  • ● FRA Railroad Crossing Elimination Program, FY 2023-2024 selections: project summaries · FRA selection summaries read from a web.archive.org copy because railroads.dot.gov returns HTTP 403; the Kentucky entry is the Quarry Road Grade Separation Project, up to $9,589,600, selected for final design and construction on CSX-owned infrastructure in Hardin, Larue and Hart Counties, with the Cabinet providing the 20 per cent non-federal match (checked 2026-10-08)
  • ● USAspending.gov - FRA award 69A36525420030INFKY, Green River Area Development District Inc · Federal award record: $17,331,850 federal, $21,183,250 non-federal, $38,515,100 total funding, signed 6 August 2025, performance 1 January 2025 to 31 May 2029; Rockport Railroad Bridge rehabilitation, Ohio County; programme recorded as Railroad Development (published 2025-08-06 · checked 2026-10-08)
  • ● USAspending.gov - FRA CRISI award 69A36525421620CRSIN, Louisville & Indiana Railroad Company · Federal award record: $6,492,000 federal, $6,492,000 non-federal, $12,984,000 total funding, signed 19 September 2025, performance 1 September 2025 to 31 March 2028; replace four bridge assemblies on the Clagg lift span of the 14th Street Bridge; place of performance recorded as multi-state (published 2025-09-19 · checked 2026-10-08)
  • ● USAspending.gov - FRA CRISI award 69A36524420560CRSKY, Paducah & Louisville Railway Inc · Federal award record: $29,563,000 federal, $33,337,000 non-federal, $62,900,000 total funding, signed 13 August 2024, performance 1 August 2024 to 31 January 2030; Paducah Yard, 23 bridges and 19 locomotives (published 2024-08-13 · checked 2026-10-08)
  • ● US Senator Bill Cassidy release: $63.1 million for Louisiana railroad projects · Release of 25 October 2024 relaying the US DOT grant list for Louisiana: Louisiana and North West Railroad Company, LLC $27,320,000 to replace outdated rail and rehabilitate track across about 44 miles; also Patriot Rail Company LLC $30,600,000 and Jaguar Transport Holdings, LLC $5,229,456. (published 2024-10-25 · checked 2026-10-08)
  • ○ Progressive Railroading: CRISI short-line projects by state (trade press) · Secondary: dated 12 November 2024; lists Louisiana and North West Railroad Co. $27.3 million for the McNeil Subdivision between Magnolia, Arkansas and Gibsland, Louisiana. FRA's selection page returns HTTP 403 and no USAspending record was found for this award. (published 2024-11-12 · checked 2026-10-07)
  • ● Southern Rail Commission release: federal funding for passenger rail corridors · Release of 8 December 2023: Corridor Identification and Development Program, $500,000 each to LADOTD (Baton Rouge to New Orleans) and to the Commission (Mobile to New Orleans; I-20). (published 2023-12-08 · checked 2026-10-07)
  • ● USAspending: FRA CRISI grant 69A36523403760CRSLA (NOPB) · Federal award record: $7,297,421 federal, non-federal $10,946,209, total $18,243,630; period 1 November 2022 to 31 December 2024; switching and railcar storage capacity. (published 2023-02-16 · checked 2026-10-07)
  • ● USAspending: FRA CRISI grant 69A36526422820CRSLA (Timber Rock Railroad) · Federal award record: $40,000,000 federal, non-federal $10,000,000, total $50,000,000; period 1 October 2025 to 30 August 2029; about 29 bridges and track from Derider, Louisiana to Kirbyville, Texas; signed 19 February 2026. (published 2026-02-19 · checked 2026-10-07)
  • ○ Senate press release on Oklahoma railroad grants (15 January 2025) · US Senator's office release naming four Railroad Crossing Elimination grants to ODOT and the City of Claremore, including about $25.4m for the Occupied Crossing Mitigation Project in Davis. Secondary: the funder's own award page (railroads.dot.gov) returns 403 (published 2025-01-15 · checked 2026-10-08)
  • ● Massachusetts Bay Transportation Authority · FY27-31 Capital Investment Plan (CIP), Final - July 2026 (128-page book and project list) (published 2026-07 · checked 2026-09-13)
  • ● Massachusetts Bay Transportation Authority · Governor Healey Announces $140 Million in Federal Funding for Haverhill Line Improvements (published 2026-08-14 · checked 2026-09-13)
  • ○ Maine Senator's release: more than $53 million for freight rail upgrades in rural Maine · Congressional release of 25 October 2024: FY2024 CRISI award to MaineDOT for about 140 miles of work on two Eastern Maine Railway mainlines and dormant track to the One North Bio-Industrial Park in Millinocket; Eastern Maine Railway and One North provide the 20 percent match; total project cost above $66.6 million; Secondary because the FRA page is behind a 403 (published 2024-10-25 · checked 2026-10-08)
  • ● FRA FY 2024-2026 Federal-State Partnership (National Railroad Partnership Program) Project Selections, 14 August 2026 · FRA project summaries for 41 selections; Maine Portland Station Relocation, up to $48,136,000, NNEPRA, selected for final design, right-of-way acquisition and construction, 20 percent non-federal match; read from the web.archive.org copy because railroads.dot.gov returns 403 to automated clients (published 2026-08-14 · checked 2026-10-08)
  • ● Maine State Rail Plan, March 2023 · MaineDOT's state rail plan: 1,072-mile system operated by eight carriers, ownership and operated miles by railroad, Downeaster corridor and host railroads, Amtrak service agreement, Industrial Rail Access Program, annual rail line improvement allocation, 2021 bond Question 2, CP acquisition of Central Maine and Quebec Railway, CSX acquisition of Pan Am Railways, Rockland Branch operator change (published 2023-03-01 · checked 2026-10-08)
  • ● NNEPRA Board Packet, 28 September 2026 · Board briefing materials including minutes of 17 August 2026: Wells Area Improvement Project on target for completion in late October or early November 2026, FRA award for Portland Station Relocation, total estimated cost and local match, FY2026 performance; next meeting 26 October 2026 (published 2026-09-28 · checked 2026-10-08)
  • ○ Maine Senators' release: $48 million for new Downeaster train station in Portland · Congressional release of 14 August 2026 as republished by Capitol Releases: $48,136,000 to relocate Portland's Downeaster station to the mainline, selected to advance through final design, right-of-way acquisition and construction, NNEPRA 20 percent non-federal match; Secondary because the FRA's own page is behind a 403 and the release names no FRA programme (published 2026-08-14 · checked 2026-10-08)
  • ● USAspending award 69A36519500400INFME (FRA to MaineDOT) · Maine Railroad Bridge Capacity Project; signed 27 March 2019; federal $7,890,000, non-federal $11,426,431; period 1 February 2019 to 31 December 2023 (published 2019-03-27 · checked 2026-10-08)
  • ● USAspending award 69A36526421610CRSME (FRA CRISI to MaineDOT) · FRA CRISI award titled Driving Maine's Rural Economy Through Freight Rail Efficiency; signed 26 January 2026; federal $53,313,091, non-federal $13,328,273; period 1 January 2026 to 31 August 2029 (published 2026-01-26 · checked 2026-10-08)
  • ● USAspending award 69A36522503390CRSME (FRA CRISI to MaineDOT) · FRA CRISI award to rehabilitate and modernise 75 miles of Pan Am Railways mainline in central Maine (rail, signalling, switches, crossings); signed 16 May 2022; federal $17,468,840, non-federal $18,036,932; period 1 April 2022 to 31 July 2026 as last modified 23 September 2025 (published 2022-05-16 · checked 2026-10-08)
  • ● USAspending award 69A36525420900FSPME (FRA to NNEPRA) · FRA Federal-State Partnership for Intercity Passenger Rail award: replace about 124,000 crossties, 1,290 switch timbers at 43 turnouts, ballast and surfacing for Amtrak Downeaster and CSX; signed 1 November 2024; federal $27,492,000, non-federal $6,873,000; period 1 October 2024 to 31 August 2026 (published 2024-11-01 · checked 2026-10-08)
  • ● USAspending award 69A36522403100CRSME (FRA CRISI to NNEPRA) · FRA CRISI award, Wells Area Improvement Project: extend the No. 2 siding about 11,000 feet and add platform capacity; signed 23 November 2021; federal $24,995,403, non-federal $6,100,000; period 1 October 2021 to 28 February 2027 (published 2021-11-23 · checked 2026-10-08)
  • ● Michigan Infrastructure Office - press release · Michigan Secures $145 Million in Funding for Passenger Rail Improvements, 27 August 2026: three Federal-State Partnership awards on the Michigan Line (published 2026-08-27 · checked 2026-10-07)
  • ● Michigan Infrastructure Office - press release · MDOT secures over $67 million for the Livernois Intermodal Facility (Detroit RECHARGED), CRISI selection, 30 October 2024 (published 2024-10-30 · checked 2026-10-07)
  • ● USAspending.gov (US Treasury) - federal award record · FRA Corridor ID Step 1 grant 69A36524520640FSPMI to MDOT: Blue Water (signed 17 June 2024) (published 2024-06-17 · checked 2026-10-07)
  • ● USAspending.gov (US Treasury) - federal award record · FRA Corridor ID Step 1 grant 69A36524520620FSPMI to MDOT: Pere Marquette (signed 5 June 2024) (published 2024-06-05 · checked 2026-10-07)
  • ● USAspending.gov (US Treasury) - federal award record · FRA Corridor ID Step 1 grant 69A36524520630FSPMI to MDOT: Wolverine and Windsor extension (signed 17 June 2024) (published 2024-06-17 · checked 2026-10-07)
  • ● USAspending.gov (US Treasury) - federal award record · FRA Railroad Crossing Elimination grant 69A36525421780RCEMI to the City of Detroit: Lonyo and Central Street track consolidation (signed 30 May 2025) (published 2025-05-30 · checked 2026-10-07)
  • ● USAspending.gov (US Treasury) - federal award record · FRA Federal-State Partnership grant 69A36523404140FSPMI to MDOT: curve modification and continuous welded rail, Ypsilanti-Jackson (signed 1 March 2023) (published 2023-03-01 · checked 2026-10-07)
  • ● USAspending.gov (US Treasury) - federal award record · FRA CRISI grant 69A36525420780CRSMI to MDOT: Great Lakes Central track rehabilitation, Ann Arbor to Owosso (signed 9 July 2025) (published 2025-07-09 · checked 2026-10-07)
  • ● USAspending.gov (US Treasury) - federal award record · FRA CRISI grant 69A36526421500CRSMI to Lake State Railway Co: Huron Subdivision, Alpena to Pinconning (signed 16 December 2025) (published 2025-12-16 · checked 2026-10-07)
  • ● USAspending.gov (US Treasury) - federal award record · FRA CRISI grant 69A36520401230CRSMI to Lake State Railway Co: Mackinaw Subdivision infrastructure improvements (signed 10 March 2020) (published 2020-03-10 · checked 2026-10-07)
  • ● USAspending.gov (US Treasury) - federal award record · FRA CRISI grant 69A36526421640CRSMI to the City of Ludington: Marquette Rail track and yard improvements (signed 30 January 2026) (published 2026-01-30 · checked 2026-10-07)
  • ● USAspending.gov (US Treasury) - federal award record · FRA CRISI grant 69A36525421100CRSMI to MDOT: Manistee River Bridge replacement (signed 9 July 2025) (published 2025-07-09 · checked 2026-10-07)
  • ● USAspending.gov (US Treasury) - federal award record · FRA Railroad Crossing Elimination grant 69A36524420380RCEMI to the City of Monroe: West Elm Avenue grade separation (signed 27 September 2024) (published 2024-09-27 · checked 2026-10-07)
  • ● USAspending.gov (US Treasury) - federal award record · FRA CRISI grant 69A36522403520CRSMI to MDOT: trespass prevention, Dearborn-Kalamazoo (signed 16 February 2023) (published 2023-02-16 · checked 2026-10-07)
  • ● USAspending.gov (US Treasury) - federal award record · FRA CRISI grant 69A36525420860CRSMI to West Michigan Railroad Co: rail replacement and mainline reconstruction (signed 11 June 2025) (published 2025-06-11 · checked 2026-10-07)
  • ● USAspending.gov: FRA CRISI grant 69A36525420750CRSMO, Missouri Department of Transportation · Federal award record: $10,357,239, CFDA 20.325, 1 January 2025 to 30 June 2028, signed 16 June 2025; full life-cycle grant for a grade-separated interchange and rail overpass on U.S. 60 with BNSF, closing eight at-grade crossings. (published 2025-06-16 · checked 2026-10-07)
  • ● USAspending.gov: FRA CRISI grant 69A36522403380CRSMO, Terminal Railroad Association of St. Louis · Federal award record: $28,790,947, CFDA 20.325 (CRISI), 1 May 2022 to 31 January 2029, signed 25 August 2022; rehabilitate the bridge to a state of good repair for freight and passenger rail (the record does not name the bridge). (published 2022-08-25 · checked 2026-10-07)
  • ● USAspending.gov: FRA CRISI grant 69A36520401670CRSMO, Terminal Railroad Association of St. Louis · Federal award record: $7,170,346, CFDA 20.325, 1 August 2020 to 31 December 2023, signed 1 September 2020; replacement of the MacArthur Bridge truss over South Broadway. (published 2020-09-01 · checked 2026-10-07)
  • ● USAspending.gov: FRA CRISI grant 69A36521402540CRSMO, Terminal Railroad Association of St. Louis · Federal award record: $20,032,989.16, CFDA 20.325, 1 February 2021 to 31 January 2024, signed 4 February 2021; titled The Merchants Bridge Rehabilitation Program. (published 2021-02-04 · checked 2026-10-07)
  • ● BSPRA - Corridor ID Program · BSPRA page: accepted into FRA Corridor ID in December 2023; planning team led by David Evans and Associates; Big Sky North Coast Corridor (published undated · checked 2026-10-08)
  • ● BSPRA - Fast Facts sheet (February 2026) · Two-page PDF: 2023 FRA Corridor ID grant of $500,000; Step I 2024-2026, Step II 2026-2028, Step III from 2028; non-federal match 10 and 20 percent; service target early to mid 2030s (published 2026-02 · checked 2026-10-08)
  • ● USAspending award 69A36523420130CRSND · FRA CRISI grant to NDDOT, RRVW 3rd Subdivision Independence to Oakes: federal $6,294,964.13, non-federal $2,736,556.87, total $9,031,521; signed 2023-06-30; period ended 2025-03-31 (published 2023-06-30 · checked 2026-10-08)
  • ● USAspending award 69A36524420340CRSND · FRA CRISI grant to Red River Valley & Western Railroad Co: federal $11,772,708, non-federal $2,943,177, total $14,715,885; signed 2024-03-12; period to 2027-02-01 (published 2024-03-12 · checked 2026-10-08)
  • ● USAspending award 69A36525420530RCEND · FRA Railroad Crossing Elimination grant to NDDOT, Grand Forks grade separation: federal $30,000,000, non-federal $20,625,000, total $50,625,000; signed 2025-07-23; period to 2030-05-31 (published 2025-07-23 · checked 2026-10-08)
  • ○ NM Political Report, 6 June 2023, federal Railroad Crossing Elimination award to Dona Ana County · News report of the FRA Railroad Crossing Elimination award of $31,171,088 to Dona Ana County for a grade-separated roadway under Union Pacific's line in Santa Teresa; county provides a 20 per cent match. Secondary: FRA's selection page was not read; the article also gives $37.1 million as total federal funding, which conflicts with the grant figure (published 2023-06-06 · checked 2026-10-08)
  • ○ New Mexico congressional delegation release, 13 January 2025 · Delegation announcement of Department of Transportation awards in New Mexico: Railroad Crossing Elimination grant to NMDOT for a grade-separated crossing at Allison Road in Gallup (BNSF infrastructure and the Southwest Chief route), the FY2025 grant for the Rail Runner maintenance facility, and smaller crossing awards. Secondary: a legislator's release, used because FRA's own selection page was not read; the figures agree with the State Rail Plan (published 2025-01-13 · checked 2026-10-08)
  • ● New Mexico State Rail Plan, February 2026 · NMDOT State Rail Plan prepared by Huitt-Zollars; read page by page: ownership and operation of Rail Runner (pp. 30-40), funding programmes (pp. 91-96), short-range investment programme (pp. 115-119), long-range programme (p. 127-128) (published 2026-02-13 · checked 2026-10-08)
  • ● ODOT Davis RCE funding commitments (30 August 2024) · ODOT's cover letter and BNSF support letter for the Occupied Crossing Mitigation application: close Atlanta Avenue and Hanover Road crossings, remove siding at Benton Avenue and Main Street, build about 2 miles of new siding south of Hanover Road; request, total cost and ODOT and BNSF match figures (published 2024-08-30 · checked 2026-10-08)
  • ● Oklahoma State Rail Plan, June 2026 (Version 1.0, draft) · ODOT's draft 2026 State Rail Plan as posted for comment: Freight Mobility Branch, 142 miles of state-owned track, Heartland Flyer funding tables 2-6 and 2-7, CRISI and RCE awards, Tulsa Ports rail projects, passenger rail chapter and the 107-project Rail Service and Investment Program. A draft, not an adopted plan (published 2026-06 · checked 2026-10-08)
  • ● Ohio Rail Development Commission (official) · Commission meeting packet, 19 March 2026 — agenda, minutes, Resolutions 26-01 to 26-09, Fiscal Year 2026 Budget Projection (3/11/2026), Executive Director's report (Panhandle Line lease request, grade-separation staff sponsorship, Glass Rock Line, status of awarded federal grants) (bytes: 4,731,030) (published 2026-03-19 · checked 2026-09-19)
  • ○ Progressive Railroading: other CRISI short-line awards by state (12 November 2024) · Trade-press list quoting the FRA CRISI report: Kiamichi Railroad Co. $56.6 million and Stillwater Central Railroad $29.4 million, with project scopes. Secondary: the FRA's CRISI selection page (railroads.dot.gov) returns 403 (published 2024-11-12 · checked 2026-10-08)
  • ● Quonset Development Corporation, rail infrastructure upgrades · Release of 15 July 2024: Seaview Engine House, Mill Creek Railyard, Davisville Main Connector; CRISI grant; Seaview carload volume (published 2024-07-15 · checked 2026-10-08)
  • ● Office of Rep. James E. Clyburn · Release of 10 January 2025: USDOT/FRA Rail Crossing Elimination Grant Program awards of $204.2 million for the Assembly Street Railroad Project in Columbia and $940,000 for Rivers Avenue grade separation planning in North Charleston. FRA's own selections PDF returns 403. (published 2025-01-10 · checked 2026-10-08)
  • ● FRA · FRA FY 2023-2024 CRISI Grant Program: Project Summaries, 29 October 2024 (fra.dot.gov returns 403 to curl; read from the Internet Archive copy): South Carolina - Piedmont Regional Rail Capacity Improvement Project, up to $27,423,985, applicant Chester County, Lancaster and Chester Railroad and Norfolk Southern to contribute the 20 per cent non-federal match. (published 2024-10-29 · checked 2026-10-08)
  • ○ SCBIZ · 'Columbia receives $204M in federal funding for railroad improvements', 16 January 2025 (Secondary): City of Columbia, Railroad Crossing Elimination Grant Program, Assembly Street Railroad Separation Project, 20 per cent non-federal match from the city, Richland County and SCDOT. (published 2025-01-16 · checked 2026-10-08)
  • ○ SCBIZ · Trade press (Secondary; FRA's own selection page returns HTTP 403): Chester County awarded more than $27.4 million under CRISI for the Piedmont Regional Rail Capacity Improvement Project with Lancaster & Chester Railroad and Norfolk Southern, 7 November 2024. (published 2024-11-07 · checked 2026-10-08)
  • ● SCDOT / FRA · South Carolina Statewide Rail Plan 2024 (Cambridge Systematics for SCDOT, November 2024) bound with the FRA acceptance letter of 8 May 2025: funding sources, projects under construction (Table 4-2), unfunded needs (Tables 4-3, 4-7, 5-1), Palmetto Railways profile, CRISI, INFRA and BUILD awards. Read 8 October 2026. (published 2025-05-08 · checked 2026-10-08)
  • ● USAspending.gov (FRA award record) · FRA INFRA award 69A36524420000INFSC to SC Public Railway: $25,000,000 federal, $183,570,000 non-federal, $208,570,000 total funding; 23-mile industrial rail line from Camp Hall Commerce Park to CSX; signed 25 January 2024; period 1 November 2023 to 31 August 2026. (published 2024-01-25 · checked 2026-10-08)
  • ● USAspending.gov (FRA award record) · FRA CRISI award 69A36520501390CRSSC to Lancaster & Chester Railroad, LLC for the South Carolina Piedmont Freight Rail Service Improvement Program: $8,750,998.98 federal, $13,463,075.97 total funding; signed 13 May 2020; period 1 May 2020 to 31 October 2022. (published 2020-05-13 · checked 2026-10-08)
  • ● USAspending award 69A36525422720CRSSD · FRA CRISI grant to SDDOT for ties, ballast, surfacing, culvert and bridge work from Chamberlain to Presho; railroad not named in the description: federal $8,310,932, non-federal $2,077,733, total $10,388,665; signed 2025-09-19; period 2025-07-01 to 2029-02-28 (published 2025-09-19 · checked 2026-10-08)
  • ● USAspending award 69A36526422740CRSSD · FRA CRISI Special Transportation Circumstances grant to SDDOT for the Dakota, Minnesota Valley & Western Britton line: federal $17,600,361, non-federal $4,400,090, total $22,000,451; signed 2025-12-23; period 2025-10-01 to 2029-03-31 (published 2025-12-23 · checked 2026-10-08)
  • ● USAspending award 69A36525422730CRSSD · FRA CRISI grant to SDDOT for track and bridge work on a Rapid City, Pierre & Eastern segment: federal $14,062,328, non-federal $6,026,712, total $20,089,040; signed 2025-09-19; period 2025-08-01 to 2029-04-30 (published 2025-09-19 · checked 2026-10-08)
  • ● USAspending award 69A36526420960CRSSD · FRA CRISI grant to SDDOT titled Sisseton Milbank Railroad Modernization Project: federal $24,712,204, non-federal $6,239,956, total $30,952,160; signed 2025-12-15; period 2025-10-01 to 2029-10-31 (published 2025-12-15 · checked 2026-10-08)
  • ● USAspending award 69A36526422750CRSSD · FRA CRISI Special Transportation Circumstances grant to SDDOT to replace about 11.84 miles of jointed main-line rail and upgrade about 17 crossings; railroad not named in the description: federal $9,957,246, non-federal $2,489,312, total $12,446,558; signed 2025-12-02; period 2025-12-01 to 2028-09-30 (published 2025-12-02 · checked 2026-10-08)
  • ● USAspending award 69A36524420060RASSD · FRA National Infrastructure Investments (assistance listing 20.933) award to SDDOT for the Rapid City, Pierre & Eastern Pierre to Rapid City upgrade: federal $22,000,000, non-federal $62,000,000, total $84,000,000; outlays $21,574,622.55; signed 2024-09-06; period 2024-06-03 to 2027-12-31 (published 2024-09-06 · checked 2026-10-08)
  • ○ US Senate office release on Nebraska Railroad Crossing Elimination awards (15 January 2025) · Release listing three FRA Railroad Crossing Elimination awards totalling about $67.9m: 33rd/Cornhusker Viaduct in Lincoln $66,706,880, and $600,000 each for the Grand Island and Omaha to Lincoln studies. Secondary: railroads.dot.gov returns 403 (published 2025-01-15 · checked 2026-10-08)
  • ○ AJOT — Federal Railroad Administration presents $23.7M Grant to TDOT · Trade-press reprint of TDOT's release of 28 September 2023 (AJOT, 29 September 2023): $23.7 million CRISI grant, 42 bridges on 10 short lines in 12 counties, 50 per cent short line match. TDOT's own release and the FRA remarks could not be read (tn.gov returns 404 after a site reorganisation; railroads.dot.gov returns 403) (published 2023-09-29 · checked 2026-10-07)
  • ● FRA - Remarks for the Administrator, Tennessee CRISI Selections Event, Short Line Railroads Bridge Bundle Project (28 September 2023; Internet Archive copy) · FRA remarks formally announcing more than $23.7 million to TDOT for the Tennessee Short Line Railroads Bridge Bundle Project; more than 40 bridges, 10 short line railroads, 12 counties (published 2023-09-28 · checked 2026-10-07)
  • ● TDOT - Federal Railroad Administration Presents $23.7M Grant to TDOT (news release, 28 September 2023; Internet Archive copy of 10 October 2023) · TDOT release: $23.7 million CRISI grant, 42 rail bridges, 10 short lines, 12 counties, TDOT lead applicant and grant manager; the original tn.gov URL now returns 404 (published 2023-09-28 · checked 2026-10-07)
  • ● USAspending.gov — FRA CRISI award 69A36524421220CRSNJ, TennKen Railroad Co., Inc. · Federal award record: $7,370,000 federal, $11,000,000 total funding, signed 27 August 2024, performance 1 September 2024 to 30 April 2026; replace about five miles of rail and 53,500 ties and surface 42.6 miles on the TennKen mainline; place of performance recorded as multi-state (published 2024-08-27 · checked 2026-10-07)
  • ● USAspending.gov award FR-HSR-0101-12, FRA to NHDOT, New Hampshire Capital Corridor Planning · FRA planning grant 2011 to 2015 for the Capital Corridor study; federal obligation and non-federal share (published 2011-10-25 · checked 2026-10-08)
  • ● USAspending award 69A36525420740CRSIA (FRA CRISI to CRANDIC) · FRA CRISI award for the UP overhead bridge: federal $2,978,015, total $5,956,030; signed 2 January 2025 (below the floor) (published 2025-01-02 · checked 2026-10-08)
  • ● USAspending award 69A36525422060CRSIA (FRA CRISI to CRANDIC) · FRA CRISI award: final design and construction for tie replacement along 56 miles of main line, raising track class 1 to 2; federal $19,040,000, non-federal $4,760,000, total $23,800,000; signed 6 August 2025; period 1 June 2025 to 31 March 2027 (published 2025-08-06 · checked 2026-10-08)
  • ● USAspending award 69A36526420600CRSIA (FRA CRISI to CRANDIC) · FRA CRISI award for the Streamline Rail Operations and Improve Yard Safety in Cedar Rapids project: federal $5,850,000, non-federal $5,850,000, total $11,700,000; signed 8 December 2025; period 1 October 2025 to 31 August 2027 (published 2025-12-08 · checked 2026-10-08)
  • ● USAspending: CRISI award to KDOT, Cimarron Valley Railroad · Award 69A36523420050CRSKS, $10,991,971 federal obligation, non-federal funding $4,000,000, 1 April 2023 to 31 January 2026; crossties, welds, rail, ballast and surfacing from Dodge City to Hugoton (published 2023-04-18 · checked 2026-10-08)
  • ● USAspending: FRA CRISI award 69A36522403340CRSMS to Grenada Railroad LLC · Award record, assistance listing 20.325: $5,496,893.73 federal, non-federal $5,496,893.75, total $10,993,787.48, signed 25 April 2022, period 1 April 2022 to 31 August 2023, last modified 15 April 2024; scope text gives only the objective of improving railroad operations and safety (published 2024-04-15 · checked 2026-10-08)
  • ● USAspending: FRA CRISI award 69A36523420180CRSMS to the City of Hattiesburg · Award record, assistance listing 20.325: $5,397,300 federal, non-federal $19,891,642, total $25,288,942, signed 8 August 2023, period 1 July 2023 to 31 January 2028; final design and construction of the Hall Avenue East improvements including an overpass of the Canadian National line, a rail spur in the Norfolk Southern yard and dynamic message signs (published 2023-08-21 · checked 2026-10-08)
  • ● USAspending: FRA award 69A36525420130CCDMS to Hancock County Port & Harbor Commission (Port Bienville rail yard) · Award record, assistance listing 20.325: $7,320,000 federal, no non-federal funding recorded, signed 11 June 2025, period 1 June 2025 to 30 August 2028; scope an eight-track classification yard and a 3,500-linear-foot intermodal switch lead at Port Bienville Industrial Park, Hancock County, with capacity for 235 railcars (published 2025-06-23 · checked 2026-10-08)
  • ● USAspending award 69A36523403720CRSIA (FRA CRISI to Iowa Northern) · FRA CRISI award: replace jointed rail with new 115-pound continuous welded rail on a 27.3 mile main line segment to lift it from FRA Class 1 and 2 to Class 3; federal $7,173,452, non-federal $7,173,452, total $14,346,904; signed 25 January 2023; period 15 October 2022 to 31 October 2024 (published 2023-01-25 · checked 2026-10-08)
  • ● USAspending: FRA Corridor ID award to KDOT (Heartland Flyer corridor) · Award 69A36524520390FSPKS, $500,000, assistance listing 20.326, 8 April 2024 to 31 October 2026; scope names Edmond, Perry and Ponca City, Oklahoma and Arkansas City, Wichita and Newton, Kansas (published 2024-05-14 · checked 2026-10-08)
  • ● USAspending award 69A36523403770CRSOK (FRA CRISI, ODOT) · FRA CRISI award to ODOT of $10,006,289 signed 13 December 2022 for the Kiamichi Railroad network in Texas, Arkansas and Oklahoma; period of performance to 30 April 2027 (published 2022-12-13 · checked 2026-10-08)
  • ● USAspending: CRISI award to KDOT, Kyle Railroad Concordia Subdivision · Award 69A36523420150CRSKS, $9,367,113 federal obligation, non-federal funding $10,367,112, 1 June 2023 to 31 July 2027; 23.5 miles of 115-lb continuous welded rail between Beloit and Yuma Junction (published 2023-06-08 · checked 2026-10-08)
  • ● USAspending award 69A36525421410CRSNE · FRA grant to Manning Rail, Inc. (Fairmont, Fillmore County) to upgrade a line for grain shuttle trains; federal $5,433,342 with non-federal $1,822,834; signed 23 September 2025; performance to 30 April 2028 (published 2025-09-29 · checked 2026-10-08)
  • ● USAspending: FRA CRISI award 69A36526422570CRSUT to Natchez Railway Inc · Award record, assistance listing 20.337: $7,734,717 federal, non-federal $2,310,369, total $10,045,086, signed 13 January 2026, period 1 October 2025 to 31 May 2027; Natchez Railway infrastructure, grade crossing and rail line improvement project, place of performance given as Mississippi; recipient address in Salt Lake City (published 2026-01-20 · checked 2026-10-08)
  • ● USAspending award 69A36520401460CRSNE · FRA CRISI-line project grant to Nebraska Central Railroad Company, NCRC infrastructure improvements project; federal $8,181,640 with non-federal $6,694,069; performance 1 May 2020 to 31 July 2027 (published 2026-02-17 · checked 2026-10-08)
  • ● USAspending award 69A36524420300CRSNE · FRA grant to Nebraska Central Railroad Company for four rail sidings; federal $6,317,982 with non-federal $4,390,462; signed 6 March 2024; performance to 31 October 2026; track leased from Union Pacific (published 2024-03-18 · checked 2026-10-08)
  • ● USAspending award 69A36526421850RCENE · FRA Railroad Crossing Elimination planning grant to NDOT for the Grand Island rail crossing study; federal $600,000 with non-federal $150,000; signed 1 December 2025 (published 2025-12-08 · checked 2026-10-08)
  • ● USAspending award 69A36521402470FSPRI · FRA Federal-State Partnership (State of Good Repair) award to Rhode Island DOT, Providence Station State of Good Repair and Capacity Project, 2020-08-01 to 2027-03-31 (published 2024-05-13 · checked 2026-10-08)
  • ● USAspending award 69A36520401580CRSRI · FRA CRISI award to Quonset Development Corp, Quonset Freight Rail Enhancements and Expansion (Q-FREE), 2020-07-01 to 2023-12-31 (published 2024-04-29 · checked 2026-10-08)
  • ● USAspending: FRA CRISI award 69A36526220160CCDMS to Rosedale-Bolivar County Port Commission (Great River Railroad) · Award record, assistance listing 20.337: $8,175,000 federal, non-federal $2,661,259, total $10,836,259, signed 20 February 2026, period 1 November 2025 to 31 October 2028; Port of Rosedale multimodal expansion, Great River Railroad restoration project (published 2026-03-02 · checked 2026-10-08)
  • ● USAspending: CRISI award to KDOT, South Kansas and Oklahoma Railroad Rehabilitation Project · Award 69A36521402770CRSKS, $29,570,583 federal obligation, non-federal funding $13,627,880, total funding $43,198,463, signed 3 June 2021, 1 May 2021 to 31 October 2026 (record last modified 26 May 2026) (published 2021-06-03 · checked 2026-10-08)
  • ● USAspending: Railroad Crossing Elimination award, City of Wellington · Award 69A36526420340RCEKS, $8,864,725 federal obligation, non-federal funding $5,001,000, signed 15 January 2026, 1 October 2025 to 31 October 2029; Wellington Sealed Corridor Project (published 2026-01-15 · checked 2026-10-08)
  • ● US Department of Transportation · Operating administrations (checked 2026-09-06)
  • ● USAspending.gov — FRA Railroad Crossing Elimination grant 69A36525420610RCEUT, Utah Department of Transportation · Federal award record: $7,502,400, 20.327 Railroad Crossing Elimination, period 1 May 2025 to 28 February 2029; development activities for a future project to consolidate two rail corridors into one, abandon 7 miles of line and discontinue 19 rail crossings in central Utah, on Union Pacific's Provo Subdivision through Spanish Fork, Mapleton and Springville (published 2025-05-01 · checked 2026-10-07)
  • ● VTrans federal competitive grants awarded 2018-2023 (as of 2 January 2024) · VTrans table submitted to the Senate Transportation Committee on 5 January 2024: BUILD, RAISE, CRISI, Corridor ID and annual rail appropriation lines (published 2024-01-05 · checked 2026-10-08)
  • ● USAspending: FRA record 69A36520401930BLDVT to VTrans · Federal award record for the Vermont Regional Freight Rail Corridor Upgrade Project: obligation, non-federal funding and period of performance to 31 October 2026 (published 2020-09-03 · checked 2026-10-08)
  • ● USAspending: FRA CRISI award 69A36526421980CRSNY to New England Central Railroad · Federal award record: $19,524,497 obligation, signed 27 January 2026, period 1 December 2025 to 31 August 2029, multi-state place of performance (Vermont, Massachusetts, Rhode Island) (published 2026-01-27 · checked 2026-10-08)
  • ● USAspending award search - Federal Railroad Administration awards to Vermont recipients and places · Search of FRA awards with a Vermont recipient or place of performance (CRISI, Corridor ID, BUILD-coded and older TIGER and high-speed rail records), read 8 October 2026 (published 2026-10-08 · checked 2026-10-08)
  • ● Amtrak Media · Amtrak Receives Federal Grants to Improve Chicago Service and Support Partner Projects across the Midwest, 31 October 2024: lists the Muskego Yard Bypass Project (up to $72,800,000, Wisconsin Department of Transportation) among the FRA CRISI grants Amtrak supported. (published 2024-10-31 · checked 2026-10-07)
  • ○ U.S. Senator for Wisconsin (press office) · Press release of 28 October 2024 announcing $72.8 million in federal funding for the Muskego Yard Bypass Project, with WisDOT's statement on the new two-track mainline. Secondary: the FRA's own selection page (railroads.dot.gov) returns HTTP 403 to automated clients. (published 2024-10-28 · checked 2026-10-07)
  • ● WisDOT · Merrimac Bridge Rehabilitation Project page: Reedsburg Subdivision owned by WisDOT and the Wisconsin River Rail Transit Commission and operated by Wisconsin & Southern Railroad under an operating agreement with the Commission; Phase III INFRA grant $6,750,000; lowest bidder Michels Construction $21,695,000 in November 2022; Phase III total cost $22,169,000; funding split; timeline to 2025. Read 7 October 2026. (checked 2026-10-07)
  • ● WisDOT · Twin Cities-Milwaukee-Chicago (TCMC) Intercity Passenger Rail Infrastructure Project page: Borealis start 21 May 2024, $53 million project, $31.8 million CRISI grant of September 2020, $12.6 million Restoration and Enhancement grant of May 2020, construction anticipated 2025 to 2027, La Crosse works list. Read 7 October 2026. (checked 2026-10-07)
  • ● Office of the Governor of Wisconsin · Press release of 19 August 2026: over $140 million from the FRA National Railroad Partnership Program to overhaul up to 41 Charger locomotives serving the Hiawatha and eight other routes; WisDOT applied in partnership with Amtrak and the Illinois, Michigan, Missouri, Oregon and Washington transportation departments; Wisconsin also co-applicant on a project that received over $45 million for onboard shunt devices. (published 2026-08-19 · checked 2026-10-07)
  • ● USAspending.gov (FRA award record) · Federal award 69A36520402040FSPWI to the Wisconsin Department of Transportation, Federal-State Partnership for Intercity Passenger Rail, Next Generation single-level coach and cab-coach equipment acquisition: $25,716,900 federal, $13,248,100 non-federal, $38,965,000 total funding; signed 15 September 2020; period to 30 June 2027. (published 2020-09-21 · checked 2026-10-07)
  • ● USAspending.gov (FRA award record) · Railroad Crossing Elimination award 69A36525420460RCEWI to the City of Eau Claire: eliminates two at-grade crossings at Galloway Street and the Union Pacific line with an overpass linking the Chippewa River trail; $9,999,600 federal, $2,499,900 non-federal, $12,499,500 total funding; signed 23 July 2025; period 1 July 2025 to 31 January 2029. (published 2025-08-04 · checked 2026-10-08)
  • ● USAspending.gov (FRA award record) · INFRA award 69A36522403220INFWI to the Wisconsin Department of Transportation for Merrimac Bridge Phase III: $6,750,000 federal, $6,750,000 non-federal, $13,500,000 total funding on the federal record; signed 25 January 2022; period 1 January 2022 to 30 June 2026. (published 2022-02-07 · checked 2026-10-08)
  • ● USAspending.gov (FRA award record) · Federal award 69A36522403260CRSWI to the Wisconsin Department of Transportation, Consolidated Rail Infrastructure and Safety Improvements: $31,800,000 federal, $21,200,000 non-federal, $53,000,000 total funding; signed 2 March 2022; period to 31 July 2029. FRA's own page returns HTTP 403. (published 2025-12-22 · checked 2026-10-07)
  • ○ WIBW: Two Kansas railroad companies awarded $47 million in federal funding · Television report of the Governor's 3 October 2023 announcement of CRISI awards of up to $15,740,943 to Watco (eight battery locomotives, 20% match) and up to $31,225,484 to the South Kansas & Oklahoma Railroad Neodesha Subdivision (about 37 miles of track; KDOT and SKOL 20% match). Secondary because the Governor's release returns 403 (published 2023-10-03 · checked 2026-10-08)
  • ● Appalachian & Ohio Railroad news release, FY2022 CRISI award · The grantee's own release: award over 19.4 million dollars toward a project costing over 35.3 million dollars, minimum railroad contribution 15.9 million dollars, nine tunnels, ties and rail, six locomotives; the release file path is dated October 2023 (published 2023-10 · checked 2026-10-08)
  • ○ Senator Capito's office, grant funding for two West Virginia railway projects, 25 October 2024 · Congressional release naming two CRISI awards: Winchester & Western Railroad Acquisition, LLC and Cathcart Rail, LLC (Belpre Industrial Parkersburg Railroad), with amounts and project scope. Secondary: the FRA's own award table was not reachable (403) (published 2024-10-25 · checked 2026-10-08)
  • ○ WDTV, federal grant funds rail tunnel repairs near Abbott, 18 August 2026 · Local television report of the groundbreaking at Abbott Tunnel: 19.44 million dollar FY2022 CRISI grant, final design approved, competitive bidding next, nine tunnels in 12 to 18 months. Secondary (published 2026-08-18 · checked 2026-10-08)
  • ● USAspending award 69A36526422700CRSWY · FRA CRISI Special Transportation Circumstances award to Wyoming Department of Transportation for the College Drive overpass at the BNSF crossing, Cheyenne: federal 38,683,896, non-federal 9,670,974, signed 19 December 2025, performance to 30 November 2037 (published 2025-12-19 · checked 2026-10-08)
  • ● USAspending award 69A36526420520CRSWY · FRA CRISI Special Transportation Circumstances award to Wyoming Department of Transportation to replace two fracture-critical grade-separated crossings, Cheyenne area: federal 22,222,382, non-federal 5,555,595, signed 19 December 2025, performance to 31 March 2032 (published 2025-12-19 · checked 2026-10-08)

Withheld in the free surface

  • Procurement structure
  • Award history (1)
  • Entry path
  • Portals (1)

Full detail withheld: 4 fields. In the United States edition · See a fully open example

1 source · primary

Browse: the Atlas · United States · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.