Utah Department of Transportation
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Type
- State DOT — State highway and transportation department; leads the FrontRunner 2X project with UTA and Union Pacific and is the recipient of Federal Railroad Administration crossing-elimination funding. Posts its solicitations on the State of Utah Bonfire portal.
- Market · Region
- United States · Utah
- Open tenders
- 0
- Technology areas
- Track & civil, Signalling & train control, Rolling-stock hardware
Leads FrontRunner 2X with UTA and holds FRA crossing-elimination money for Utah County rail consolidation.
About this buyer
Read more
Project lead on FrontRunner 2X, 26.1 miles of new double track at 11 locations, one new station, 10 trainsets and a new maintenance facility, which the FTA admitted to the Engineering phase of the Capital Investment Grants programme on 7 August 2026. UDOT is the FRA's grantee for development work on consolidating two Union Pacific corridors in Utah County, abandoning 7 miles of line and closing 19 crossings, and is designing the Sharp-Tintic connection between Union Pacific lines in Springville and Spanish Fork. It jointly administers construction of the Salt Lake, Garfield & Western West Interchange with Patriot Rail.
- Type
- State DOT — State highway and transportation department; leads the FrontRunner 2X project with UTA and Union Pacific and is the recipient of Federal Railroad Administration crossing-elimination funding. Posts its solicitations on the State of Utah Bonfire portal.
- Where
- Utah · Salt Lake City
- Programmes
- IIJA / Bipartisan Infrastructure Law
- Technology areas
- Track & civil, Signalling & train control, Rolling-stock hardware
Structure
- funded by FTA — Capital Investment Grants Engineering phase for FrontRunner 2X from 7 August 2026; FTA federal funding ceiling (40% of a project cost), no full funding grant agreement yet (pending)
- funded by FRA — Railroad Crossing Elimination grant 69A36525420610RCEUT, Central Utah Rail Corridor Consolidation development work (1 May 2025 to 28 February 2029) (active)
Who holds what here
- awarded Stacy Witbeck — FrontRunner 2X progressive design-build, as a member of the FrontRunner Forward Partners joint venture with Ralph L. Wadsworth (active · since 2026-02)
- Contract detail and values (3)over $1bn · $5–25mIn the United States edition See a fully open example
Sources for these relationships (6)
- ○ Mass Transit (trade press) — UTA selects STV to support FrontRunner 2X project · Secondary: 11 February 2026 report that STV leads the double-track design for two segments between the Vineyard, Provo and Orem stations; project described as nearly $1 billion; 89-mile corridor; a new Bluffdale station (published 2026-02-11 · checked 2026-10-07)
- ○ Progressive Railroading (trade press) — FTA OKs engineering phase start on double-track project in Utah · Secondary, used because the FTA project page returns HTTP 403: dated 11 August 2026, reports the FTA announced on 7 August 2026 a commitment of $1.28 billion; 26.1 miles of double track; construction 2027 through 2030; next step design, early procurement and a full funding grant agreement (published 2026-08-11 · checked 2026-10-07)
- ○ Railway Supply (trade press) - Utah sought 74% but FTA caps its FrontRunner 2X grant at 40% of cost · Secondary, 28 September 2026, reporting FTA's August 2026 engineering profile (the FTA page returns HTTP 403 to automated clients): FTA ceiling $1,286,611,600, 40% of a $3.22 billion project cost; UDOT as project sponsor; Utah's plan sought $2.38 billion (74%) (published 2026-09-28 · checked 2026-10-07)
- ○ STV (contractor announcement) — STV joins progressive design-build team for UTA FrontRunner rail expansion · Secondary, a firm's own announcement of 10 February 2026: FrontRunner 2X described as a nearly $1 billion project led by UDOT with UTA and Union Pacific; STV is a subconsultant to Horrocks Engineers, the lead progressive design-build engineer; Horrocks is part of FrontRunner Forward Partners, a joint venture of Stacy Witbeck and Ralph L. Wadsworth; construction in phases through 2030 (published 2026-02-10 · checked 2026-10-07)
- ● Utah Department of Transportation (official) — FrontRunner 2X advances to final phase of process for nearly $1.3 billion federal grant · UDOT release of 7 August 2026: FTA approved FrontRunner 2X to enter the Engineering phase of the Capital Investment Grants programme; 26.1 miles of double track at 11 locations, one new station, 10 trainsets, a new maintenance facility; construction anticipated 2027 to 2030 subject to the federal grant process; next step a Full Funding Grant Agreement (published 2026-08-07 · checked 2026-10-07)
- ● USAspending.gov — FRA Railroad Crossing Elimination grant 69A36525420610RCEUT, Utah Department of Transportation · Federal award record: $7,502,400, 20.327 Railroad Crossing Elimination, period 1 May 2025 to 28 February 2029; development activities for a future project to consolidate two rail corridors into one, abandon 7 miles of line and discontinue 19 rail crossings in central Utah, on Union Pacific's Provo Subdivision through Spanish Fork, Mapleton and Springville (published 2025-05-01 · checked 2026-10-07)
Tenders
| Tender | Status | Value band | Next key date |
|---|---|---|---|
| FrontRunner 2X ten trainsets | Bids closed | $100–500m | |
| FrontRunner 2X progressive design-build team | Awarded | value not published | |
| Central Utah rail corridor consolidation | In execution | $5–25m | |
| FrontRunner 2X double-track programme | Planned | over $1bn |
Withheld in the free surface
- Procurement structure
- Published contacts (2)
- Award history (4)
- Entry path
Full detail withheld: 4 fields. In the United States edition · See a fully open example
9 sources · 6 primary
- ● State of Utah Bonfire portal (utah.bonfirehub.com) — open public opportunities, JSON · getOpenPublicOpportunitiesSectionData: the open list for all Utah public buyers; UTA is department 11708 and UDOT department 11742; no rail capital solicitation from UTA, UDOT or the Utah Inland Port Authority was open on 7 October 2026 (published 2026-10-07 · checked 2026-10-07)
- ● FrontRunner 2X project site (UDOT and UTA) · Project site: double tracking at 11 locations, one new station, 10 new trainsets, 15-minute peak and 30-minute off-peak service goal; schedule 2025-2026 design, preconstruction and train procurement, 2027-2030 construction; schedule depends on federal grants; no cost, awarded contract or trainset award stated on the page (published 2026 · checked 2026-10-07)
- ● Utah Department of Transportation (official) — FrontRunner 2X advances to final phase of process for nearly $1.3 billion federal grant · UDOT release of 7 August 2026: FTA approved FrontRunner 2X to enter the Engineering phase of the Capital Investment Grants programme; 26.1 miles of double track at 11 locations, one new station, 10 trainsets, a new maintenance facility; construction anticipated 2027 to 2030 subject to the federal grant process; next step a Full Funding Grant Agreement (published 2026-08-07 · checked 2026-10-07)
- ○ STV (contractor announcement) — STV joins progressive design-build team for UTA FrontRunner rail expansion · Secondary, a firm's own announcement of 10 February 2026: FrontRunner 2X described as a nearly $1 billion project led by UDOT with UTA and Union Pacific; STV is a subconsultant to Horrocks Engineers, the lead progressive design-build engineer; Horrocks is part of FrontRunner Forward Partners, a joint venture of Stacy Witbeck and Ralph L. Wadsworth; construction in phases through 2030 (published 2026-02-10 · checked 2026-10-07)
- ● USAspending.gov — FRA Railroad Crossing Elimination grant 69A36525420610RCEUT, Utah Department of Transportation · Federal award record: $7,502,400, 20.327 Railroad Crossing Elimination, period 1 May 2025 to 28 February 2029; development activities for a future project to consolidate two rail corridors into one, abandon 7 miles of line and discontinue 19 rail crossings in central Utah, on Union Pacific's Provo Subdivision through Spanish Fork, Mapleton and Springville (published 2025-05-01 · checked 2026-10-07)
- ● Utah Department of Transportation (official) — Sharp-Tintic Connection project · Project page: connects Union Pacific's Sharp and Tintic lines in Springville and Spanish Fork, nearly 4,000 feet of new track owned by UTA and operated by UPRR; removes track at seven at-grade crossings; environmental clearance fall 2025, design fall 2025 to fall 2027, construction anticipated 2028 to 2029; cost, funding and contractor not stated (published 2026 · checked 2026-10-07)
- ● Utah Inland Port Authority (official) — Utah DOT and Patriot Rail's Salt Lake, Garfield & Western Railway break ground on new West Interchange · Release of 17 July 2026 hosted by the Utah Inland Port Authority: a project of about $31 million to move switching from the East Yard to a new site south of I-80 and Salt Lake City Airport; FRA grant above $13 million, Patriot Rail above $17 million, the Utah Inland Port Authority $500,000 on behalf of the State; UDOT and Patriot Rail jointly administer construction (published 2026-07-17 · checked 2026-10-07)
- ○ Salt Lake Tribune (press) - Utah's FrontRunner: New trains to be built in Salt Lake City by Stadler, records show · Secondary, 20 July 2026, from public records: Stadler proposed $328.3 million for the FrontRunner vehicles, was the only bidder, committee found pricing fair and reasonable; UDOT says the contract is not finalised (published 2026-07-20 · checked 2026-10-07)
- ○ HigherGov (aggregator of the Utah state record) - UDOT RFP UDOT/UTA FrontRunner Train Sets Acquisition UDOT250192MP · Secondary mirror of the State of Utah solicitation: ten DMUs as a base order with up to forty options; issued by UDOT and UTA jointly; issued 1 July 2025, due 10 October 2025 (published 2025-07-01 · checked 2026-10-07)