Buyer · National operator
? How to use this page

How to use a buyer page

  1. Who this buyer is, then who already holds positions here and what it is tendering.
  2. Click Watch and every change lands in your weekly digest.
  3. How to sell here — the route in, thresholds, portals and contacts — opens with this market's edition.

National Railroad Passenger Corporation (Amtrak)

This week: Amtrak marks a milestone in the transformation of Philadelphia's 30th Street Station. (2026-11-16)

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Type
National operator — federally chartered national passenger operator; owner of most of the Northeast Corridor
Market · Region
United States
Open tenders
2
Technology areas
Rolling-stock hardware, Predictive maintenance, Digital operations, Track & civil, Electrification, Signalling & train control, Cybersecurity

Operated 34.5 million passenger trips in FY2025 with record capital investment in new fleets and NEC infrastructure.

About this buyer

Read more

Carried a record 34.5 million passengers in FY2025, with record ticket revenue and record capital investment — new Airo and Acela fleets, NEC bridges and tunnels.

Type
National operator — federally chartered national passenger operator; owner of most of the Northeast Corridor
Programmes
Northeast Corridor, IIJA / Bipartisan Infrastructure Law, FRA Federal-State Partnership for Intercity Passenger Rail
Technology areas
Rolling-stock hardware, Predictive maintenance, Digital operations, Track & civil, Electrification, Signalling & train control, Cybersecurity

Structure

  • funded by NJ TRANSIT — Co-funder, with PATH and Amtrak, of the part of the Dock Bridge rehabilitation not covered by the Federal Railroad Administration grant (active · since 2026-07)
  • funded by MDOT MTA — MTA's commitments to Amtrak-led Northeast Corridor projects in Maryland and to MARC service on the Amtrak-owned Penn Line (active · since 2026)
  • operates for VPRA — Operator of Amtrak Virginia state-supported service under the PRIIA section 209 State Supported Agreement (active · since 2025-10-01)
  • owned by USDOT — Holder of all issued and outstanding preferred stock; selects board members (active)
  • funded by FRA — Annual federal grant agreements administered by the FRA (active)
  • funded by MassDOT — State-supported Amtrak services in Massachusetts under the Compass Rail programme (active)
  • operates for WSDOT — Operator of Amtrak Cascades under contract to the sponsoring states (active)
  • operates for ODOT Rail and Public Transit — Operator of the Amtrak Cascades service under operating and intergovernmental agreements with ODOT and WSDOT, holding the contractual rights to run over BNSF Railway, Canadian National and Union Pacific lines (active)
  • operates for NCDOT Rail Division — Operator of the state-supported Piedmont and Carolinian passenger services on the NCRR corridor, funded by NCDOT's Rail Division (active)
  • operates for MDOT Office of Rail — Operates the Wolverine, Blue Water and Pere Marquette services under contract with MDOT, which covers costs not met by revenue; manages access and construction on the Kalamazoo-Dearborn line (active)
  • operates for MoDOT — Operates the Missouri River Runner between St. Louis and Kansas City for MoDOT, two daily round trips (active)
  • operates for WisDOT — Operates the Hiawatha Service between Chicago and Milwaukee, and the Borealis between Chicago and St. Paul with the Minnesota and Illinois departments (active)
  • operates for NMDOT — Southwest Chief over NMDOT track from Isleta to CP Madrid and Lamy; Amtrak is the only user of the 24 miles between Lamy and CP Madrid (active)
  • operates for RIDOT — Owns the Northeast Corridor and Providence Station; RIDOT pays Amtrak a share of corridor operating costs under an access agreement and partners with it on the station renovation (active)
  • operates for NNEPRA — Runs the Downeaster: provides train equipment, onboard crews, turnaround servicing and ticketing under a multi-year service agreement with NNEPRA (active)
  • operates for ODOT — Operates the Heartland Flyer between Oklahoma City and Fort Worth under contract to Oklahoma and Texas (active)
  • operates for VTrans Rail — Runs the Vermonter and the Ethan Allen Express as state-supported services paid for by VTrans; the Ethan Allen Express is also supported by New York (active)

Who holds what here

  • awarded Alstom — NextGen Acela high-speed trainsets, 28 units built at Hornell NY (active · since 2025-08-28)
  • awarded Clark — Ivy City Yard design-build, Clark-Herzog joint venture (active · since 2025-08-19)
  • awarded Herzog — Ivy City Yard design-build, Clark-Herzog joint venture (active · since 2025-08-19)
  • awarded PCL — King Street Yard maintenance facility design and construction (active · since 2024-10-02)
  • awarded Tutor Perini — Connecticut River Bridge construction, O&G/Tutor Perini joint venture (active · since 2024-06-28)
  • awarded Siemens Mobility — Airo trainset order, up to 83 trainsets with parts supply and service (active · since 2021-07-07)
  • supplied by SDI — Approved standard rail supplier (active)
  • supplies SEPTA — Trackage rights and property leases on Amtrak-owned Keystone East and Northeast Corridor track used by SEPTA Regional Rail (active)
  • supplies Sound Transit — Maintenance of the Sounder locomotive and passenger car fleet at Holgate yard, Seattle (active)
Sources for these relationships (43)
  • ● Amtrak (media centre) · Amtrak NextGen Acela Debuts on August 28 (published 2025-08-07 · checked 2026-10-07)
  • ● Amtrak (corporate site) · The Next Generation of Acela: 28 trains, part of a $2.45 billion NEC investment, built at Hornell, NY (checked 2026-10-07)
  • ● Amtrak (media centre) · Amtrak to Transform Rail Travel with $7.3 Billion Investment in State-of-the-Art Equipment (published 2021-07-07 · checked 2026-10-07)
  • ● Amtrak (media centre) · A New Era Arrives: Airo Trains Make Their Amtrak Cascades Debut (published 2026-09-30 · checked 2026-10-07)
  • ● Amtrak (media centre) · Amtrak Awards Contract to Build New Connecticut River Bridge (published 2024-06-28 · checked 2026-10-07)
  • ● Amtrak · Audited consolidated financial statements FY2024 (preferred stock held by the DOT; FRA grant agreements) (published 2025 · checked 2026-09-06)
  • ● Amtrak (media centre) · Amtrak Advances Major Rail Yard Upgrades in Seattle (published 2024-10-02 · checked 2026-10-07)
  • ● Amtrak (media centre) · Amtrak Advances Three Major East Coast Rail Yard Modernization Projects (published 2025-08-19 · checked 2026-10-07)
  • ● Amtrak (media centre) · Amtrak's Berkshire Flyer Returns for Summer Service with Expanded Weekend Trips Between Pittsfield and New York City (published 2026-05-14 · checked 2026-09-13)
  • ● Maryland Department of Transportation · DRAFT FY2027-FY2032 Consolidated Transportation Program, Maryland Transit Administration chapter (capital programme summary and 58 project pages with total estimated cost, expended through close year and six-year cash flow) (published 2026 · checked 2026-09-14)
  • ● Maine State Rail Plan, March 2023 · MaineDOT's state rail plan: 1,072-mile system operated by eight carriers, ownership and operated miles by railroad, Downeaster corridor and host railroads, Amtrak service agreement, Industrial Rail Access Program, annual rail line improvement allocation, 2021 bond Question 2, CP acquisition of Central Maine and Quebec Railway, CSX acquisition of Pan Am Railways, Rockland Branch operator change (published 2023-03-01 · checked 2026-10-08)
  • ● NNEPRA Service and Organizational Overview, October 2024 · NNEPRA's own presentation to a MaineDOT advisory committee: board and staff structure, agreements with Amtrak, CSX, MBTA and station communities, host-railroad ownership, funding sources, capital investments to date, Wells Area Improvement Project cost split, Portland Station Relocation and West Falmouth Station pipeline (published 2024-10-09 · checked 2026-10-08)
  • ● Michigan Department of Transportation - Passenger rail · Passenger rail page: three Amtrak routes, 22 station communities, MDOT-owned Kalamazoo-Dearborn segment (published 2026 · checked 2026-10-07)
  • ● Michigan Department of Transportation - Rail Strategic Plan FY2026-2030 · Section 707 Rail Strategic Plan submitted to the legislature 25 February 2026: FY2026 programme table, rolling five-year obligations (published 2026-02-25 · checked 2026-10-07)
  • ● Michigan Department of Transportation - State-owned rail · State-owned rail page: 665 miles operated by five freight railroads; 135-mile Kalamazoo-Dearborn line managed by Amtrak for access (published 2026 · checked 2026-10-07)
  • ● State of Missouri: Department of Transportation State Match for Amtrak program description (HB Section 4.530) · Budget programme description: state funding for Missouri River Runner service between St. Louis and Kansas City, stops at Kirkwood, Washington, Hermann, Jefferson City, Sedalia, Warrensburg, Lee's Summit and Independence. (published 2026 · checked 2026-10-07)
  • ● MoDOT: Missouri River Runner 2026 Economic Impact Study handout · Handout: 194,276 passengers in 2024; two daily round trips over 283 miles between St. Louis and Kansas City; in FY2025 MoDOT received $16 million in state support for operation; no dedicated state funding source for passenger rail, funding is a yearly general revenue appropriation. (published 2026 · checked 2026-10-07)
  • ● Amtrak (federal) — Carolinian service information · Amtrak Carolinian service (New York-Charlotte on NCRR corridor) calls at Raleigh, Greensboro (published 2026 · checked 2026-09-20)
  • ● Amtrak (federal) — Piedmont service information · Amtrak Piedmont service (daily Charlotte-Raleigh on NCRR corridor) funded by state (published 2026 · checked 2026-09-20)
  • ● Amtrak (media centre) · Amtrak awards contracts and prepares to begin major Dock Bridge rehabilitation project (published 2026-07 · checked 2026-09-13)
  • ● New Mexico State Rail Plan, February 2026 · NMDOT State Rail Plan prepared by Huitt-Zollars; read page by page: ownership and operation of Rail Runner (pp. 30-40), funding programmes (pp. 91-96), short-range investment programme (pp. 115-119), long-range programme (p. 127-128) (published 2026-02-13 · checked 2026-10-08)
  • ● ODOT Passenger Rail & Amtrak page · ODOT's description of its rail role: overseeing the Heartland Flyer, crossing safety and maintenance of state-owned lines; says the Flyer began 15 June 1999 as an Amtrak and ODOT joint venture and is the state's only passenger rail (published 2026-10-08 · checked 2026-10-08)
  • ● Oklahoma State Rail Plan, June 2026 (Version 1.0, draft) · ODOT's draft 2026 State Rail Plan as posted for comment: Freight Mobility Branch, 142 miles of state-owned track, Heartland Flyer funding tables 2-6 and 2-7, CRISI and RCE awards, Tulsa Ports rail projects, passenger rail chapter and the 107-project Rail Service and Investment Program. A draft, not an adopted plan (published 2026-06 · checked 2026-10-08)
  • ● Oregon Department of Transportation · Amtrak Cascades - Oregon 2025 Annual Performance Report, ODOT Multimodal and Rail Services Unit, March 2026 (PDF, 14 pages, 1,652,526 bytes). Carries five-year Oregon ridership, customer on-time performance, the total operating cost, revenue and farebox recovery series for Oregon-funded trains 2021-2025, the 2025 accomplishments and the 2026-2028 timeline. (published 2026-03 · checked 2026-09-14)
  • ● Oregon Department of Transportation · Passenger Rail — ODOT's own page on the Amtrak Cascades service. States that the Oregon portion offers two daily round trips from Eugene to Seattle, that Amtrak Cascades serves 18 cities on 467 track miles between Vancouver BC and Eugene, that 951,397 passengers rode Amtrak Cascades in 2025, that the service is funded by ticket revenue with Washington and Oregon offsetting the difference between costs and revenue, and that the Oregon stations are Portland, Oregon City, Salem, Albany and Eugene. Read 14 September 2026, HTTP 200. (published 2026 · checked 2026-09-14)
  • ● Oregon Department of Transportation · Draft Oregon State Rail Plan 2027 (PDF, 199 pages, 15,850,098 bytes), published for comment 8 September 2026. Sections used: the existing rail system profile (two Class I railroads and 23 Class III short-line railroads, six of them switching railroads and terminal yards); the Amtrak Cascades service and rolling stock sections; the state-identified near-term and long-term passenger rail capital investments; Table 4-10 recent Oregon rail program funding 2025-2027; and Table 4-11 Connect Oregon rail funding. (published 2026-09-08 · checked 2026-09-14)
  • ● Southeastern Pennsylvania Transportation Authority · FY 2027 Proposed Budget (operating and capital, twelve-year capital programme FY2027-38) (published 2026 · checked 2026-09-13)
  • ● RIDOT Providence Station State of Good Repair Project · Project page: Amtrak-owned station, RIDOT full partner, FRA grant for final design and construction, construction 2024 to 2026, total projected cost (published undated · checked 2026-10-08)
  • ● Rio Metro Regional Transit District Budget and Capital Plan FY2027-FY2031 · Adopted 15 May 2026; Rail Runner budget (Tables 1-1, 1-2), capital maintenance programme, funded and unfunded capital projects (Tables 2-2, 2-3), partner pass-through projects (Table 2-4) (published 2026-05-15 · checked 2026-10-08)
  • ● Steel Dynamics · SDI standard rail approved by BNSF, CSX, Norfolk Southern, Union Pacific and Amtrak (published 2010-10 · checked 2026-09-06)
  • ● USAspending award RI-2022-007 · FTA award to Rhode Island DOT with CMAQ funds for Northeast Corridor commuter rail operations: RIDOT access agreement with Amtrak, costs incurred by MBTA (published 2026-03-23 · checked 2026-10-08)
  • ● Virginia Passenger Rail Authority (VPRA) · Amtrak 209 Operating Agreement — staff presentation to the Board, 27 August 2026 (published 2026-08-27 · checked 2026-09-14)
  • ● Virginia Passenger Rail Authority (VPRA) · Executive Director's Report, August 2026 — project-by-project cost, contractor, status and grant tables (61 pages) (published 2026-08-27 · checked 2026-09-14)
  • ● Virginia Passenger Rail Authority (VPRA) Board · Resolution of 27 August 2026: Authority to Execute FY27 State Supported Agreement between VPRA and Amtrak (published 2026-08-27 · checked 2026-09-14)
  • ● VTrans FY2026 Transportation Program - Rail (as passed) · FY2026 as-passed rail programme: total line items, Amtrak operations subsidy, Windsor-St. Albans CRISI(17) and Tri-State Regional Rail Upgrade CRISI(24) lines; also the VTRY(59), REGM2350, REWC2318, GMRC(24), VTRY(45) and RAIL PASS. SERVICE lines (published 2025-06-10 · checked 2026-10-08)
  • ● VTrans Passenger Rail Service page · Describes the state-supported Vermonter (Washington to St. Albans) and Ethan Allen Express (New York to Burlington, state-supported from Albany-Rensselaer) services and the capped in-state fares (published undated · checked 2026-10-08)
  • ● 2025 Vermont Rail Plan (December 2025) · State Rail Plan: Amtrak services, 570.3 active route miles with 297.6 state-owned, rail funding outlook, CRISI projects, Corridor ID grants, SFY2026 rail programme (published 2025-12-29 · checked 2026-10-08)
  • ● Central Puget Sound Regional Transit Authority (Sound Transit) · 2026 Adopted Budget and Financial Plan — agency overview, transit operating budgets by mode, project budgets, Transit Improvement Plan and Appendix I project and programme detail pages (published 2026-03-23 · checked 2026-09-14)
  • ● Central Puget Sound Regional Transit Authority (Sound Transit) · Report - Transit Development Plan 2026-2031 (submitted under RCW 35.58.2795; information current as of June 2026; Board adoption scheduled 27 August 2026) (published 2026-08-06 · checked 2026-09-14)
  • ● Washington State Department of Transportation · How we manage the trains — Amtrak Cascades sponsorship, corridor management, business model and train equipment (published 2026 · checked 2026-09-14)
  • ● Washington State Department of Transportation · Passenger rail — Rail, Freight and Ports Division landing page with the division's published contact desk (published 2026 · checked 2026-09-14)
  • ● WisDOT · Amtrak passenger rail service page: Wisconsin is served by the Hiawatha Service (stated as six round trips a day), the Empire Builder and the Borealis, with the station list. Read 7 October 2026. (checked 2026-10-07)
  • ● WisDOT · Twin Cities-Milwaukee-Chicago (TCMC) Intercity Passenger Rail Infrastructure Project page: Borealis start 21 May 2024, $53 million project, $31.8 million CRISI grant of September 2020, $12.6 million Restoration and Enhancement grant of May 2020, construction anticipated 2025 to 2027, La Crosse works list. Read 7 October 2026. (checked 2026-10-07)

Tenders

TenderStatusValue bandNext key date
Amtrak Penn Station Transformation PartnersPre-bid$7-8bn (estimated transformation cost)
Amtrak long-distance fleet replacement RFPPre-bidNot published (Amtrak describes a multi-billion-dollar procurement)Published April 2026
Amtrak Dock Bridge Passaic SkanskaAwarded$100–500m
NextGen Acela trainsets Alstom AmtrakIn executionover $1bn
Airo trainsets Siemens Mobility AmtrakIn executionover $1bnPublished July 2021
Sunnyside Yard maintenance facility Scalamandre CitnaltaIn executionOver $1bn (Amtrak-published combined investment: maintenance facility, crew base and platform improvements)
Connecticut River Bridge replacement O&G Tutor PeriniIn executionover $1bn
Amtrak William H. Gray III 30th Street StationIn execution$500m–1bn
Penn Coach Yard maintenance facility PhiladelphiaIn execution$100–500m
King Street Yard maintenance facility Seattle PCLIn execution$100–500m
Gulf Coast restoration CRISI grantIn execution$100–500m
Gulf Coast Mardi Gras Service operating grantIn execution$25–100m
Williston station accessibility upgradeIn execution$5–25m
Rugby station accessibility upgradeIn execution$5–25m
Wilmington station renovationIn execution$5–25m
Amtrak East River Tunnel tubes 1-2 rehabilitationIn executionvalue not published
Ivy City Yard modernisation Clark HerzogIn executionNot published
Southampton Yard modernisation BostonIn executionNot published
Amtrak state-supported fleet modernisation grantPlannedover $1bn
Amtrak Chicago hub 14th to Canal Street YardPlanned$500m–1bn
Sawtooth Bridges enabling works KearnyPlanned$100–500m
Amtrak South Branch Bridge Chicago River replacementPlanned$25–100m
Malta Empire Builder track and signal upgradePlanned$5–25m
Springfield Line Connecticut River Bridge planningPlanned$5–25m
Niles-Glenwood Road capacity enhancementPlanned$5–25m

What changed

From This Week in Rail, newest first.

  • 2026-11-16 — Amtrak marks a milestone in the transformation of Philadelphia's 30th Street Station.
  • 2026-11-16 — Amtrak tops out the steel structure for its new train maintenance facility in Boston.
  • 2026-11-16 — Amtrak begins construction of new boarding platforms at Chicago Union Station.
  • 2026-11-02 — Amtrak completes the second major track cutover on the new Portal North Bridge. Part of the Gateway Program's Hudson River rail-crossing renewal.
  • 2026-11-02 — Amtrak completes its "Pause for Progress" infrastructure upgrade programme in Washington, D.C.

Withheld in the free surface

  • Procurement structure
  • Award history (5)
  • Entry path
  • Portals (7)
  • Published contacts (4)

Full detail withheld: 5 fields. In the United States edition · See a fully open example

8 sources · 7 primary
  • ● Amtrak · amtrak.com — reports & documents (published 2026 · checked 2026-09-05)
  • ● Amtrak (media centre) · FY25 Year End Ridership (published 2025-11-18 · checked 2026-09-05)
  • ○ Mass Transit · Amtrak closes FY25 with record ridership, revenue (published 2025-11 · checked 2026-09-05)
  • ● Amtrak (corporate site) · Amtrak Procurement Opportunities: portal, Supplier Directory, Construction and Non Construction Services categories (checked 2026-10-07)
  • ● Amtrak (procurement portal) · Amtrak Procurement Portal (single-page application; listing not readable by automated fetch) (checked 2026-10-07)
  • ● Amtrak (media centre) · Amtrak to Transform Rail Travel with $7.3 Billion Investment in State-of-the-Art Equipment (published 2021-07-07 · checked 2026-10-07)
  • ● Amtrak (media centre) · Amtrak Awarded Nearly $3B in USDOT Grants to Buy New Trains and Improve Service Nationwide (published 2026-08-14 · checked 2026-10-07)
  • ● Amtrak (media centre) · Amtrak Takes Big Step Towards New Long Distance Trains (published 2026-04-15 · checked 2026-10-07)

Browse: the Atlas · United States · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.