Buyer · State DOT
? How to use this page

How to use a buyer page

  1. Who this buyer is, then who already holds positions here and what it is tendering.
  2. Click Watch and every change lands in your weekly digest.
  3. How to sell here — the route in, thresholds, portals and contacts — opens with this market's edition.

Connecticut Department of Transportation (Office of Rail)

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Type
State DOT — State transportation department; its Office of Rail inside the Bureau of Public Transportation supports passenger and freight rail and manages state-owned rail right-of-way
Market · Region
United States · Connecticut
Open tenders
0
Technology areas
Track & civil, Electrification, Signalling & train control, Rolling-stock hardware, Digital operations

Connecticut's state transport department; buys and builds New Haven Line, Hartford Line and Shore Line East rail.

About this buyer

Read more

Owns the state's commuter and regional rail programmes: the New Haven Line, operated by Metro-North under contract, the Hartford Line and Shore Line East. Leads the Walk Bridge Program, Time for CT, Hartford Line double-tracking and the coach renewal programme, and manages 320-plus miles of state-owned right-of-way.

Type
State DOT — State transportation department; its Office of Rail inside the Bureau of Public Transportation supports passenger and freight rail and manages state-owned rail right-of-way
Where
Connecticut · Hartford
Programmes
Northeast Corridor, IIJA / Bipartisan Infrastructure Law, FRA Federal-State Partnership for Intercity Passenger Rail, FRA Consolidated Rail Infrastructure and Safety Improvements
Technology areas
Track & civil, Electrification, Signalling & train control, Rolling-stock hardware, Digital operations

Structure

  • operated by Metro-North — Operates the New Haven Line, including the New Canaan, Danbury and Waterbury branches, under contract with CTDOT (active)
  • funded by FRA — Federal-State Partnership award for Walk Bridge construction, cumulative on USAspending (in 2023 plus in 2025) (active)
  • funded by FRA — Federal-State Partnership award for TIME-1 Contract A, plus congressionally directed CRISI (active)
  • funded by FRA — Federal-State Partnership award, design of seven rail overpass bridges on the New Haven Line (active)
  • funded by FRA — FFY2024 Federal-State Partnership award, Cos Cob Bridge replacement planning study (capital plan listing) (active)

Who holds what here

  • awarded Alstom — 60 single-level commuter coaches, announced 9 August 2023 (active)
Sources for these relationships (8)

Tenders

TenderStatusValue bandNext key date
TIME-1 Contract A Bridgeport StratfordAwarded$100–500mAwarded February 2026
Hartford Line Enfield station and trackAwarded$25–100mAwarded October 2026
Housatonic River rail bridge interim repairsAwarded$5–25mAwarded December 2025
Naugatuck railroad stationAwarded$5–25mAwarded May 2025
New Haven coach yard acceptance facilityAwarded$5–25mAwarded August 2025
Walk Bridge replacement NorwalkIn executionover $1bnCompletion 2023
Alstom 60 commuter coachesIn execution$100–500mPublished August 2023
Hartford Line Phase 4 stationsIn execution$100–500m
Stamford maintenance-of-equipment facility renovationIn execution$100–500mCompletion 2028
New Haven Rail Yard car and diesel shopsIn execution$100–500m
TIME-2 projects East NorwalkIn execution$100–500m
Waterbury Branch platform replacementsIn execution$25–100m
Hartford Line Windsor Locks stationIn execution$5–25mAwarded July 2022
Devon Rail Bridge replacementPlannedover $1bn
New Haven Line station information upgradesPlanned$100–500m
Hartford Line Phase 3B double trackPlanned$100–500m
New Haven State Street Station platformPlanned$100–500m
New Haven Union Station platformsPlanned$100–500m
New Haven Line signal system improvementsPlanned$100–500m
Stamford Yard catenary improvementsPlanned$100–500m
Danbury fueling yard facilityPlanned$25–100m
Derby-Shelton railroad stationPlanned$25–100m
New Haven Line seven overpass bridges designPlanned$25–100m
New Haven Line Power Phase 2 substationsPlanned$60m-$89.99m scope band
New Haven Rail Yard wheel truing facilityPlanned$25–100m
Stamford MOE PowerPlannedAdvertising schedule scope band L ($30m to $39.99m)
Cos Cob Bridge replacement planningPlanned$5–25m
New Haven Line fiber and CCTV upgradePlanned$5–25m
Saugatuck River rail bridge planningPlanned$5–25m
Shore Line East Madison stationPlannedAdvertising schedule scope band K ($20m to $29.99m)
Waterbury station waiting roomPlanned$5–25m
TIME-1 Contracts B and CPlanned

Withheld in the free surface

  • Procurement structure
  • Award history (5)
  • Entry path
  • Portals (5)
  • Published contacts (3)

Full detail withheld: 5 fields. In the United States edition · See a fully open example

12 sources · all primary

Browse: the Atlas · United States · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.