Utah

3 buyers · 10 tenders · checked 2026-10-07

UTA's Stadler light rail order and UDOT-led FrontRunner 2X double-tracking, now in the FTA Engineering phase, are the two buying programmes.

Everything here is free. One market edition opens in full with one email. Open your free edition

1Metro systems operating
3Buyers tracked
10Tenders tracked
3Cities tracked
Live pipeline
FrontRunner 2X: about $3.2bn project cost, FTA Capital Investment Grants ceiling $1.29bn (UDOT and UTA; FTA Engineering phase from 7 August 2026, no funding agreement yet); FrontRunner 2X trainsets: Stadler's $328.3m bid for 10 diesel multiple units, contract not finalised (UDOT and UTA); Stadler Citylink light rail vehicles: $129m base order for 20 cars, 40 on order, options to 80 (UTA); FTA state-of-good-repair grant $71.7m for TRAX track, power and train control (UTA); FRA Railroad Crossing Elimination grant $7.5m for the Central Utah corridor consolidation (UDOT)
Technology areas
Rolling-stock hardware, Track & civil, Signalling & train control, Electrification, Predictive maintenance

Key figures

FrontRunner 2X federal funding ceilingnearly $1.3bnFTA ceiling on Capital Investment Grants funding for FrontRunner 2X, set when the FTA admitted the project to the Engineering phase on 7 August 2026: $1,286,611,600, about 40% of a $3.22 billion project cost (UDOT's release says nearly $1.3bn; Progressive Railroading reports $1.28bn). Utah's own plan sought $2.38 billion (74%). No full funding grant agreement is signed.
3 sources · 1 primary
FrontRunner 2X scope26.1 miles of double track; 10 trainsetsFrontRunner 2X scope: 26.1 miles of new double track at 11 locations, one new station, 10 trainsets and a new maintenance facility, for 15-minute peak and 30-minute off-peak service; construction anticipated 2027 to 2030
2 sources · all primary
  • ● Utah Department of Transportation (official) — FrontRunner 2X advances to final phase of process for nearly $1.3 billion federal grant · UDOT release of 7 August 2026: FTA approved FrontRunner 2X to enter the Engineering phase of the Capital Investment Grants programme; 26.1 miles of double track at 11 locations, one new station, 10 trainsets, a new maintenance facility; construction anticipated 2027 to 2030 subject to the federal grant process; next step a Full Funding Grant Agreement (published 2026-08-07 · checked 2026-10-07)
  • ● FrontRunner 2X project site (UDOT and UTA) · Project site: double tracking at 11 locations, one new station, 10 new trainsets, 15-minute peak and 30-minute off-peak service goal; schedule 2025-2026 design, preconstruction and train procurement, 2027-2030 construction; schedule depends on federal grants; no cost, awarded contract or trainset award stated on the page (published 2026 · checked 2026-10-07)
UTA Stadler Citylink order$129m; 20 cars, 40 on order, up to 80UTA's Stadler Citylink contract: $129m for the initial 20 low-floor cars (23 October 2024), 20 more by option in October 2025, 40 of 80 vehicles still optional; built at Stadler's Salt Lake City plant
3 sources · 2 primary
FTA light rail vehicle grant$60mFTA grant UT-2024-006 (27 February 2024 to 30 June 2029) for replacing 20 low-floor light rail vehicles
1 source · primary
FTA rail state-of-good-repair grant$71.7mFTA grant UT-2025-002 (2 December 2024 to 30 March 2028) for rail state of good repair: track, switches, traction power, train control, fibre and light rail car rehabilitation
1 source · primary
  • ● USAspending.gov — FTA grant UT-2025-002, Utah Transit Authority · Federal award record: $71,740,154, 20.525 State of Good Repair, period 2 December 2024 to 30 March 2028; eight scope activities: rail line and grade crossing replacement, rail switches, traction power substation equipment, train control and signal system rehabilitation, communications fibre, light rail car rehabilitation, preventive maintenance of rail vehicles and facilities (published 2024-12-02 · checked 2026-10-07)
FRA crossing-elimination grant$7.5mFRA Railroad Crossing Elimination grant to UDOT (signed 20 May 2025; grant period from 1 May 2025) for development of the Central Utah corridor consolidation: 7 miles of line abandoned and 19 crossings discontinued
1 source · primary

Buyers

BuyerTypeTendersContracts awarded
Utah Transit AuthorityTransit authority62
Utah Department of TransportationState DOT41
Utah Inland Port AuthorityDevelopment authority00

Tenders

Cities

CityNetwork statusNetworks
Salt Lake Cityoperational — UTA runs TRAX light rail (nearly 13 million customers in 2025), the S-Line streetcar, which is being extended a quarter of a mile east from Fairmont Station to Highland Drive, and FrontRunner commuter rail; the TRAX fleet is being renewed with Stadler Citylink low-floor cars built at Stadler's Salt Lake City plant. The Salt Lake, Garfield & Western West Interchange, near Salt Lake City Airport, began construction on 17 July 2026.UTA TRAX (light rail); UTA S-Line (streetcar); UTA FrontRunner (commuter rail)
Ogdenoperational — northern terminus of FrontRunner commuter rail, which runs to Provo alongside the Union Pacific Railroad and I-15 and is mostly single track; FrontRunner 2X would add double track at 11 locations along the corridor.UTA FrontRunner (commuter rail)
Provooperational — southern terminus of FrontRunner commuter rail. FrontRunner 2X double-track design between the Vineyard, Provo and Orem stations is under way, and a separate FRA-funded study covers consolidating Union Pacific's Provo Subdivision corridors through Spanish Fork, Mapleton and Springville.UTA FrontRunner (commuter rail)

Withheld in the free surface

  • Capex in this region (3)
  • Market narrative

Full detail withheld: 2 fields. In the United States edition · See a fully open example

  • Note

Full detail withheld: 1 field. In the United States edition · See a fully open example

Sources

Browse: the Atlas · United States · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.