Oklahoma
5 buyers · 8 tenders · checked 2026-10-08
Federal short-line and crossing grants, the Heartland Flyer's unfunded future and a Catoosa unit train facility; the Oklahoma City streetcar buys nothing now.
Everything here is free. One market edition opens in full with one email. Open your free edition
0Metro systems operating
5Buyers tracked
8Tenders tracked
4Cities tracked
Heartland Flyer intercity service (Oklahoma City to Fort Worth), the seven-vehicle OKC Streetcar and 20-odd freight railroads; no metro or light railRail systems note
- Live pipeline
- Davis occupied crossing mitigation: up to $25.4m FRA Railroad Crossing Elimination selection (ODOT total project $31.8m); Kiamichi Tri-State rail upgrade phase 2: $56.6m CRISI selection; Stillwater Central short line upgrade: $29.5m CRISI selection; Kiamichi phase 1: $10.0m CRISI grant to ODOT in execution to April 2027 (multi-state); Port of Catoosa unit train facility: $37.5m under construction; Catoosa S-curve relocation: $54m railroad-reported estimate; Heartland Flyer contract: $7.06m total 2026 contract cost; draft State Rail Plan: 38 defined projects at $675m (programme list, not a budget)
- Technology areas
- Track & civil, Signalling & train control, Rolling-stock hardware
Key figures
State-owned track142 miles
1 source · primary
- ● Oklahoma State Rail Plan, June 2026 (Version 1.0, draft) · ODOT's draft 2026 State Rail Plan as posted for comment: Freight Mobility Branch, 142 miles of state-owned track, Heartland Flyer funding tables 2-6 and 2-7, CRISI and RCE awards, Tulsa Ports rail projects, passenger rail chapter and the 107-project Rail Service and Investment Program. A draft, not an adopted plan (published 2026-06 · checked 2026-10-08)
Heartland Flyer 2026 cost$7.06m
2 sources · all primary
- ● Oklahoma State Rail Plan, June 2026 (Version 1.0, draft) · ODOT's draft 2026 State Rail Plan as posted for comment: Freight Mobility Branch, 142 miles of state-owned track, Heartland Flyer funding tables 2-6 and 2-7, CRISI and RCE awards, Tulsa Ports rail projects, passenger rail chapter and the 107-project Rail Service and Investment Program. A draft, not an adopted plan (published 2026-06 · checked 2026-10-08)
- ● ODOT September 2026 Commission meeting wrap-up (PR 26-029, 14 September 2026) · ODOT release: Heartland Flyer to continue through 2027 with TxDOT funding and ODOT's Passenger Rail Revolving Fund; about $2.5 million a year of additional legislative appropriations needed beyond 2027 (published 2026-09-14 · checked 2026-10-08)
Flyer extension to Newton$311m to $573m
2 sources · all primary
- ● Oklahoma State Rail Plan, June 2026 (Version 1.0, draft) · ODOT's draft 2026 State Rail Plan as posted for comment: Freight Mobility Branch, 142 miles of state-owned track, Heartland Flyer funding tables 2-6 and 2-7, CRISI and RCE awards, Tulsa Ports rail projects, passenger rail chapter and the 107-project Rail Service and Investment Program. A draft, not an adopted plan (published 2026-06 · checked 2026-10-08)
- ● USAspending: FRA Corridor ID award to KDOT (Heartland Flyer corridor) · Award 69A36524520390FSPKS, $500,000, assistance listing 20.326, 8 April 2024 to 31 October 2026; scope names Edmond, Perry and Ponca City, Oklahoma and Arkansas City, Wichita and Newton, Kansas (published 2024-05-14 · checked 2026-10-08)
CRISI short-line awards$56.6m and $29.5m
3 sources · 2 primary
- ● Oklahoma State Rail Plan, June 2026 (Version 1.0, draft) · ODOT's draft 2026 State Rail Plan as posted for comment: Freight Mobility Branch, 142 miles of state-owned track, Heartland Flyer funding tables 2-6 and 2-7, CRISI and RCE awards, Tulsa Ports rail projects, passenger rail chapter and the 107-project Rail Service and Investment Program. A draft, not an adopted plan (published 2026-06 · checked 2026-10-08)
- ○ Progressive Railroading: other CRISI short-line awards by state (12 November 2024) · Trade-press list quoting the FRA CRISI report: Kiamichi Railroad Co. $56.6 million and Stillwater Central Railroad $29.4 million, with project scopes. Secondary: the FRA's CRISI selection page (railroads.dot.gov) returns 403 (published 2024-11-12 · checked 2026-10-08)
- ● USAspending award 69A36523403770CRSOK (FRA CRISI, ODOT) · FRA CRISI award to ODOT of $10,006,289 signed 13 December 2022 for the Kiamichi Railroad network in Texas, Arkansas and Oklahoma; period of performance to 30 April 2027 (published 2022-12-13 · checked 2026-10-08)
Davis crossing grantabout $25.4m
2 sources · 1 primary
- ○ Senate press release on Oklahoma railroad grants (15 January 2025) · US Senator's office release naming four Railroad Crossing Elimination grants to ODOT and the City of Claremore, including about $25.4m for the Occupied Crossing Mitigation Project in Davis. Secondary: the funder's own award page (railroads.dot.gov) returns 403 (published 2025-01-15 · checked 2026-10-08)
- ● ODOT Davis RCE funding commitments (30 August 2024) · ODOT's cover letter and BNSF support letter for the Occupied Crossing Mitigation application: close Atlanta Avenue and Hanover Road crossings, remove siding at Benton Avenue and Main Street, build about 2 miles of new siding south of Hanover Road; request, total cost and ODOT and BNSF match figures (published 2024-08-30 · checked 2026-10-08)
Draft rail programme$675m
1 source · primary
- ● Oklahoma State Rail Plan, June 2026 (Version 1.0, draft) · ODOT's draft 2026 State Rail Plan as posted for comment: Freight Mobility Branch, 142 miles of state-owned track, Heartland Flyer funding tables 2-6 and 2-7, CRISI and RCE awards, Tulsa Ports rail projects, passenger rail chapter and the 107-project Rail Service and Investment Program. A draft, not an adopted plan (published 2026-06 · checked 2026-10-08)
Buyers
| Buyer | Type | Tenders | Contracts awarded |
|---|---|---|---|
| City of Tulsa-Rogers County Port Authority (Tulsa Ports) | Development authority | 3 | 0 |
| Oklahoma Department of Transportation, Freight Mobility Branch | State DOT | 3 | 0 |
| Kiamichi Railroad | Freight railroad | 1 | 0 |
| Stillwater Central Railroad | Freight railroad | 1 | 0 |
| Central Oklahoma Transportation and Parking Authority (EMBARK) | Transit authority | 0 | 0 |
Tenders
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Port of Catoosa unit train facility | Tulsa Ports | In execution | $25–100m | |
| Port of Inola Verdigris Southern rail spur | Tulsa Ports | In execution | $5–25m | |
| Heartland Flyer Amtrak operating contract | ODOT | In execution | $5–25m | |
| Kiamichi Tri-State rail upgrade, phase 1 | ODOT | In execution | $5–25m | |
| Davis occupied crossing mitigation (BNSF siding) | ODOT | Planned | $25–100m | |
| Stillwater Central short line track and bridge upgrade | Stillwater Central | Planned | $25–100m | |
| Catoosa lead track S-curve relocation | Tulsa Ports | Planned | $25–100m | |
| Kiamichi Tri-State rail upgrade, phase 2 | Kiamichi Railroad | Planned | $25–100m |
Cities
| City | Network status | Networks |
|---|---|---|
| Oklahoma City | streetcar and intercity rail - the COTPA-run OKC Streetcar (seven vehicles, two loops, 22 stops) stops beside Santa Fe Depot, the Oklahoma City terminus of Amtrak's Heartland Flyer to Fort Worth; BNSF and Union Pacific lines cross the city and ONE Transit's plan names a commuter corridor on the BNSF line. | OKC Streetcar; Amtrak Heartland Flyer |
| Catoosa | freight - the Tulsa Port of Catoosa is served by the Port of Catoosa Industrial Railroad (OmniTRAX) with BNSF and South Kansas and Oklahoma connections; a unit train facility is under construction. | |
| Inola | freight - the Port of Inola is joined to the Union Pacific by the 4.4-mile Verdigris Southern Railroad, opened in 2024. | |
| Davis | intercity passenger and freight - Amtrak's Heartland Flyer and BNSF trains share the line through Davis, where blocked crossings are the subject of a federal crossing-elimination grant to ODOT. |
Withheld in the free surface
- Capex in this region (3)
- Live pipeline value (3)
- Market narrative
Full detail withheld: 3 fields. In the United States edition · See a fully open example
- Note
- Methodology note
Full detail withheld: 2 fields. In the United States edition · See a fully open example
Sources
- ● BidNet Direct: City of Oklahoma City and Trusts open solicitations · Portal list read 8 October 2026: 15 open solicitations, none for rail, streetcar or EMBARK; the City of Oklahoma City trusts (including COTPA) post here (published 2026-10-08 · checked 2026-10-08)
- ● EMBARK OKC Streetcar page · Streetcar landing page: fare-free from 7 August 2026, serving Auto Alley, Arts District, Bricktown, City Center and Midtown (published 2026-10-08 · checked 2026-10-08)
- ○ Senate press release on Oklahoma railroad grants (15 January 2025) · US Senator's office release naming four Railroad Crossing Elimination grants to ODOT and the City of Claremore, including about $25.4m for the Occupied Crossing Mitigation Project in Davis. Secondary: the funder's own award page (railroads.dot.gov) returns 403 (published 2025-01-15 · checked 2026-10-08)
- ● ODOT Passenger Rail & Amtrak page · ODOT's description of its rail role: overseeing the Heartland Flyer, crossing safety and maintenance of state-owned lines; says the Flyer began 15 June 1999 as an Amtrak and ODOT joint venture and is the state's only passenger rail (published 2026-10-08 · checked 2026-10-08)
- ● Oklahoma State Rail Plan appendix, 2026 draft · Draft appendices: Class III railroad datasheets (including the Port of Catoosa Industrial Railroad unit train facility phases), Heartland Flyer station table and Appendix F project list (published 2026-06 · checked 2026-10-08)
- ● Oklahoma State Rail Plan, June 2026 (Version 1.0, draft) · ODOT's draft 2026 State Rail Plan as posted for comment: Freight Mobility Branch, 142 miles of state-owned track, Heartland Flyer funding tables 2-6 and 2-7, CRISI and RCE awards, Tulsa Ports rail projects, passenger rail chapter and the 107-project Rail Service and Investment Program. A draft, not an adopted plan (published 2026-06 · checked 2026-10-08)
- ● ODOT Oklahoma State Rail Plan page · ODOT's page for the 2026 State Rail Plan update: links the draft plan and appendix, asks for comments by 15 June, and lists the 2021 and 2018 plans as archives (published 2026-10-08 · checked 2026-10-08)
- ○ Progressive Railroading: other CRISI short-line awards by state (12 November 2024) · Trade-press list quoting the FRA CRISI report: Kiamichi Railroad Co. $56.6 million and Stillwater Central Railroad $29.4 million, with project scopes. Secondary: the FRA's CRISI selection page (railroads.dot.gov) returns 403 (published 2024-11-12 · checked 2026-10-08)
- ● Tulsa Ports: Verdigris Southern Railroad dedication (11 July 2024) · Reprint of a 5 June 2024 State Department of Commerce story: new 4.4-mile railroad connecting the Tulsa Port of Inola to the Union Pacific, a four-year project with USDOT, MARAD, ODOT, Commerce, Rogers County, Watco and Union Pacific among partners (published 2024-07-11 · checked 2026-10-08)
- ● USAspending: FRA Corridor ID award to KDOT (Heartland Flyer corridor) · Award 69A36524520390FSPKS, $500,000, assistance listing 20.326, 8 April 2024 to 31 October 2026; scope names Edmond, Perry and Ponca City, Oklahoma and Arkansas City, Wichita and Newton, Kansas (published 2024-05-14 · checked 2026-10-08)
- ● USAspending award 69A36523403770CRSOK (FRA CRISI, ODOT) · FRA CRISI award to ODOT of $10,006,289 signed 13 December 2022 for the Kiamichi Railroad network in Texas, Arkansas and Oklahoma; period of performance to 30 April 2027 (published 2022-12-13 · checked 2026-10-08)