Buyer · Transit authority
? How to use this page

How to use a buyer page

  1. Who this buyer is, then who already holds positions here and what it is tendering.
  2. Click Watch and every change lands in your weekly digest.
  3. How to sell here — the route in, thresholds, portals and contacts — opens with this market's edition.

Central Puget Sound Regional Transit Authority (Sound Transit)

Live now: 3 tenders, largest Sound Transit Link light rail vehicle simulator (value not published); holds relationships with SYSTRA, Brookville, Jacobs.

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Type
Transit authority — regional transit authority for Snohomish, King and Pierce counties under RCW 81.104 and 81.112; Link light rail, Sounder commuter rail, the T Line streetcar, ST Express bus and the Stride bus rapid transit programme
Market · Region
United States · Washington
Open tenders
3
Technology areas
Rolling-stock hardware, Signalling & train control, Track & civil, Electrification, Predictive maintenance, Digital operations, Cybersecurity, AI inspection

Operates Link light rail, Sounder commuter rail and T Line streetcar in Puget Sound region.

About this buyer

Read more

Builds and owns the Puget Sound regional rail network: the Link 1 and 2 Lines (43 miles of track, 33 stations, a fleet of 218 and rising), Sounder commuter rail (81.8 miles, 12 stations, 78 railcars and 14 locomotives) and the 7.51-mile T Line streetcar in Tacoma, on a 2026 budget of $3.3bn of which $1.855bn is system expansion. The Board updated the ST3 System Plan on 28 May 2026, superseding the 2021 realignment.

Type
Transit authority — regional transit authority for Snohomish, King and Pierce counties under RCW 81.104 and 81.112; Link light rail, Sounder commuter rail, the T Line streetcar, ST Express bus and the Stride bus rapid transit programme
Where
Washington · Seattle
Programmes
FTA Capital Investment Grants, IIJA / Bipartisan Infrastructure Law
Technology areas
Rolling-stock hardware, Signalling & train control, Track & civil, Electrification, Predictive maintenance, Digital operations, Cybersecurity, AI inspection

Structure

  • operated by King County Metro — Day-to-day operations, maintenance, dispatching and complementary paratransit for Link light rail under contract (active)
  • operated by BNSF — Operator of Sounder commuter rail service and owner of the railway between Tacoma and Everett (active)
  • regulated by WUTC — State rail safety programme: inspections, crossing projects and investigation of fatal rail accidents (active)

Who holds what here

  • awarded Arcadis — Ten-year software-as-a-service contract for the Asset Management System Redesign programme (active · since 2026-08)
  • awarded Jacobs — Phase 2 civil engineering design services for the West Seattle Link Extension (active · since 2026-06)
  • awarded Mott MacDonald — Programme management support services for the West Seattle and Ballard Link Extensions, as Connect Seattle Partners (active · since 2026-06)
  • awarded WSP — Programme management support services for the West Seattle and Ballard Link Extensions, as Connect Seattle Partners (active · since 2026-06)
  • awarded Wabtec — Transportation systems supply contract; Sounder precision navigation modules (active · since 2026-03)
  • awarded Kimley-Horn — Graham Street Boeing Access Road infill stations — Kimley-Horn & Associates, Inc. (active · since 2026-01)
  • awarded SYSTRA — Sounder commuter rail car overhaul services, as part of the Systra-Brookville Joint Venture (active · since 2025-08)
  • awarded Brookville — Sounder commuter rail car overhaul services as part of the Systra-Brookville Joint Venture; builder of five of the eight T Line streetcars (active · since 2025-08)
  • awarded HNTB — Project development services for the West Seattle and Ballard Link Extensions, Phases 1 to 3 (active · since 2017-10)
  • supplied by Amtrak — Maintenance of the Sounder locomotive and passenger car fleet at Holgate yard, Seattle (active)
  • supplied by Siemens Mobility — Series 2 light rail vehicles built at Sacramento, California — 154 in service and rising to 162 (active)
  • supplied by Knorr-Bremse — Braking and door equipment supply contracts for the Link light rail fleet (active)
  • awarded Knorr-Bremse — Link light rail brake and door equipment supply — Knorr Brake Company LLC (active)
  • awarded Knorr-Bremse — Sound Transit light rail vehicle programme — Knorr Brake Company LLC (active)
  • awarded SYSTRA — Sound Transit commuter rail vehicle mid-life overhaul — Systra-Brookville Joint Venture (active)
Sources for these relationships (20)

Tenders

TenderStatusValue bandNext key date
Sound Transit Link light rail vehicle simulatorOpenvalue not publishedPublished August 2026
Sounder commuter rail HVAC overhaulOpenvalue not publishedPublished July 2026
Ballard Link Extension civil engineering designPre-bidno value published (pre-solicitation notice)
Sound Transit Series 3 light rail vehiclesBids closedvalue not published
West Seattle Link Extension packages · 2 partsBids closedVaries by part
West Seattle Link Extension W100 SODO StationBids closedvalue not publishedPublished August 2026
West Seattle Link Extension W200 Duwamish River CrossingBids closedvalue not publishedBids closed July 2026 · award expected
Sound Transit Asset Management System RedesignAwarded$25–100mAwarded August 2026
East Link Extension 2 Line Lake WashingtonIn executionover $1bn
Series 2 light rail vehicle fleet expansionIn execution$500m–1bn
Ballard Link Extension project development servicesIn execution$100–500mAwarded April 2026
Link Operations and Maintenance Facility East, BellevueIn execution$100–500m
Operations and Maintenance Facility South design-buildIn execution$100–500mAwarded March 2026
Pinehurst infill station Link 1 and 2 LinesIn execution$100–500m
Sound Transit commuter rail vehicle mid-life overhaulIn execution$100–500m
Sound Transit light rail vehicle programmeIn execution$100–500m
Sound Transit elevator and escalator modernisationIn execution$100–500m
Sumner, Kent and Auburn Sounder station parking improvementsIn execution$100–500m
Tacoma Trestle track and signal double-track replacementIn execution$100–500m
West Seattle Link Extension Phase 2 designIn execution$100–500mAwarded June 2026
West Seattle Ballard Link Extensions programme managementIn execution$100–500mAwarded June 2026
Sound Transit asset management support servicesIn execution$25–100mAwarded May 2026
Sound Transit digital passenger information systemIn execution$25–100m
Sound Transit facility property programme security upgradesIn execution$25–100m
Sounder Rail Track and Signal Improvement Phase 3In execution$25–100mAwarded April 2026
Sounder commuter rail car overhaul servicesIn execution$25–100mAwarded August 2025
Graham Street Boeing Access Road infill stationsIn execution$5–25mAwarded January 2026
Link light rail brake and door equipment supplyIn execution$5–25m
Sound Transit environmental mitigation monitoringIn execution$5–25mAwarded June 2026
Sound Transit signage programme East Link ExtensionIn execution$5–25mAwarded August 2026
Sounder D-to-M Track and Signal Hilltop Tacoma LinkIn execution$5–25mAwarded July 2026
T Line streetcar fleet Brookville light railIn execution$5–25mAwarded December 2025
Ballard Link Extension nine stations downtown SeattlePlannedover $1bn
Everett Link Extension phase 1 phase 2Plannedover $1bn
Sounder South additional trips capacity expansionPlannedover $1bn
South Kirkland to Issaquah LinkPlannedover $1bn
T Line extension Tacoma Community CollegePlannedover $1bn
Tacoma Dome Link Extension four stationsPlannedover $1bn
West Seattle Link Extension four stationsPlannedover $1bn
Downtown Seattle Transit Tunnel modernisation programmePlanned$100–500m
Lakewood and South Tacoma Sounder station accessPlanned$100–500m
Sound Transit crossings and train control programmePlanned$100–500m
Sound Transit innovation and technology programmePlanned$100–500m
Sound Transit transit system access programmePlanned$100–500m
Sounder Maintenance Base heavy rail storagePlanned$100–500m
Sounder fleet expansionPlanned$100–500m
North Corridor maintenance-of-way facilityPlanned$25–100m
Sound Transit facility electrical programme backup powerPlanned$25–100m
Sound Transit ORCA next generation fare systemsPlanned$25–100m
Sound Transit fire, life and safety systemsPlanned$25–100m
Sound Transit guideway programmes controls and structuralPlanned$25–100m
Sound Transit 1 Line traction power modernisationPlanned$25–100m
Sounder extension to DuPontPlanned$5–25m
Tacoma Dome Station parking and access improvementsPlanned$5–25m

Withheld in the free surface

  • Procurement structure
  • Published contacts (8)
  • Award history (10)
  • Entry path
  • Portals (6)

Full detail withheld: 5 fields. In the United States edition · See a fully open example

19 sources · all primary

Browse: the Atlas · United States · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.