Interstate Bridge Replacement Light Rail Design Services

Interstate Bridge Replacement - Transit Design Services: post-NEPA design of track, systems and stations for the light rail extension from Expo Center to Vancouver Waterfront

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Buyer
Tri-County Metropolitan Transportation District of Oregon (TriMet)
Where
Oregon · Portland
Segments
Consultancy, Track, Signalling, Stations & depots
Technology areas
Track & civil, Signalling & train control
Status
Planned — Not yet advertised.
Value band
$25 million to $30 million estimated cost as the programme publishes it - an estimate range, not a point · $25–100m (USD, for comparison)
Currency
USD
Key dates (month)
Anticipated advertisement 2027 · Programme ftga target 2030 · Light rail in service target 2036

Status in full

Read more

Not yet advertised. The Interstate Bridge Replacement programme's own contract-package listing and the programme update given to the TriMet Board in July 2026 both name TriMet as the contracting agency for Transit Design Services and give an anticipated advertisement in 2027. The programme states that all proposed projects are drafts subject to change and that the delivery methods and contracting agencies listed are initial proposals.

Next step

Planned — no solicitation published.

Read the notice: Interstate Bridge Replacement Program (ODOT and WSDOT) ↗

Withheld in the free surface

  • Full scope
  • How the figure was arrived at
  • Key dates (3)
  • Published bidders

Full detail withheld: 4 fields. In the United States edition · See a fully open example

2 sources · all primary
  • ● Interstate Bridge Replacement Program (ODOT and WSDOT) · Contract Resources and Opportunities — the programme's own list of active, funded-phase and unfunded-phase contract packages, each with the contracting agency, delivery method, duration, year and, where published, an estimated cost. Read 14 September 2026, HTTP 200, 45,084 bytes. (published 2026 · checked 2026-09-14)
  • ● TriMet (Tri-County Metropolitan Transportation District of Oregon) · Interstate Bridge Replacement Program update presented to the TriMet Board of Directors on 22 July 2026 (PDF, 21 pages, 3,342,983 bytes). Carries the 2026 updated cost estimate, the available-funding table, the core set of projects, the funded phase, the light rail next steps and the contract package sheets for the Columbia River Bridge Replacement, pre-completion tolling and Transit Design Services. (published 2026-07-22 · checked 2026-09-14)

Related tenders

Same buyer first, then the same segment in this market.

TenderBuyerStatusValue bandNext key date
Track Rehabilitation Project MAX System Five-yearTriMetAwarded$5–25mPublished May 2026
Type 6 Light Rail Vehicles Siemens Mobility S700TriMetIn execution$500m–1bn
Light Rail Vehicle Fleet Replacement and ExpansionTriMetPlanned$25–100mSanctioned May 2026
Show all 6 related tenders
TenderBuyerStatusValue bandNext key date
Type 1 Traction Power Substation MAX Blue LineTriMetIn execution$25–100m
Pioneer Courthouse Square Type 1 Traction Power SubstationTriMetIn execution$5–25m
Type 1 Substation Replacement MAX FY2027 ProgrammeTriMetPlanned$5–25mSanctioned May 2026

Browse: the Atlas · United States · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.