Pioneer Courthouse Square Type 1 Traction Power Substation

Pioneer Courthouse Square Type 1 traction power substation replacement - CM/GC services to reconfigure the underground vault and install new substation equipment (Mass. Electric Construction Company)

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Buyer
Tri-County Metropolitan Transportation District of Oregon (TriMet)
Where
Oregon · Portland
Segments
Electrification, Civil works
Technology areas
Track & civil
Status
In execution — In execution and substantially complete.
Value band
$5–25m
Currency
USD
Key dates (month)
Pre construction board approved June 2024 · Long lead items board approved September 2024 · Construction modification board approved January 2025

Status in full

Read more

In execution and substantially complete. The Board authorised the construction modification by Resolution 25-01-01 in January 2025, and the minutes of that meeting record the motion moved, seconded and passed with unanimous approval. Pre-construction services were in progress and long lead items on order when the Board acted. TriMet's FY2027 Adopted Budget records, among the Engineering & Construction Division's FY2026 accomplishments, that the Type 1 substation replacement at Pioneer Courthouse Square was substantially completed; TriMet publishes no completion date for it.

Next step

In execution — awarded and under way.

Read the notice: TriMet (Tri-County Metropolitan Transportation District of Oregon) ↗

Withheld in the free surface

  • Full scope
  • Exact value
  • How the figure was arrived at
  • Key dates (3)
  • Published bidders

Full detail withheld: 5 fields. In the United States edition · See a fully open example

3 sources · all primary
  • ● TriMet (Tri-County Metropolitan Transportation District of Oregon) · Resolution 25-01-01 of 22 January 2025 — authorising a modification of the construction manager/general contractor services contract with Mass. Electric Construction Company for the Pioneer Courthouse Square Type 1 Traction Power Substation Replacement Project. Read 14 September 2026, HTTP 200, 244,819 bytes, 4 pages. Prints the contract table in full: pre-construction services $295,096 under Resolution 24-06-36, long lead items and spare parts $1,465,000 under Resolution 24-09-46, subtotal $1,760,096, Modification 4 construction services $5,000,000 with a 20 per cent change order allowance of $1,000,000, and a total amount of modified CM/GC services contract of $7,760,096. Records that the original contract was procured through a competitive request for proposals. (published 2025-01-22 · checked 2026-09-14)
  • ● TriMet (Tri-County Metropolitan Transportation District of Oregon) · Minutes of the Board meeting of 22 January 2025, published in the packet of the 26 February 2025 meeting. Read 14 September 2026, HTTP 200, 371,062 bytes, 5 pages. Record that Resolution 25-01-01 was moved, seconded and passed with unanimous approval, and summarise the resolution — the reconfiguration of the Pioneer Courthouse Square substation, one of 12 installed in 1983 as part of the MAX Blue Line. (published 2025-02-26 · checked 2026-09-14)
  • ● TriMet (Tri-County Metropolitan Transportation District of Oregon) · FY2027 Adopted Budget (PDF, 402 pages, 33,714,353 bytes). Sections used: the Capital Improvement Program (pages 343-367) with the adopted CIP funding detail by project, the five-year CIP forecast and the CIP impacts on operations; the FY2025 transportation statistics (page 16); and the Maintenance Division's FY2026 accomplishments (page 209). (published 2026-05-27 · checked 2026-09-14)

Related tenders

Same buyer first, then the same segment in this market.

TenderBuyerStatusValue bandNext key date
Track Rehabilitation Project MAX System Five-yearTriMetAwarded$5–25mPublished May 2026
Type 6 Light Rail Vehicles Siemens Mobility S700TriMetIn execution$500m–1bn
Light Rail Vehicle Fleet Replacement and ExpansionTriMetPlanned$25–100mSanctioned May 2026
Show all 6 related tenders
TenderBuyerStatusValue bandNext key date
Type 1 Traction Power Substation MAX Blue LineTriMetIn execution$25–100m
Mechanized Track Maintenance MAX System ServicesTriMetIn execution$5–25mPublished June 2023
Type 1 Substation Replacement MAX FY2027 ProgrammeTriMetPlanned$5–25mSanctioned May 2026

Browse: the Atlas · United States · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.