Eugene Layover Track Amtrak Cascades Terminus

Eugene Layover Track - layover and station track work at the southern terminus of Amtrak Cascades

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Buyer
Oregon Department of Transportation - Rail and Public Transit Division
Where
Oregon · Eugene
Segments
Track, Stations & depots
Technology areas
Track & civil
Status
Planned — Funded in part and awaiting grant decisions.
Value band
$5–25m
Currency
USD
Key dates (month)
State rail plan published for comment September 2026 · Construction window stated 2027–20

Status in full

Read more

Funded in part and awaiting grant decisions. ODOT's draft 2027 State Rail Plan lists Eugene Layover under Other Projects with the asterisk denoting pending discretionary grants, funded by federal money, Amtrak and state Connect Oregon funds. ODOT's 2025 Amtrak Cascades annual report places construction of the Eugene Layover Track in 2027-2028 pending grant approvals, alongside the Willbridge Crossovers. The plan's near-term state-identified passenger rail investments include Eugene Station Track under network mobility. No solicitation for it was open on OregonBuys on the run date.

Next step

Planned — no solicitation published.

Read the notice: Oregon Department of Transportation ↗

Withheld in the free surface

  • Full scope
  • Exact value
  • How the figure was arrived at
  • Key dates (2)
  • Published bidders

Full detail withheld: 5 fields. In the United States edition · See a fully open example

3 sources · all primary
  • ● Oregon Department of Transportation · Draft Oregon State Rail Plan 2027 (PDF, 199 pages, 15,850,098 bytes), published for comment 8 September 2026. Sections used: the existing rail system profile (two Class I railroads and 23 Class III short-line railroads, six of them switching railroads and terminal yards); the Amtrak Cascades service and rolling stock sections; the state-identified near-term and long-term passenger rail capital investments; Table 4-10 recent Oregon rail program funding 2025-2027; and Table 4-11 Connect Oregon rail funding. (published 2026-09-08 · checked 2026-09-14)
  • ● Oregon Department of Transportation · Amtrak Cascades - Oregon 2025 Annual Performance Report, ODOT Multimodal and Rail Services Unit, March 2026 (PDF, 14 pages, 1,652,526 bytes). Carries five-year Oregon ridership, customer on-time performance, the total operating cost, revenue and farebox recovery series for Oregon-funded trains 2021-2025, the 2025 accomplishments and the 2026-2028 timeline. (published 2026-03 · checked 2026-09-14)
  • ● State of Oregon (Department of Administrative Services) · OregonBuys — the statewide procurement portal, a Periscope S2G (Jaggaer) instance. The public bid search at /bso/view/search/external/advancedSearchBid.xhtml answers curl: a GET returns the JSF form with its _csrf token and javax.faces.ViewState, and a PrimeFaces partial-ajax POST to the same address with javax.faces.source=bidSearchForm:j_idt378 returns the results table inline. Searched on 14 September 2026 for rail, railroad, track, crossing, locomotive, streetcar, ballast, turnout, passenger rail, light rail, Amtrak and Coos: no rail-scope solicitation was open. (published 2026-09-14 · checked 2026-09-14)

Related tenders

Same buyer first, then the same segment in this market.

Show all 6 related tenders
TenderBuyerStatusValue bandNext key date
Green Line Riverside Inner Belt VMF Type 10MBTAOpenno package value published
Light Rail Modernization Program Tranche 3 Cromwell FacilityMDOT MTAOpenestimated cost class L: over $100 million, in MTA's own construction look-ahead of August 2026; MTA publishes no contract valuePublished July 2026
Red Line Hi-Rail Access Tunnel AlewifeMBTAOpen$25–100m

Browse: the Atlas · United States · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.