United States · State
? How to use this page
How to use a region page
- Counts and the pipeline for this region come first; the tabs list its buyers, players and tenders.
- Cities on the map open their own pages.
- Capex, pipeline value and the market narrative open with this market's edition.
North Dakota
2 buyers · 5 tenders · checked 2026-10-08
No transit rail or open tender; three federal grants and two Amtrak station projects above the floor, led by Grand Forks.
Everything here is free. One market edition opens in full with one email. Open your free edition
0Metro systems operating
2Buyers tracked
5Tenders tracked
4Cities tracked
- Live pipeline
- $30m FRA Railroad Crossing Elimination grant, Grand Forks underpass (planned); $11.77m CRISI grant, RRVW welded rail (in execution); Amtrak station projects at Rugby ($10.4m) and Williston ($10m)
- Technology areas
- Track & civil, Signalling & train control
Key figures
Grand Forks crossing grant$30m
2 sources · all primary
- ● USAspending award 69A36525420530RCEND · FRA Railroad Crossing Elimination grant to NDDOT, Grand Forks grade separation: federal $30,000,000, non-federal $20,625,000, total $50,625,000; signed 2025-07-23; period to 2030-05-31 (published 2025-07-23 · checked 2026-10-08)
- ● Senate release on the Grand Forks crossing grant · Release of 5 June 2023: $30,000,000 FY2022 Railroad Crossing Elimination grant for an underpass at 42nd Street and Demers Avenue, Grand Forks, with a shared-use path; BNSF not mentioned (published 2023-06-05 · checked 2026-10-08)
RRVW CRISI grant$11.77m
1 source · primary
- ● USAspending award 69A36524420340CRSND · FRA CRISI grant to Red River Valley & Western Railroad Co: federal $11,772,708, non-federal $2,943,177, total $14,715,885; signed 2024-03-12; period to 2027-02-01 (published 2024-03-12 · checked 2026-10-08)
Rail loan maximum$5m
2 sources · all primary
- ● NDDOT Rail Information page · Rail loan programmes (system critical, infrastructure improvement, economic development; maximum loan $5 million), railroad contact list naming BNSF, CPKC, DMVW, DNRR, NPR and RRVW, links to State Freight and Rail Plan and the Highway-Rail Grade Crossing State Action Plan (published undated · checked 2026-10-08)
- ● NDDOT State Funding Programs page · Rail Crossing Program (federal funds, 10% local match, closure match up to $7,500) and Rail Loan Program (Class I railroads not eligible); no fund size stated (published undated · checked 2026-10-08)
Amtrak station work$30m
1 source · primary
- ● Amtrak release on North Dakota station upgrades · Release of 17 October 2025: about $30 million federal funds at five Empire Builder stations; per-station figures Rugby 10.4, Williston 10, Devils Lake 4.5, Fargo 4.5, Stanley 0.4 ($m); designers and general contractors named (published 2025-10-17 · checked 2026-10-08)
Freight and rail planJan 2023
2 sources · 1 primary
- ● NDDOT Freight and Rail Plan page · Combined State Freight and Rail Plan with appendices including Passenger Rail System, Rail Projects and Freight Investment Plan; filenames dated January 2023 (published 2023-01 · checked 2026-10-08)
- ○ Progressive Railroading on the combined plan · Article of 2 February 2023: first combined freight and rail plan, work began April 2021; used because the plan PDF exceeded the fetch size. Secondary (published 2023-02-02 · checked 2026-10-08)
Buyers
| Buyer | Type | Tenders | Contracts awarded |
|---|---|---|---|
| North Dakota Department of Transportation | State DOT | 2 | 0 |
| Red River Valley & Western Railroad | Freight railroad | 1 | 0 |
Tenders
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Grand Forks 42nd Street rail underpass | NDDOT | In execution | $25–100m | |
| RRVW Casselton to Wahpeton welded rail | RRVW | In execution | $5–25m | |
| Oakes to Independence rail replacement | NDDOT | In execution | $5–25m | |
| Williston station accessibility upgrade | Amtrak | In execution | $5–25m | |
| Rugby station accessibility upgrade | Amtrak | In execution | $5–25m |
Cities
| City | Network status | Networks |
|---|---|---|
| Grand Forks | Site of the 42nd Street and Demers Avenue underpass funded by a federal crossing grant; the grant text cites delays from Grand Forks Yard train transfers on the BNSF network. Empire Builder stop. | |
| Rugby | Empire Builder station rebuilt with a new platform under an Amtrak accessibility project. | |
| Williston | Empire Builder station rebuilt with a new platform under an Amtrak accessibility project. | |
| Wahpeton | End of the RRVW track section being converted to continuous welded rail and the grantee's listed address. |
Withheld in the free surface
- Capex in this region (3)
- Live pipeline value (3)
- Market narrative
Full detail withheld: 3 fields. In the United States edition · See a fully open example
- Oakes announcement gap (2)
Full detail withheld: 1 field. In the United States edition · See a fully open example
Sources
- ● Amtrak Media newsroom · Amtrak press-release index (published 2026-10-08 · checked 2026-10-08)
- ● Amtrak release on North Dakota station upgrades · Release of 17 October 2025: about $30 million federal funds at five Empire Builder stations; per-station figures Rugby 10.4, Williston 10, Devils Lake 4.5, Fargo 4.5, Stanley 0.4 ($m); designers and general contractors named (published 2025-10-17 · checked 2026-10-08)
- ● Governor release on state funding for the Grand Forks underpass · Release of 7 March 2025: NDDOT to provide $20 million from the Flexible Transportation Fund because estimates exceeded $60 million; construction scheduled for 2026, completion 2028 (published 2025-03-07 · checked 2026-10-08)
- ● NDDOT Freight and Rail Plan page · Combined State Freight and Rail Plan with appendices including Passenger Rail System, Rail Projects and Freight Investment Plan; filenames dated January 2023 (published 2023-01 · checked 2026-10-08)
- ● NDDOT Rail Information page · Rail loan programmes (system critical, infrastructure improvement, economic development; maximum loan $5 million), railroad contact list naming BNSF, CPKC, DMVW, DNRR, NPR and RRVW, links to State Freight and Rail Plan and the Highway-Rail Grade Crossing State Action Plan (published undated · checked 2026-10-08)
- ● USAspending award 69A36520501190CRSND · FRA cooperative agreement to NDDOT titled Minot Intermodal Facility, $400,000; below the floor (published 2020-02-27 · checked 2026-10-08)
- ● USAspending award 69A36525420530RCEND · FRA Railroad Crossing Elimination grant to NDDOT, Grand Forks grade separation: federal $30,000,000, non-federal $20,625,000, total $50,625,000; signed 2025-07-23; period to 2030-05-31 (published 2025-07-23 · checked 2026-10-08)
Browse: the Atlas · United States · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.