North Dakota

2 buyers · 5 tenders · checked 2026-10-08

No transit rail or open tender; three federal grants and two Amtrak station projects above the floor, led by Grand Forks.

Everything here is free. One market edition opens in full with one email. Open your free edition

0Metro systems operating
2Buyers tracked
5Tenders tracked
4Cities tracked
Live pipeline
$30m FRA Railroad Crossing Elimination grant, Grand Forks underpass (planned); $11.77m CRISI grant, RRVW welded rail (in execution); Amtrak station projects at Rugby ($10.4m) and Williston ($10m)
Technology areas
Track & civil, Signalling & train control

Key figures

Grand Forks crossing grant$30mFRA Railroad Crossing Elimination grant to NDDOT for the Grand Forks 42nd Street underpass; total funding $50.6m on USAspending.
2 sources · all primary
  • ● USAspending award 69A36525420530RCEND · FRA Railroad Crossing Elimination grant to NDDOT, Grand Forks grade separation: federal $30,000,000, non-federal $20,625,000, total $50,625,000; signed 2025-07-23; period to 2030-05-31 (published 2025-07-23 · checked 2026-10-08)
  • ● Senate release on the Grand Forks crossing grant · Release of 5 June 2023: $30,000,000 FY2022 Railroad Crossing Elimination grant for an underpass at 42nd Street and Demers Avenue, Grand Forks, with a shared-use path; BNSF not mentioned (published 2023-06-05 · checked 2026-10-08)
RRVW CRISI grant$11.77mFRA CRISI grant to the Red River Valley & Western for continuous welded rail between mileposts 1.51 and 33.33; total funding $14.7m.
1 source · primary
  • ● USAspending award 69A36524420340CRSND · FRA CRISI grant to Red River Valley & Western Railroad Co: federal $11,772,708, non-federal $2,943,177, total $14,715,885; signed 2024-03-12; period to 2027-02-01 (published 2024-03-12 · checked 2026-10-08)
Rail loan maximum$5mMaximum NDDOT rail loan per qualifying project; Class I railroads are not eligible and no fund size is published.
2 sources · all primary
  • ● NDDOT Rail Information page · Rail loan programmes (system critical, infrastructure improvement, economic development; maximum loan $5 million), railroad contact list naming BNSF, CPKC, DMVW, DNRR, NPR and RRVW, links to State Freight and Rail Plan and the Highway-Rail Grade Crossing State Action Plan (published undated · checked 2026-10-08)
  • ● NDDOT State Funding Programs page · Rail Crossing Program (federal funds, 10% local match, closure match up to $7,500) and Rail Loan Program (Class I railroads not eligible); no fund size stated (published undated · checked 2026-10-08)
Amtrak station work$30mFederal funds Amtrak reports for accessibility work at five North Dakota Empire Builder stations, October 2025.
1 source · primary
  • ● Amtrak release on North Dakota station upgrades · Release of 17 October 2025: about $30 million federal funds at five Empire Builder stations; per-station figures Rugby 10.4, Williston 10, Devils Lake 4.5, Fargo 4.5, Stanley 0.4 ($m); designers and general contractors named (published 2025-10-17 · checked 2026-10-08)
Freight and rail planJan 2023NDDOT State Freight and Rail Plan, the first combined plan; the current rail plan.
2 sources · 1 primary
  • ● NDDOT Freight and Rail Plan page · Combined State Freight and Rail Plan with appendices including Passenger Rail System, Rail Projects and Freight Investment Plan; filenames dated January 2023 (published 2023-01 · checked 2026-10-08)
  • ○ Progressive Railroading on the combined plan · Article of 2 February 2023: first combined freight and rail plan, work began April 2021; used because the plan PDF exceeded the fetch size. Secondary (published 2023-02-02 · checked 2026-10-08)

Buyers

BuyerTypeTendersContracts awarded
North Dakota Department of TransportationState DOT20
Red River Valley & Western RailroadFreight railroad10

Tenders

Cities

CityNetwork statusNetworks
Grand ForksSite of the 42nd Street and Demers Avenue underpass funded by a federal crossing grant; the grant text cites delays from Grand Forks Yard train transfers on the BNSF network. Empire Builder stop.
RugbyEmpire Builder station rebuilt with a new platform under an Amtrak accessibility project.
WillistonEmpire Builder station rebuilt with a new platform under an Amtrak accessibility project.
WahpetonEnd of the RRVW track section being converted to continuous welded rail and the grantee's listed address.

Withheld in the free surface

  • Capex in this region (3)
  • Live pipeline value (3)
  • Market narrative

Full detail withheld: 3 fields. In the United States edition · See a fully open example

  • Oakes announcement gap (2)

Full detail withheld: 1 field. In the United States edition · See a fully open example

Sources

  • ● Amtrak Media newsroom · Amtrak press-release index (published 2026-10-08 · checked 2026-10-08)
  • ● Amtrak release on North Dakota station upgrades · Release of 17 October 2025: about $30 million federal funds at five Empire Builder stations; per-station figures Rugby 10.4, Williston 10, Devils Lake 4.5, Fargo 4.5, Stanley 0.4 ($m); designers and general contractors named (published 2025-10-17 · checked 2026-10-08)
  • ● Governor release on state funding for the Grand Forks underpass · Release of 7 March 2025: NDDOT to provide $20 million from the Flexible Transportation Fund because estimates exceeded $60 million; construction scheduled for 2026, completion 2028 (published 2025-03-07 · checked 2026-10-08)
  • ● NDDOT Freight and Rail Plan page · Combined State Freight and Rail Plan with appendices including Passenger Rail System, Rail Projects and Freight Investment Plan; filenames dated January 2023 (published 2023-01 · checked 2026-10-08)
  • ● NDDOT Rail Information page · Rail loan programmes (system critical, infrastructure improvement, economic development; maximum loan $5 million), railroad contact list naming BNSF, CPKC, DMVW, DNRR, NPR and RRVW, links to State Freight and Rail Plan and the Highway-Rail Grade Crossing State Action Plan (published undated · checked 2026-10-08)
  • ● USAspending award 69A36520501190CRSND · FRA cooperative agreement to NDDOT titled Minot Intermodal Facility, $400,000; below the floor (published 2020-02-27 · checked 2026-10-08)
  • ● USAspending award 69A36525420530RCEND · FRA Railroad Crossing Elimination grant to NDDOT, Grand Forks grade separation: federal $30,000,000, non-federal $20,625,000, total $50,625,000; signed 2025-07-23; period to 2030-05-31 (published 2025-07-23 · checked 2026-10-08)