Milwaukee Airport Rail Station second platform
Milwaukee Airport Rail Station second platform - 800-foot west platform, two elevator towers with pedestrian bridge and track surfacing
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Buyer
- Wisconsin Department of Transportation
- Where
- Wisconsin · Milwaukee
- Segments
- Stations & depots, Track, Civil works
- Technology areas
- Track & civil
- Status
- In execution — Construction has run since June 2023 and the contractor now estimates completion in October 2026.
- Value band
- $5–25m
- Currency
- USD
- Key dates (month)
- Letting April 2023 · Construction start June 2023 · Forecast completion October 2026 · Grant period extended to June 2027
Status in full
Read more
Construction has run since June 2023 and the contractor now estimates completion in October 2026. WisDOT said in June 2026 that delays came mainly from structural steel supply and that the pedestrian bridge was complete. The CRISI grant has been extended to June 2027 for closeout. The April 2023 bid summary shows Zenith Tech., Inc. as low bidder; no award notice was read.
Next step
Withheld in the free surface
- Full scope
- Exact value
- How the figure was arrived at
- Key dates (4)
- Note on the figure
Full detail withheld: 5 fields. In the United States edition · See a fully open example
4 sources · 3 primary
- ● WisDOT · Milwaukee Airport Rail Station Second Platform and Pedestrian Overpass Project page: 2017 CRISI grant, 800-foot platform, elevator towers and bridge, 0.6 miles of track surfacing, design November 2019 to December 2022, letting April 2023, construction from June 2023. Read 7 October 2026. (checked 2026-10-07)
- ● WisDOT · Milwaukee Airport Railroad Station page: station serves the Borealis and the Hiawatha service and carries the 2023 platform project notice. Read 7 October 2026. (checked 2026-10-07)
- ● WisDOT · Highway Construction Contract Information bid summary for the 11 April 2023 letting, proposal 003 (project 1000-57-70, Milwaukee Airport 2nd Platform): two bids received, Zenith Tech., Inc. Waukesha $17,251,864.16 and Lunda Construction Company $19,588,794.49. A bid summary, not an award notice. (published 2023-04-12 · checked 2026-10-07)
- ○ The Daily Reporter (USA Today Network) · Milwaukee airport Amtrak project cost doubled since groundbreaking: reports WisDOT's statements that the project cost is $23.5 million against a 2017 estimate of $10.1 million, the contractor now estimates October 2026 completion, and the CRISI grant has been extended to June 2027. Secondary: trade press repeating WisDOT's statements; WisDOT's own page carries none of these figures. (published 2026-06-25 · checked 2026-10-07)
Related tenders
Same buyer first, then the same segment in this market.
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Alcivia Hager City rail loadout (FRIIP programme) | WisDOT | Awarded | $25–100m | |
| Hiawatha West Milwaukee to Madison extension | WisDOT | Planned | $100–500m | |
| Muskego Yard freight rail bypass | WisDOT | Planned | $25–100m |
Show all 6 related tenders
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Next Generation coach and cab-coach acquisition | WisDOT | In execution | $25–100m | |
| Charger locomotive mid-life overhaul grant | WisDOT | Planned | over $140m FRA National Railroad Partnership Program grant (multi-state) | |
| Twin Cities-Milwaukee-Chicago Borealis track works | WisDOT | Planned | $25–100m |