Eau Claire Galloway Street crossing elimination

Galloway Street grade separation over the Union Pacific line, eliminating two at-grade crossings and linking the Chippewa River trail

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Buyer
City of Eau Claire
Where
Wisconsin · Eau Claire
Segments
Civil works
Technology areas
Track & civil
Status
Planned — The federal award period runs to 31 January 2029 and no construction contract is published.
Value band
$5–25m
Currency
USD
Key dates (month)
Award signed July 2025 · Period start July 2025 · Period end January 2029

Status in full

Read more

The federal award period runs to 31 January 2029 and no construction contract is published. The scope is a full life-cycle project excluding preliminary engineering. It replaces one vehicle and one pedestrian trail crossing with an overpass. The award is a federal grant to the City, not a rail operator's programme.

Next step

Planned — no solicitation published.

Read the notice: USAspending.gov (FRA award record) ↗

Withheld in the free surface

  • Full scope
  • Exact value
  • How the figure was arrived at
  • Key dates (3)

Full detail withheld: 4 fields. In the United States edition · See a fully open example

1 source · primary
  • ● USAspending.gov (FRA award record) · Railroad Crossing Elimination award 69A36525420460RCEWI to the City of Eau Claire: eliminates two at-grade crossings at Galloway Street and the Union Pacific line with an overpass linking the Chippewa River trail; $9,999,600 federal, $2,499,900 non-federal, $12,499,500 total funding; signed 23 July 2025; period 1 July 2025 to 31 January 2029. (published 2025-08-04 · checked 2026-10-08)

Related tenders

Same buyer first, then the same segment in this market.

TenderBuyerStatusValue bandNext key date
Light Rail Modernization Program Tranche 3 Cromwell FacilityMDOT MTAOpenestimated cost class L: over $100 million, in MTA's own construction look-ahead of August 2026; MTA publishes no contract valuePublished July 2026
Red Line Hi-Rail Access Tunnel AlewifeMBTAOpen$25–100m
Light Rail Metro Facilities Ancillary maintenance constructionMDOT MTAOpenestimated cost class H: $15 million to $30 million, for the matching line in MTA's own on-call master contract look-ahead of August 2026; MTA publishes no contract value
Show all 6 related tenders
TenderBuyerStatusValue bandNext key date
MARC Mechanical Ancillary maintenance construction master contractMDOT MTAOpenestimated cost class G: $10 million to $15 million, for the matching line in MTA's own on-call master contract look-ahead of August 2026; MTA publishes no contract value
CTA Red Line Extension 120th Street yard shopCTAOpenover $20m projected (CTA Buying Plan projection, not an award)Closes October 2026
MDOT Freight Rail P3 concession Maryland and DelawareMDOT MTAOpenvalue not published - MDOT publishes no figure for the concession

Browse: the Atlas · United States · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.