Camp Hall industrial rail line
Camp Hall Industrial Corridor - new freight line of about 25 miles from Ridgeville to Cross connecting the Camp Hall Commerce Park and the Volvo Cars plant to CSX
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Buyer
- Palmetto Railways
- Where
- South Carolina · Cross
- Segments
- Track, Civil works, Signalling
- Technology areas
- Track & civil, Signalling & train control
- Status
- In execution — Palmetto Railways reported the line 75 per cent complete in April 2026.
- Value band
- $100–500m
- Currency
- USD
- Key dates (month)
- Construction start May 2023 · Infra award signed January 2024 · Grant period end August 2026 · Percent complete report April 2026 · Completion expected 2026 · Signal programme bids closed July 2025 · Signal installation began 2026
Status in full
Read more
Palmetto Railways reported the line 75 per cent complete in April 2026. Its project site now expects the last construction phase to finish in fall 2026, with signal testing to follow. Phases 1 to 3 were at punch list or closeout in summer 2026, and signals were installed at seven of nine crossings.
Next step
Withheld in the free surface
- Full scope
- Exact value
- How the figure was arrived at
- Key dates (7)
- Note on the figure
Full detail withheld: 5 fields. In the United States edition · See a fully open example
6 sources · 4 primary
- ● SCDOT / FRA · South Carolina Statewide Rail Plan 2024 (Cambridge Systematics for SCDOT, November 2024) bound with the FRA acceptance letter of 8 May 2025: funding sources, projects under construction (Table 4-2), unfunded needs (Tables 4-3, 4-7, 5-1), Palmetto Railways profile, CRISI, INFRA and BUILD awards. Read 8 October 2026. (published 2025-05-08 · checked 2026-10-08)
- ● USAspending.gov (FRA award record) · FRA INFRA award 69A36524420000INFSC to SC Public Railway: $25,000,000 federal, $183,570,000 non-federal, $208,570,000 total funding; 23-mile industrial rail line from Camp Hall Commerce Park to CSX; signed 25 January 2024; period 1 November 2023 to 31 August 2026. (published 2024-01-25 · checked 2026-10-08)
- ○ Palmetto Railways · Camp Hall Industrial Corridor page, carrying the Berkeley Independent article of 3 April 2026 reposted by Palmetto Railways (trade and local press, Secondary): about 25 miles Ridgeville to Cross, $190 million, 75 per cent complete, completion expected August 2026. (published 2026-04-03 · checked 2026-10-08)
- ○ Palmetto Railways · Railway Age article of 9 April 2026 'Palmetto Railways Advances Camp Hall Industrial Project', reposted on Palmetto Railways' news page (Secondary): 25 miles, 75 per cent complete, summer 2026 target, steel ties and turnouts for 23 miles supplied by NARSTCO. (published 2026-04-09 · checked 2026-10-08)
- ● Palmetto Railways · Solicitation page 'Camp Hall Rail - Signal Program': design, installation and commissioning of nine four-quadrant warning signal systems; closed 10 July 2025; no value, number or award published. Read 8 October 2026. (published 2025-07-10 · checked 2026-10-08)
- ● Palmetto Railways · Camp Hall Rail project site, Construction page (undated; written about June to July 2026): Phase 1 substantially complete; Phases 2 and 3 at punch list with completion anticipated summer 2026; Phase 4 expected fall 2026; signal work at all nine public crossings began spring 2026 and was complete at seven; signal testing to follow substantial completion of Phases 2 to 4. No contractor named. (checked 2026-10-08)
Related tenders
Same buyer first, then the same segment in this market.
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Ashmont and Mattapan Infrastructure Upgrades | MBTA | Open | $100–500m | |
| Salkehatchie Subdivision reactivation | Palmetto Railways | In execution | $5–25m | |
| Palmetto Railways unfunded capital needs | Palmetto Railways | Planned | $25–100m |
Show all 6 related tenders
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Light Rail Modernization Program Tranche 3 Cromwell Facility | MDOT MTA | Open | estimated cost class L: over $100 million, in MTA's own construction look-ahead of August 2026; MTA publishes no contract value | Published July 2026 |
| Red Line Hi-Rail Access Tunnel Alewife | MBTA | Open | $25–100m | |
| Light Rail Metro Facilities Ancillary maintenance construction | MDOT MTA | Open | estimated cost class H: $15 million to $30 million, for the matching line in MTA's own on-call master contract look-ahead of August 2026; MTA publishes no contract value |
Browse: the Atlas · United States · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.