United States · State
? How to use this page
How to use a region page
- Counts and the pipeline for this region come first; the tabs list its buyers, players and tenders.
- Cities on the map open their own pages.
- Capex, pipeline value and the market narrative open with this market's edition.
Louisiana
7 buyers · 14 tenders · checked 2026-10-08
RTA's consent-decree streetcar works, the NOPB's yard programme, Amtrak's Mardi Gras Service and the Baton Rouge to New Orleans plan are Louisiana's rail buying programmes.
Everything here is free. One market edition opens in full with one email. Open your free edition
1Metro systems operating
7Buyers tracked
14Tenders tracked
2Cities tracked
- Live pipeline
- Baton Rouge to New Orleans passenger rail: $281.2m to $413.2m (LADOTD feasibility estimate); State Rail Plan programme: $2.14bn (2019 dollars, programme); Timber Rock Railroad CRISI: $40m federal; Mardi Gras Service operating grant: $30.9m federal (Amtrak, three states); Louisiana and North West Railroad CRISI: $27.3m (announced October 2024); RTA FTA grants: $5.49m, $7.09m and $7.18m federal; NOPB CRISI: $7.30m federal; New Orleans Rail Gateway: $53.4m short-range and $480.6m long-range lines (not summed)
- Technology areas
- Track & civil, Electrification, Signalling & train control, Rolling-stock hardware, Digital operations
Key figures
Baton Rouge to New Orleans rail estimate$281.2m to $413.2m
1 source · primary
- ● LADOTD: Baton Rouge-New Orleans Intercity Passenger Rail Feasibility Study 2023 (PDF) · Feasibility study, state project number H.015223: 80-mile route, host railroads, Table 21 capital cost expectations, Corridor ID and Federal-State Partnership applications, implementation schedule. (published 2023 · checked 2026-10-07)
State rail plan programme$2.14bn
1 source · primary
- ● LADOTD: Louisiana State Rail Plan (PDF, dated 25 August 2020) · State rail plan prepared by the University of New Orleans Transportation Institute and dated 25 August 2020; the PDF is filed on LADOTD's site under a 2020 file name although the index page calls it the 2024 plan. Table ES-1 programme of projects in 2019 dollars; grade-crossing programme. (published 2020-08-25 · checked 2026-10-07)
Gulf Coast service operating grant$30.9m
2 sources · all primary
- ● USAspending: FRA Restoration and Enhancement grant 69A36525420020RAEDC (Amtrak, New Orleans to Mobile) · Federal award record: $30,927,115 federal, non-federal $7,782,241, total $38,709,356; period 1 July 2025 to 28 February 2029; twice-daily state-supported service with six station stops sponsored by Louisiana, Mississippi and the City of Mobile. (published 2025-08-18 · checked 2026-10-07)
- ● Southern Rail Commission release: Mardi Gras Service first-quarter performance · Release of 5 December 2025: 46,000 passengers carried since the August launch, 458 a day on average. (published 2025-12-05 · checked 2026-10-07)
New Orleans streetcar fleet66 cars
1 source · primary
- ● RTA: Streetcar Modernization Master Plan, Existing Conditions Assessment executive summary · Executive summary PDF: fleet by series (900, 400 and 2000), consent decree requirements, state-of-good-repair project table with RTA internal cost estimates. (published 2026 · checked 2026-10-07)
Timber Rock CRISI grant$40m
1 source · primary
- ● USAspending: FRA CRISI grant 69A36526422820CRSLA (Timber Rock Railroad) · Federal award record: $40,000,000 federal, non-federal $10,000,000, total $50,000,000; period 1 October 2025 to 30 August 2029; about 29 bridges and track from Derider, Louisiana to Kirbyville, Texas; signed 19 February 2026. (published 2026-02-19 · checked 2026-10-07)
NOPB yard CRISI grant$7.3m
1 source · primary
- ● USAspending: FRA CRISI grant 69A36523403760CRSLA (NOPB) · Federal award record: $7,297,421 federal, non-federal $10,946,209, total $18,243,630; period 1 November 2022 to 31 December 2024; switching and railcar storage capacity. (published 2023-02-16 · checked 2026-10-07)
Buyers
| Buyer | Type | Tenders | Contracts awarded |
|---|---|---|---|
| New Orleans Regional Transit Authority (RTA) | Transit authority | 6 | 0 |
| Louisiana Department of Transportation and Development, Office of Multimodal Commerce (freight and rail) | State DOT | 4 | 0 |
| Louisiana and North West Railroad (LNW) | Freight railroad | 1 | 0 |
| New Orleans Public Belt Railroad (NOPB) | Infrastructure manager | 1 | 0 |
| Timber Rock Railroad (TIBR) | Freight railroad | 1 | 0 |
| Port of New Orleans (Port NOLA) | Development authority | 0 | 0 |
| Southern Rail Commission | Other | 0 | 0 |
Tenders
Cities
| City | Network status | Networks |
|---|---|---|
| New Orleans | operational: RTA's streetcar system (St. Charles, Canal, Riverfront and Rampart-Loyola lines, 66 cars across three series) under a federal consent decree to make the St. Charles line fully accessible; the New Orleans Public Belt Railroad links six Class I railroads at the port; Amtrak's Mardi Gras Service to Mobile began on 18 August 2025 and the Baton Rouge service is still at planning stage | RTA streetcar |
| Baton Rouge | planned: end of the proposed 80-mile Baton Rouge to New Orleans intercity passenger service, with a federal station grant for Baton Rouge and Gonzales; no passenger rail operates today; a grade-crossing grant covers five crossings on the Kansas City Southern line |
Withheld in the free surface
- Capex in this region (3)
- Market narrative
Full detail withheld: 2 fields. In the United States edition · See a fully open example
- Note
Full detail withheld: 1 field. In the United States edition · See a fully open example
Sources
- ● City of Baton Rouge release: $20 million RAISE grant for rail stations · City-Parish release of 9 August 2022: $20 million USDOT RAISE grant for real estate acquisition, design and construction of Baton Rouge and Gonzales stations; $3.25 million City-Parish match. (published 2022-08-09 · checked 2026-10-07)
- ● LADOTD: Baton Rouge to New Orleans Intercity Passenger Rail · Project page that carries the 2023 feasibility study for the corridor. (published 2026 · checked 2026-10-07)
- ● LADOTD: Baton Rouge-New Orleans Intercity Passenger Rail Feasibility Study 2023 (PDF) · Feasibility study, state project number H.015223: 80-mile route, host railroads, Table 21 capital cost expectations, Corridor ID and Federal-State Partnership applications, implementation schedule. (published 2023 · checked 2026-10-07)
- ● LADOTD: Freight and Passenger Rail · Page describing the freight network, fourteen short lines and Amtrak's three long-distance routes through New Orleans (Sunset Limited, City of New Orleans, Crescent). (published 2026 · checked 2026-10-07)
- ● LADOTD: Freight and Rail · Office of Multimodal Commerce freight and rail section: Louisiana is served by six Class I railroads and fourteen short lines; links to the rail plan, short-line study, station assessment, gateway programme and streetcar safety oversight pages. (published 2026 · checked 2026-10-07)
- ● LADOTD: New Orleans Rail Gateway Program · Gateway page: six Class I railroads and three Amtrak routes; 2011 Environmental Impact Statement temporarily suspended until funding is secured to re-evaluate passenger forecasts; smaller projects to be studied as funded. (published 2026 · checked 2026-10-07)
- ● LADOTD: Louisiana State Rail Plan (PDF, dated 25 August 2020) · State rail plan prepared by the University of New Orleans Transportation Institute and dated 25 August 2020; the PDF is filed on LADOTD's site under a 2020 file name although the index page calls it the 2024 plan. Table ES-1 programme of projects in 2019 dollars; grade-crossing programme. (published 2020-08-25 · checked 2026-10-07)
- ● LADOTD: Rail Program Resources · Index of the state rail plan (link text 2024 Louisiana State Rail Plan), the short-line economic impact analysis and the 2018 passenger station assessment. (published 2026 · checked 2026-10-07)
- ● LADOTD announcement: Class II and III rail infrastructure programme awards · Announcement of 30 November 2022: $3 million programme, $1.5 million each to the New Orleans Public Belt Railroad (transloading industrial park) and Louisiana Southern Railroad. (published 2022-11-30 · checked 2026-10-07)
- ● LADOTD: Streetcar Safety Oversight · Page headed Streetcar Safety Oversight describing the State Safety Oversight programme under 49 U.S.C. 5329(e); published under the freight and rail section. (published 2026 · checked 2026-10-07)
- ● Rail NOLA (NOPB): Bidding Opportunities · Bidding page: active procurement projects, tentative schedule, bids submitted through the Central Bidding portal; limited detail without registration. (published 2026 · checked 2026-10-07)
- ● Rail NOLA (NOPB): Board Meetings · Board page: six-member commission; Port commissioners also serve on the NOPB commission since the February 2018 alignment of the Port and the NOPB; 2026 meetings on 28 October, 19 November and 17 December. (published 2026 · checked 2026-10-07)
- ● Congressional release: $7.3 million for Port of New Orleans rail project · Release of 28 February 2020 hosted on the NOPB site: CRISI grant of about $7.3 million to upgrade switches and expand three regional rail yards for 500 more rail cars. (published 2020-02-28 · checked 2026-10-07)
- ● Rail NOLA (NOPB): press releases · Press release index with dated entries (latest 17 August 2026). (published 2026-08-17 · checked 2026-10-07)
- ● Port NOLA and NOPB release: Army Corps permit for the Louisiana International Terminal · Release of 17 August 2026: federal permit granted for the greenfield container terminal, which is described as having direct access to every major Class I railroad. (published 2026-08-17 · checked 2026-10-07)
- ● NOPB release: major infrastructure projects near completion · Release of 5 August 2024: transloading industrial park and Claiborne Yard expansion near completion; $7.29 million CRISI grant for railyard space and automated switching; $3 million transload project funded half by LADOTD. (published 2024-08-05 · checked 2026-10-07)
- ● Rail NOLA (NOPB): Our System · NOPB system page: six Class I railroads interchange with the NOPB, 26 miles of mainline and 75 miles of total track, main yard and four storage yards. (published 2026 · checked 2026-10-07)
- ● NOPB: Upcoming Projects, August 2026 (PDF) · Tentative advertisement schedule August 2026 to January 2027, including Trinity Yard Phase I construction in October 2026; no values published. (published 2026-08 · checked 2026-10-07)
- ● Port NOLA: home page · Port of New Orleans home page with links to procurement, board meetings, the master plan and Rail NOLA. (published 2026 · checked 2026-10-07)
- ○ Progressive Railroading: CRISI short-line projects by state (trade press) · Secondary: dated 12 November 2024; lists Louisiana and North West Railroad Co. $27.3 million for the McNeil Subdivision between Magnolia, Arkansas and Gibsland, Louisiana. FRA's selection page returns HTTP 403 and no USAspending record was found for this award. (published 2024-11-12 · checked 2026-10-07)
- ● RTA: Streetcar Modernization Master Plan, Existing Conditions Assessment executive summary · Executive summary PDF: fleet by series (900, 400 and 2000), consent decree requirements, state-of-good-repair project table with RTA internal cost estimates. (published 2026 · checked 2026-10-07)
- ● RTA release: connected rail improvement projects on the St. Charles line · Release of 23 July 2026 (date from the RTA news index): Carrollton Double Crossover and Harmony Circle track replacement start 27 July 2026; two temporary bus bridges. (published 2026-07-23 · checked 2026-10-07)
- ● RTA release: streetcar service restored through Harmony Circle · Release of 4 August 2026 (date from the RTA news index): Harmony Circle track replacement complete; Carrollton Double Crossover still in its initial construction phase. (published 2026-08-04 · checked 2026-10-07)
- ● RTA: News and Events index · News index with dated releases (latest 22 September 2026); used to date the two streetcar track releases. (published 2026-09-22 · checked 2026-10-07)
- ● RTA: Procurements and Contracts · Procurement page: central channel for public solicitations; active RFPs and IFBs are listed on the ProcureWare portal; vendor and DBE form library. (published 2026 · checked 2026-10-07)
- ● RTA: Current Projects · Projects index: streetcar modernization, ferry terminal, bus rapid transit, downtown transit hub, mobility hubs. (published 2026 · checked 2026-10-07)
- ● RTA: Streetcar Modernization Study · Project page: consent decree duties on the St. Charles line, the All-Stations Accessibility Program and Harmony Circle track replacement, advisory committee, open houses; last updated 8 September 2026. (published 2026-09-08 · checked 2026-10-07)
- ● Southern Rail Commission: Baton Rouge to New Orleans · Project page: planned stops, August 2022 RAISE award, March 2023 Corridor ID applications, March 2024 Interstate Rail Compacts award of $400,000, Canadian Pacific as owner of the existing infrastructure. (published 2026 · checked 2026-10-07)
- ● Southern Rail Commission release: federal funding for passenger rail corridors · Release of 8 December 2023: Corridor Identification and Development Program, $500,000 each to LADOTD (Baton Rouge to New Orleans) and to the Commission (Mobile to New Orleans; I-20). (published 2023-12-08 · checked 2026-10-07)
- ● Southern Rail Commission release: Mardi Gras Service first-quarter performance · Release of 5 December 2025: 46,000 passengers carried since the August launch, 458 a day on average. (published 2025-12-05 · checked 2026-10-07)
- ● Southern Rail Commission: home page · Commission home page: member states Alabama, Louisiana and Mississippi; Mardi Gras Service, Baton Rouge to New Orleans and I-20 projects. (published 2026 · checked 2026-10-07)
- ● Southern Rail Commission release: Mardi Gras Service launch · Release of 1 July 2025: Amtrak announced an 18 August start date for the New Orleans to Mobile service. (published 2025-07-01 · checked 2026-10-07)
- ● USAspending: FRA CRISI grant 69A36525421340CRSDC (Amtrak, City of New Orleans crossing study) · Federal award record: $1,826,000 federal for a study of 395 highway-rail crossings on the City of New Orleans route through Mississippi and Louisiana; below the floor. (published 2024-12-13 · checked 2026-10-07)
- ● USAspending: FRA Restoration and Enhancement grant 69A36525420020RAEDC (Amtrak, New Orleans to Mobile) · Federal award record: $30,927,115 federal, non-federal $7,782,241, total $38,709,356; period 1 July 2025 to 28 February 2029; twice-daily state-supported service with six station stops sponsored by Louisiana, Mississippi and the City of Mobile. (published 2025-08-18 · checked 2026-10-07)
- ● USAspending: FRA grant 69A36524420000STELA (Baton Rouge sealed corridor) · Federal award record: $1,100,000 federal, total $1,504,310; five crossings on the KCS New Orleans Subdivision in Baton Rouge; period 1 March 2024 to 31 July 2026. Below the floor; used for the left-out list. (published 2024-06-05 · checked 2026-10-07)
- ● USAspending: FRA CRISI grant 69A36522403230CRSLA (Louisiana and North West Railroad) · Federal award record: $3,420,224 federal for a 2,100-foot Union Pacific interchange siding; period 31 January 2022 to 31 March 2024; below the floor. (published 2022-01-31 · checked 2026-10-07)
- ● USAspending: FRA CRISI grant 69A36523403760CRSLA (NOPB) · Federal award record: $7,297,421 federal, non-federal $10,946,209, total $18,243,630; period 1 November 2022 to 31 December 2024; switching and railcar storage capacity. (published 2023-02-16 · checked 2026-10-07)
- ● USAspending: MARAD PIDP grant 693JF72040025 (Port of South Louisiana, Globalplex) · Federal award record: $5,895,021 federal of $20,901,228 total; heavy-load floor, conveyors, 0.5-mile rail spur, dock access bridge; used for the left-out list. (published 2023-09-18 · checked 2026-10-07)
- ● USAspending: FTA grant LA-2026-014 (All Stations Accessibility Program, St. Charles line) · Federal award record: $5,492,524 federal, non-federal $1,373,134, total $6,865,658; period 14 July 2026 to 31 May 2029. Stands in for transit.dot.gov (HTTP 403). (published 2026-07-14 · checked 2026-10-07)
- ● USAspending: FTA grant LA-2024-011 (RTA rail and HOV preventive maintenance, capital items) · Federal award record: $7,182,249 federal, total $8,977,812; period 3 April 2024 to 30 October 2027; includes a tamping machine and phase 4 of the St. Charles loop project. (published 2024-04-03 · checked 2026-10-07)
- ● USAspending: FTA grant LA-2023-001 (RTA rail state of good repair) · Federal award record: $7,086,296 federal, total $8,857,872; period 24 April 2023 to 31 December 2026; rail line and shop equipment, traction power substation repair, Carrollton double crossover, St. Charles loop. (published 2023-04-24 · checked 2026-10-07)
- ● USAspending: FTA grant LA-2025-004 (RTA, includes Union Passenger Terminal second-floor renovation) · Federal award record: $14,500,000 federal; bus and ferry preventive maintenance, generators and the Union Passenger Terminal second-floor renovation; not carried as a tender because the rail share is not separated. (published 2025-04-29 · checked 2026-10-07)
- ● USAspending: FRA CRISI grant 69A36526422820CRSLA (Timber Rock Railroad) · Federal award record: $40,000,000 federal, non-federal $10,000,000, total $50,000,000; period 1 October 2025 to 30 August 2029; about 29 bridges and track from Derider, Louisiana to Kirbyville, Texas; signed 19 February 2026. (published 2026-02-19 · checked 2026-10-07)
Browse: the Atlas · United States · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.