United States · State
? How to use this page

How to use a region page

  1. Counts and the pipeline for this region come first; the tabs list its buyers, players and tenders.
  2. Cities on the map open their own pages.
  3. Capex, pipeline value and the market narrative open with this market's edition.

Arkansas

5 buyers · 3 tenders · checked 2026-10-08

Freight-and-streetcar market: federal grants to two ports and a short line, no state rail fund, no commuter or metro rail.

Everything here is free. One market edition opens in full with one email. Open your free edition

0Metro systems operating
5Buyers tracked
3Tenders tracked
4Cities tracked
Rock Region METRO's 3.4-mile, three-car streetcar, Amtrak's daily Texas Eagle and 25 freight railroads; no metro, light rail or commuter railRail systems note
Live pipeline
DeQueen and Eastern FRA grant $11.83m (announced 2023, shared with Oklahoma); Helena Harbor MARAD grant $6.41m (signed 4 May 2026); Little Rock port CRISI $5.57m (complete 3 June 2026); programme: Section 130 about $4m a year
Technology areas
Track & civil, Electrification

Key figures

Arkansas freight network2,600+ milesFreight network in the 2025 State Rail Plan: 25 freight railroads, about 60 percent of the mileage owned and operated by three Class I railroads and 22 Class III railroads on the rest.
1 source · primary
  • ● 2025 Arkansas State Rail Plan, executive summary · 25 freight railroads over 2,600 miles, about 60 percent owned by three Class I railroads; Texas Eagle ridership 28,000 in 2023 and 37,000 in 2024; Section 130 and 32 projects; ARDOT does not finance, own, operate or maintain rail infrastructure (published 2025-08 · checked 2026-10-08)
Texas Eagle riders 202437,000Amtrak Texas Eagle passengers in Arkansas in 2024, up from 28,000 in 2023; one daily train each way over Union Pacific track, six stations, Little Rock busiest.
1 source · primary
  • ● 2025 Arkansas State Rail Plan, executive summary · 25 freight railroads over 2,600 miles, about 60 percent owned by three Class I railroads; Texas Eagle ridership 28,000 in 2023 and 37,000 in 2024; Section 130 and 32 projects; ARDOT does not finance, own, operate or maintain rail infrastructure (published 2025-08 · checked 2026-10-08)
Section 130 funding$4 million a yearApproximate federal Section 130 crossing funding to ARDOT, enough for five to eight projects a year; 32 Section 130 projects were being developed with railroads in 2025.
2 sources · all primary
  • ● 2025 Arkansas State Rail Plan (full plan, August 2025) · Full plan: no dedicated state freight or passenger rail funding programme; Section 130 about $4 million a year; Little Rock Port Authority CRISI project; DeQueen and Eastern CRISI 2023; 91 LRITP rail projects of $1.72 billion with no funding; no Corridor ID applications from Arkansas (published 2025-08 · checked 2026-10-08)
  • ● 2025 Arkansas State Rail Plan, executive summary · 25 freight railroads over 2,600 miles, about 60 percent owned by three Class I railroads; Texas Eagle ridership 28,000 in 2023 and 37,000 in 2024; Section 130 and 32 projects; ARDOT does not finance, own, operate or maintain rail infrastructure (published 2025-08 · checked 2026-10-08)
State rail fundingNone dedicatedThe 2025 State Rail Plan says Arkansas has no dedicated state funding programme for freight or passenger rail; the Governor's Quick Action Closing Fund has been used case by case.
1 source · primary
  • ● 2025 Arkansas State Rail Plan (full plan, August 2025) · Full plan: no dedicated state freight or passenger rail funding programme; Section 130 about $4 million a year; Little Rock Port Authority CRISI project; DeQueen and Eastern CRISI 2023; 91 LRITP rail projects of $1.72 billion with no funding; no Corridor ID applications from Arkansas (published 2025-08 · checked 2026-10-08)
Little Rock port CRISI$5,569,373FRA FY2021 CRISI selection for the Little Rock Port Authority's track and engine facility, opened 3 June 2026.
2 sources · 1 primary
DeQueen and Eastern grant$11,830,000FRA grant announced 25 September 2023 for the DeQueen and Eastern Railroad, shared with its Oklahoma partner line and not apportioned.
1 source · primary

Buyers

Tenders

TenderBuyerStatusValue bandNext key date
Helena Harbor rail spur and water towerHelena HarborAwarded$5–25m
Little Rock port track and engine facilityPort of Little RockIn execution$5–25mCompletion 2025
DeQueen and Eastern track and bridge upgradesDQEPlanned$5–25mAnnounced September 2023

Cities

CityNetwork statusNetworks
Little RockStreetcar and intercity rail: the three-car METRO Streetcar crosses the Arkansas River to North Little Rock, Amtrak's daily Texas Eagle stops at Union Station (the state's busiest station), and the Port of Little Rock runs its own switching railroad connecting Union Pacific and BNSF. ARDOT's headquarters is here.METRO Streetcar; Amtrak Texas Eagle
JonesboroFreight rail only: the BNSF Thayer South Subdivision runs through the city; a federal planning grant covers 18 crossings on the subdivision and the city holds an earlier CRISI industrial-lead grant.
Helena-West HelenaFreight rail at a river port: Helena Harbor owns 7 miles of rail switched by Arkansas Midland, and a federal port grant funds a new 1.1-mile spur to the Helm fertilizer terminal.
De QueenFreight rail only: the DeQueen and Eastern Railroad, a Class III short line in southwest Arkansas, is the recipient of a 2023 federal rail grant shared with its Oklahoma partner line.

Withheld in the free surface

  • Capex in this region (3)
  • Live pipeline value (3)
  • Market narrative

Full detail withheld: 3 fields. In the United States edition · See a fully open example

  • Note
  • Unfunded plan (2)
  • Intermodal authorities (2)

Full detail withheld: 3 fields. In the United States edition · See a fully open example

Sources

  • ● ARDOT Project Coordination (Railroad Coordination Section) · ARDOT page: the Railroad Coordination Section administers the Railway-Highway Crossing Program (Section 130) and coordinates highway work inside railroad right of way; lists the 2015 State Rail Plan and the 2020 Arkansas High Speed Passenger Rail Study (published undated · checked 2026-10-08)
  • ● ARDOT contracts awarded, letting of 23 September 2026 (revised) · Awards list dated 1 October 2026: job 070458, UPRR Grade Separation (east of Lafayette Co. line), Route 82, Columbia County, District 7, Mobley Contractors, Inc., $27,033,828.20 (published 2026-10-01 · checked 2026-10-08)
  • ● 2025 Arkansas State Rail Plan, executive summary · 25 freight railroads over 2,600 miles, about 60 percent owned by three Class I railroads; Texas Eagle ridership 28,000 in 2023 and 37,000 in 2024; Section 130 and 32 projects; ARDOT does not finance, own, operate or maintain rail infrastructure (published 2025-08 · checked 2026-10-08)
  • ● 2025 Arkansas State Rail Plan (full plan, August 2025) · Full plan: no dedicated state freight or passenger rail funding programme; Section 130 about $4 million a year; Little Rock Port Authority CRISI project; DeQueen and Eastern CRISI 2023; 91 LRITP rail projects of $1.72 billion with no funding; no Corridor ID applications from Arkansas (published 2025-08 · checked 2026-10-08)
  • ● FRA CRISI FY2021 selections (Wayback Machine copy of railroads.dot.gov file) · Lists Arkansas - Freight Rail Capacity Improvement Project, Little Rock Port Authority, up to $5,569,373, 11,215 feet of track and an engine maintenance facility, 25 percent applicant match. railroads.dot.gov returns 403 to curl, so the Wayback copy of the FRA file was read (published 2022-06 · checked 2026-10-08)
  • ● FRA CRISI FY2022 selections: project summaries (Wayback Machine copy) · Lists Arkansas - Resilient Infrastructure & Safety Enhancement Project, DeQueen and Eastern Railroad, LLC, up to $11,830,000, with the Texas, Oklahoma and Eastern Railroad; 30 percent applicant match (published 2023-09-25 · checked 2026-10-08)
  • ○ KARK: Arkansas to receive $11.8 million in rail improvement funding · Trade-press report of 25 September 2023: FRA announced $11,830,000 for the DeQueen and Eastern Railroad covering the DQE and the Texas, Oklahoma and Eastern Railroad, final design and construction. Secondary; FRA's own page returns 403 Corroborates the FRA list (published 2023-09-25 · checked 2026-10-08)
  • ○ Progressive Railroading: new depot reinforces Port of Little Rock Railroad's role · Trade-press report of 10 July 2026: grand opening of the rail depot on 3 June 2026, construction started 2025, FY2021 CRISI grant of up to $5.6 million, three locomotives housed, dual Union Pacific and BNSF service. Secondary (published 2026-07-10 · checked 2026-10-08)
  • ● Rock Region METRO: streetcar · Agency page: METRO Streetcar is a 3.4-mile system between Little Rock and North Little Rock with three historic replica streetcars and 10 operators, about 100,000 riders a year (published undated · checked 2026-10-08)
  • ● USAspending: MARAD Port Infrastructure Development award 693JF72344025 · Federal record: Helena-West Helena-Phillips County Port Authority, federal $6,412,652, total funding $7,125,169, water tower and a rail spur of about 1.1 miles to the Helm fertilizer terminal, period 4 May 2026 to 30 August 2030 (published 2026-05-04 · checked 2026-10-08)

Browse: the Atlas · United States · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.