2TDK, Družba za razvoj projekta, d.o.o.

This week: Slovenia's 2TDK tests the Vinjan viaduct on the second track with heavy trains. (2026-09-28)

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the European Union edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Type
State SPV — single-purpose project company wholly owned by the State, founded 31 March 2016 by the Government of the Republic of Slovenia to build the Divača–Koper second track and to manage it for the duration of the concession contract; share capital €533,478,326.34
Market · Region
European Union · Slovenia
Open tenders
0
Technology areas
Track & civil, Electrification, Signalling & train control, Digital operations, Predictive maintenance, AI inspection

Delivers 27.1 km Divača–Koper second track with seven tunnels and three viaducts for 160/120 km/h with ERTMS.

About this buyer

Read more

Delivery of the Divača–Koper second track, which 2TDK describes as “največjega infrastrukturnega projekta v Sloveniji” — the largest infrastructure project in Slovenia — in its news release of 3 July 2025, attributing that recognition to CINEA: 27.1 km of new single track between the Ljubljana–Sežana corridor at Divača and the Port of Koper, with seven tunnels totalling 20.5 km and three viaducts totalling 1,251 m, designed for 160 km/h for passenger trains and 120 km/h for freight at 3 kV DC with ERTMS, 60 E1 rail, predominantly slab track, a maximum gradient of 17 per mille and category D4 axle load. In operation the company is remunerated from the new line's track-access charge, an increased track-access charge and an availability payment from the State. It is also taking the parallel left track — the second tube of the project — through design and environmental documentation.

Type
State SPV — single-purpose project company wholly owned by the State, founded 31 March 2016 by the Government of the Republic of Slovenia to build the Divača–Koper second track and to manage it for the duration of the concession contract; share capital €533,478,326.34
Where
Slovenia · Koper
Programmes
Connecting Europe Facility, ERTMS / ETCS, TEN-T
Technology areas
Track & civil, Electrification, Signalling & train control, Digital operations, Predictive maintenance, AI inspection

Structure

  • funded by MzIE — The State contributes to the Divača–Koper second track — of base capital and funded from the road-toll surcharge paid annually into 2TDK's capital — and in operation pays 2TDK an availability payment– a year under the concession contract, on a no-availability-no-payment basis, financed from a levy on cargo transhipment at the Port of Koper and a toll surcharge on heavy goods vehicles (active · since 2016)

Who holds what here

  • awarded ELEA IC — 2TDK Divača–Koper parallel left track design — ELEA IC projektiranje in svetovanje d.o.o. (active · since 2025-09)
  • awarded IRGO — 2TDK Divača–Koper parallel left track design — IRGO CONSULTING d.o.o. (active · since 2025-09)
  • awarded SŽ-PPL — 2TDK Divača–Koper parallel left track design — SŽ - PROJEKTIVNO PODJETJE LJUBLJANA d.d. (active · since 2025-09)
  • awarded Siemens Mobility — Automatic block signalling for the new Divača–Koper line, awarded to Siemens Mobility GmbH with SIEMENS Mobility d.o.o., contract 43/2024 of 4 October 2024 (active · since 2024-10-04)
  • awarded GH Holding — 2TDK Koper interlocking ETCS reconfiguration — GH HOLDING storitvena družba d.o.o. (active · since 2024-05)
  • awarded GH Holding — 2TDK Divača–Koper railway tunnel systems — GH HOLDING storitvena družba d.o.o. (active · since 2023-09)
  • awarded Kolektor — 2TDK Divača–Koper railway tunnel systems — KOLEKTOR IGIN Inženiring, storitve in trgovina d.o.o. (active · since 2023-09)
  • awarded SŽ-ŽGP — 2TDK Divača–Koper railway tunnel systems — SŽ - ŽELEZNIŠKO GRADBENO PODJETJE LJUBLJANA d.d. (active · since 2023-09)
  • awarded Kolektor — 2TDK Divača–Koper excavated material disposal — KOLEKTOR CESTNO PODJETJE NOVA GORICA, Družba za vzdrževanje in gradnjo cest, d.o.o. (active · since 2021-10)
  • awarded ELEA IC — 2TDK Divača–Koper technical construction monitoring — ELEA IC projektiranje in svetovanje d.o.o. (active · since 2021-05)
  • awarded IRGO — 2TDK Divača–Koper technical construction monitoring — IRGO CONSULTING d.o.o. (active · since 2021-05)
  • awarded Kolektor — 2TDK Divača–Črni Kal second track section 1 — KOLEKTOR CESTNO PODJETJE NOVA GORICA, Družba za vzdrževanje in gradnjo cest, d.o.o. (active · since 2021-05)
  • awarded Özaltın — 2TDK Divača–Črni Kal second track section 1 — Ozaltin Insaat Ticaret Ve Sanayi A.S. (active · since 2021-05)
  • awarded Yapı Merkezi — 2TDK Divača–Črni Kal second track section 1 — Yapi Merkezi Inşaat ve Sanayi, A.Ş. (active · since 2021-05)
  • awarded Kolektor — 2TDK Črni Kal–Koper second track section 2 — KOLEKTOR CESTNO PODJETJE NOVA GORICA, Družba za vzdrževanje in gradnjo cest, d.o.o. (active · since 2021-03)
  • awarded Özaltın — 2TDK Črni Kal–Koper second track section 2 — Ozaltin Insaat Ticaret Ve Sanayi A.S. (active · since 2021-03)
  • awarded Yapı Merkezi — 2TDK Črni Kal–Koper second track section 2 — Yapi Merkezi Inşaat ve Sanayi, A.Ş. (active · since 2021-03)
  • awarded Projekt — 2TDK Divača–Koper construction supervision engineering — PROJEKT D.D. NOVA GORICA Podjetje za inženiring, geodezijo, urbanizem in projektiranje (active · since 2020-11)
  • awarded ELEA IC — 2TDK Divača–Koper detailed design BIM — ELEA IC projektiranje in svetovanje d.o.o. (active · since 2019-06)
  • awarded IRGO — 2TDK Divača–Koper detailed design BIM — IRGO CONSULTING d.o.o. (active · since 2019-06)
  • awarded SŽ-PPL — 2TDK Divača–Koper detailed design BIM — SŽ - PROJEKTIVNO PODJETJE LJUBLJANA d.d. (active · since 2019-06)
Sources for these relationships (30)
  • ● Portal javnih naročil (enarocanje.si) · Notice record 006832/2019-EUe39/01-P01 (idObrazec 894060) of 7 March 2025 — the portal's mirror of TED notice 152279-2025 — read through the portal's JSON API: idObrazecPrej 893531 (the record for TED notice 147812-2025, itself flagged popravljenSPopravkom, corrected by a corrigendum), popravekOpis “popravek vrednosti (brez DDV)”, vrednostSkupna 403613361.12, eFormsFolderIdent c5b79028-e24b-44e7-979b-f053d2ff1fb4 (checked 2026-09-13)
  • ● Portal javnih naročil (enarocanje.si) · Notice record 008005/2019-EUe39/03 (idObrazec 1082226) of 11 May 2026 — the portal's record of TED notice 321686-2026 — read through the portal's JSON API: spremembaOpis “naročilo nepredvidenih del - izvedba vodnjakov V1 - V6, sprememba pogodbene vrednosti, sprememba roka izvedbe”, vrednostPosodobljenaSkupna 403613361.12 and vrednostPoSpremembah 419460435.62 (checked 2026-09-13)
  • ● 2TDK, Družba za razvoj projekta, d.o.o. · Vrednost investicije in viri financiranja: total investment value of the Drugi tir project €928 million excluding VAT in constant January 2021 prices and €940 million in current prices; initial investment costs €1,109 million in current prices plus €30 million of 2TDK operating costs and €33 million of interest, fees and other financing costs, so “Celoten znesek financiranja v tekočih cenah brez DDV tako znaša 1.172 mio EUR”. Sources: state contribution €507 million (€400 million of base capital plus €107 million funded from the road-toll surcharge paid annually into the company's capital), EU grants €362 million, an EIB loan of €250 million, with the remainder from bank loans and the increased track-access charge. In operation 2TDK is paid the second track's track-access charge, the increased track-access charge and an availability payment from the Republic of Slovenia of €31–41 million a year on a “brez dosegljivosti, brez plačila” (no availability, no payment) basis under the concession contract, financed from a levy on cargo transhipment at the Port of Koper and a toll surcharge on heavy goods vehicles. Economic appraisal: ENPV €408 million, EIRR 8.36%, benefit–cost ratio 2.17. Capacity stated as rising from 90 to 231 trains a day and from 14 to 43 million tonnes a year (published 2026 · checked 2026-09-13)
  • ● 2TDK, Družba za razvoj projekta, d.o.o. · O družbi in osebna izkaznica: Železna cesta 18, 1000 Ljubljana; registration number 7096283000, VAT identification SI91611369; founded 31 March 2016; share capital €533,478,326.34; “projektno podjetje za razvoj drugega tira … v 100-odstotni lasti države. Ustanovila jo je Vlada Republike Slovenije marca 2016”; owner: the Republic of Slovenia. General desk +386 (0)1 306 84 00 and info@2-tdk.si; media mailbox drugitir@2-tdk.si (published 2026 · checked 2026-09-13)
  • ● 2TDK, Družba za razvoj projekta, d.o.o. · News, 4 September 2026: “Od gradbišča do železniške proge” — the line is physically complete, with track laid, overhead line installed and viaducts and tunnels finished, and construction sites being reinstated; the Glinščica valley remains an active worksite for ground-stabilisation works. What remains is the final electrical and mechanical assembly, systems testing and integration of power supply, signalling, telecommunications, fire safety and ventilation, and the technical inspections for the use and operating permits. No opening date is stated (published 2026-09-04 · checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — Zavarovanje nove proge Divača - Koper z APB napravami, contract-award notice, winning tender €5,790,000.00 against an estimate of €6,060,075.00 — notice 626577-2024 (checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — Izdelava PZI projektov v BIM okolju za izgradnjo drugega tira železniške proge Divača - Koper, contract-modification notice for contract 11/2019, €17,499,000.00 — notice 203039-2025 (checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — contract-modification notice for contract 11/2019 (detailed design in BIM), carrying winning tender €17,499,000.00 and naming ELEA IC, SŽ-Projektivno podjetje Ljubljana and IRGO Consulting — notice 252354-2026 of 14 April 2026 (checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — Preureditev obstoječega SV zavarovanja na postaji Koper tovorna in ETCS naprave, contract-award notice, winning tender €12,234,505.05 against an estimate of €11,240,587.15 — notice 359767-2024 (checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — contract-modification notice for contract 24/2024 (Koper tovorna interlocking and ETCS), carrying winning tender €12,234,505.05 and naming GH Holding with Thales Austria — notice 249875-2026 of 13 April 2026 (checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — Preureditev obstoječega SV zavarovanja na postaji Koper tovorna in ETCS naprave, voluntary ex-ante transparency notice — notice 277142-2024 (checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — Izdelava projektne in okoljske dokumentacije za vzporedni levi tir železniške proge Divača – Koper PONOVLJENI POSTOPEK, contract-award notice, winning tender €23,804,282.70 — notice 615648-2025 (checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — Izdelava projektne in okoljske dokumentacije za vzporedni levi tir, the two contract notices for the repeat procedure JN-5/2025 setting the tender deadline at 23 July 2025 against an estimate of €24,291,401.52: notices 395366-2025 of 18 June and 449788-2025 of 10 July 2025 (checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — Izdelava projektne in okoljske dokumentacije za vzporedni levi tir železniške proge Divača – Koper, contract-award notice recording clos-nw because all tenders were rejected (all-rej), one tender received; no value field populated — notice 395454-2025 (checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — Tehnično opazovanje pri gradnji drugega tira železniške proge Divača - Koper, contract-modification notice for contract 19/2021, €13,917,666.00 — notice 267210-2026 (checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — Gradnja objektov drugega tira železniške proge - odsek 1: Divača - Črni Kal, contract-award notice, total value €403,613,361.12 — notice 245066-2021 (checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — Gradnja objektov drugega tira železniške proge - odsek 1: Divača - Črni Kal, contract-modification notice (extension of the completion date), winning tender €403,613,361.12 — notice 715274-2024 (checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — GRADNJA OBJEKTOV DRUGEGA TIRA ŽELEZNIŠKE PROGE - ODSEK 1: DIVAČA-ČRNI KAL, contract-modification notice for contract 15/2021 carrying winning tender €492,408,300.56 — notice 147812-2025 (checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — GRADNJA OBJEKTOV DRUGEGA TIRA ŽELEZNIŠKE PROGE - ODSEK 1: DIVAČA-ČRNI KAL, contract-modification notice of the following day for the same contract 15/2021, carrying winning tender €403,613,361.12 — notice 152279-2025 (checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — third March 2025 contract-modification notice for contract 15/2021 (second track, section 1 Divača–Črni Kal), carrying winning tender €403,613,361.12 and total value €403,613,361.12 — notice 149495-2025 of 7 March 2025 (checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — Gradnja objektov drugega tira železniške proge - odsek 1: Divača - Črni Kal, contract-modification notice (unforeseen works, wells V1–V6, change of contract value and time) — notice 321686-2026 (checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — Gradnja objektov drugega tira železniške proge - odsek 2: Črni Kal - Koper, contract-modification notice for contract 16/2021 (changed geological, geomechanical and hydrogeological conditions), €224,749,369.00 — notice 428693-2024 (checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — contract-modification notice for the second track section 2, carrying winning tender €224,749,369.00 — notice 549937-2025 of 22 August 2025 (checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — Gradnja objektov drugega tira železniške proge - odsek 2: Črni Kal - Koper, contract-modification notice of 11 May 2026 — notice 322618-2026 (checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — contract-modification notices for contract 16/2021 (second track, section 2 Črni Kal–Koper) published in March 2025, each carrying winning tender €224,749,369.00: notices 147932-2025 of 6 March, 151720-2025 and 151939-2025 of 7 March 2025 (checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — Zagotovitev ustreznega odlagalnega prostora in predelava viškov materiala drugega tira železniške proge Divača-Koper, contract-modification notice for contract 39/2021, €14,652,638.60 — notice 264359-2026 (checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — contract-modification notice for contract 39/2021 (disposal site and processing of surplus excavated material), carrying winning tender €14,652,638.60 and naming Kolektor CPG with VOC Ekologija — notice 266208-2026 of 20 April 2026 (checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — Nadzor in druge inženirske storitve pri gradnji drugega tira železniške proge Divača - Koper, contract-modification notice for contract 54/2020, €17,718,723.26 — notice 266864-2026 (checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — Železniški in predorski sistemi na drugem tiru Divača - Koper, contract-award notice, total value €203,800,754.29 — notice 551173-2023 (checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — Železniški in predorski sistemi na drugem tiru Divača - Koper, contract-modification notice for contract 27/2023 — notice 479093-2025 (checked 2026-09-13)

Tenders

TenderStatusValue bandNext key date
2TDK Divača–Koper parallel left track designAwarded$25–100mAwarded September 2025
2TDK Divača–Koper second track, two sections · 2 partsIn execution$100–500m each part (USD)
2TDK Divača–Črni Kal second track section 1In execution$100–500mAwarded May 2021
2TDK Črni Kal–Koper second track section 2In execution$100–500mAwarded March 2021
2TDK Divača–Koper railway tunnel systemsIn execution$100–500mAwarded September 2023
2TDK Divača–Koper automatic block signallingIn execution$5–25mAwarded October 2024
2TDK Divača–Koper construction supervision engineeringIn execution$5–25mAwarded November 2020
2TDK Divača–Koper detailed design BIMIn execution$5–25mAwarded June 2019
2TDK Divača–Koper excavated material disposalIn execution$5–25mAwarded October 2021
2TDK Koper interlocking ETCS reconfigurationIn execution$5–25mAwarded May 2024
2TDK Divača–Koper technical construction monitoringIn execution$5–25mAwarded May 2021

What changed

From This Week in Rail, newest first.

  • 2026-09-28 — Slovenia's 2TDK tests the Vinjan viaduct on the second track with heavy trains.

Withheld in the free surface

  • Procurement structure
  • Award history (12)
  • Entry path
  • Portals (4)
  • Published contacts (4)

Full detail withheld: 5 fields. In the European Union edition · See a fully open example

19 sources · all primary
  • ● 2TDK, Družba za razvoj projekta, d.o.o. · O družbi in osebna izkaznica: Železna cesta 18, 1000 Ljubljana; registration number 7096283000, VAT identification SI91611369; founded 31 March 2016; share capital €533,478,326.34; “projektno podjetje za razvoj drugega tira … v 100-odstotni lasti države. Ustanovila jo je Vlada Republike Slovenije marca 2016”; owner: the Republic of Slovenia. General desk +386 (0)1 306 84 00 and info@2-tdk.si; media mailbox drugitir@2-tdk.si (published 2026 · checked 2026-09-13)
  • ● 2TDK, Družba za razvoj projekta, d.o.o. · O nas: “projektno podjetje v 100-odstotni lasti države” (a project company wholly owned by the State), established by the Government of the Republic of Slovenia in March 2016 to build the second track and to manage it for the duration of the concession contract; registered office Železna cesta 18, 1000 Ljubljana (published 2026 · checked 2026-09-13)
  • ● 2TDK, Družba za razvoj projekta, d.o.o. · Javna naročila in pozivi: “Vsa javna naročila družbe 2TDK … so objavljena na portalu javnih naročil in/ali tej spletni strani. … Vsa vprašanja, povezana z razpisno dokumentacijo, se lahko posreduje izključno preko portala javnih naročil.” The page carries the company's current and recent procedures, including archaeological test excavation for the parallel left track, the BIM supervisor and the design and environmental documentation for the left track, expert review and geodetic and expropriation services (published 2026 · checked 2026-09-13)
  • ● 2TDK, Družba za razvoj projekta, d.o.o. · Tehnični podatki: the Divača–Koper second track is 27.1 km of single track, design speed up to 160 km/h, 60 E1 rail, predominantly slab track, maximum gradient 17‰, axle load 225 kN/axle or 80 kN/m (category D4), 3 kV DC traction, ERTMS. Seven tunnels totalling 20.5 km (T1 Lokev 6,714 m, T2 Beka 6,017 m, T3 Stepani 335 m, T4 Tinjan 1,949 m, T5-6 Osp 505 m, T7 Mlinarji 1,154 m, T8 Škofije 3,808 m) and three viaducts totalling 1,251 m (Glinščica 215 m, Gabrovica 416 m, Vinjan 620 m) (published 2026 · checked 2026-09-13)
  • ● 2TDK, Družba za razvoj projekta, d.o.o. · Vrednost investicije in viri financiranja: total investment value of the Drugi tir project €928 million excluding VAT in constant January 2021 prices and €940 million in current prices; initial investment costs €1,109 million in current prices plus €30 million of 2TDK operating costs and €33 million of interest, fees and other financing costs, so “Celoten znesek financiranja v tekočih cenah brez DDV tako znaša 1.172 mio EUR”. Sources: state contribution €507 million (€400 million of base capital plus €107 million funded from the road-toll surcharge paid annually into the company's capital), EU grants €362 million, an EIB loan of €250 million, with the remainder from bank loans and the increased track-access charge. In operation 2TDK is paid the second track's track-access charge, the increased track-access charge and an availability payment from the Republic of Slovenia of €31–41 million a year on a “brez dosegljivosti, brez plačila” (no availability, no payment) basis under the concession contract, financed from a levy on cargo transhipment at the Port of Koper and a toll surcharge on heavy goods vehicles. Economic appraisal: ENPV €408 million, EIRR 8.36%, benefit–cost ratio 2.17. Capacity stated as rising from 90 to 231 trains a day and from 14 to 43 million tonnes a year (published 2026 · checked 2026-09-13)
  • ● 2TDK, Družba za razvoj projekta, d.o.o. · Home page: capacity of the Divača–Koper link stated as rising from 90 to 212 trains a day and from 12.7 to 36.9 million tonnes a year, with passenger journey time falling from 45 to 17 minutes (published 2026 · checked 2026-09-13)
  • ● 2TDK, Družba za razvoj projekta, d.o.o. · News, 4 September 2026: “Od gradbišča do železniške proge” — the line is physically complete, with track laid, overhead line installed and viaducts and tunnels finished, and construction sites being reinstated; the Glinščica valley remains an active worksite for ground-stabilisation works. What remains is the final electrical and mechanical assembly, systems testing and integration of power supply, signalling, telecommunications, fire safety and ventilation, and the technical inspections for the use and operating permits. No opening date is stated (published 2026-09-04 · checked 2026-09-13)
  • ● 2TDK, Družba za razvoj projekta, d.o.o. · News, 10 September 2026: “Drugi tir kljub inflaciji ostaja znotraj prvotnega finančnega okvira” — two contract amendments of €8.9 million (section 2) and €17 million (bundle 3); the original investment programme value is cited as €1.150 billion and the project is described as in the closing phase of construction (published 2026-09-10 · checked 2026-09-13)
  • ● 2TDK, Družba za razvoj projekta, d.o.o. · News, 8 December 2023: the European Investment Bank provides €250 million for the Slovenian second track, signed 8 December 2023, complementing Connecting Europe Facility and cohesion funding (published 2023-12-08 · checked 2026-09-13)
  • ● 2TDK, Družba za razvoj projekta, d.o.o. · News, 10 September 2026: geological and geomechanical investigations are under way in the Glinščica valley for the parallel left track (published 2026-09-10 · checked 2026-09-13)
  • ● European Commission — EU Funding & Tenders Portal · Project 101232933, “Deployment of the ERTMS – track side equipment on the second track Divača-Koper”, beneficiary 2TDK d.o.o., call CEF-T-2024-SIMOBGEN, topic CEF-T-2024-SIMOBGEN-ERTMS-UNITS, start 21 January 2025, status ongoing; the portal's awarded-budget and overall-budget fields are empty for this record (published 2025 · checked 2026-09-13)
  • ● European Commission — EU Funding & Tenders Portal · Project 101228928, “Second Track Divača-Koper – Installation Works (Major Part of SET 3)”, beneficiary 2TDK d.o.o., call CEF-T-2024-CORECOEN, topic CEF-T-2024-CORECOEN-RAIL-WORKS, start 20 January 2025, status ongoing; the portal's awarded-budget and overall-budget fields are empty for this record (published 2025 · checked 2026-09-13)
  • ● Portal javnih naročil (enarocanje.si) · Buyer registration numbers (matična številka) as published on the portal's notice records, read through its JSON API on 13 September 2026: MINISTRSTVO ZA INFRASTRUKTURO IN ENERGETIKO, DIREKCIJA REPUBLIKE SLOVENIJE ZA INFRASTRUKTURO 2633060000; SLOVENSKE ŽELEZNICE, d.o.o. 5142733000; Slovenske železnice - Infrastruktura, d.o.o. 6017177000; Slovenske železnice - Potniški promet, d.o.o. 6017274000; Slovenske železnice - Tovorni promet, d.o.o. 6017231000; SŽ - Vleka in tehnika, d.o.o. 5865824000; 2TDK, Družba za razvoj projekta, d.o.o. 7096283000 (published 2026 · checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — Izdelava projektne in okoljske dokumentacije za vzporedni levi tir železniške proge Divača – Koper PONOVLJENI POSTOPEK, contract-award notice, winning tender €23,804,282.70 — notice 615648-2025 (checked 2026-09-13)
  • ● Tenders Electronic Daily (TED) · 2TDK d.o.o. — Preureditev obstoječega SV zavarovanja na postaji Divača, contract-award notice 288137-2024 of 16 May 2024: €4,147,211.92 to SIEMENS Mobility d.o.o. and Siemens Mobility GmbH against an estimate of €4,559,347.70, preceded by ex-ante notice 200105-2024 of 5 April 2024; Izvajanje zunanje kontrole kakovosti pri izgradnji drugega tira železniške proge Divača–Koper: odsek 1 in 2, contract-modification notice 267414-2026 of 20 April 2026, €4,505,258.59, contractors Zavod za gradbeništvo Slovenije, IGMAT d.d. and Gradbeni inštitut ZRMK d.o.o. (checked 2026-09-13)
  • ● 2TDK, Družba za razvoj projekta, d.o.o. · News, 3 July 2025: CINEA awarded the project “dodatnih 156 milijonov EUR” of CEF grants; “Skupna vrednost vseh dodeljenih nepovratnih evropskih sredstev na projektu Drugi tir do danes znaša 390 mio evrov”, which is €101 million more than the NIP-2 investment programme had assumed. The same item is where 2TDK publishes the superlative, describing the project as “največjega infrastrukturnega projekta v Sloveniji” — the largest infrastructure project in Slovenia — and attributing that recognition to CINEA (published 2025-07-03 · checked 2026-09-13)
  • ● 2TDK, Družba za razvoj projekta, d.o.o. · “Zakaj drugi tir”: this is the page that attaches time periods to the capacity figures and reconciles them. “Po končani gradnji drugega tira se … prepustna zmogljivost modernizirane obstoječe proge poveča z 90 na 102 vlaka na dan, prevozna pa s 14 na 17,7 milijona neto ton na leto … zmogljivost nove proge oz. drugega tira 120 vlakov na dan oz. 25,7 milijona neto ton na leto. Zmogljivost obeh prog (obstoječega in drugega tira) pa se bo iz dosedanjih 90 vlakov na dan povečala na 212 vlakov na dan oz. 36,9 milijona ton na leto.” The home page prints 212 and 36.9 with no time period at all (checked 2026-09-13)
  • ● Portal javnih naročil (enarocanje.si) · Notice record 006832/2019-EUe39/01-P01 (idObrazec 894060) of 7 March 2025 — the portal's mirror of TED notice 152279-2025 — read through the portal's JSON API: idObrazecPrej 893531 (the record for TED notice 147812-2025, itself flagged popravljenSPopravkom, corrected by a corrigendum), popravekOpis “popravek vrednosti (brez DDV)”, vrednostSkupna 403613361.12, eFormsFolderIdent c5b79028-e24b-44e7-979b-f053d2ff1fb4 (checked 2026-09-13)
  • ● Portal javnih naročil (enarocanje.si) · Notice record 008005/2019-EUe39/03 (idObrazec 1082226) of 11 May 2026 — the portal's record of TED notice 321686-2026 — read through the portal's JSON API: spremembaOpis “naročilo nepredvidenih del - izvedba vodnjakov V1 - V6, sprememba pogodbene vrednosti, sprememba roka izvedbe”, vrednostPosodobljenaSkupna 403613361.12 and vrednostPoSpremembah 419460435.62 (checked 2026-09-13)