Galleria di Base del Brennero – Brenner Basistunnel BBT SE
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the European Union edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Type
- High-speed rail SPV — bi-national project company (Societas Europaea, founded 16 Dec 2004): ÖBB-Infrastruktur 50%, Italian holding TFB 50% (RFI 89.857%); seat Innsbruck and Bolzano
- Market · Region
- European Union · Austria
- Open tenders
- 0
- Technology areas
- Signalling & train control, Track & civil, Electrification, Digital operations, Cybersecurity, AI inspection
Plans and builds 55 km Brenner base tunnel between Innsbruck and Fortezza; 96% excavated, €10.5bn total cost.
About this buyer
Read more
Plans and builds the 55 km Brenner base tunnel between Innsbruck and Fortezza (64 km with the Inn valley tunnel): about 96% of the 230 km tunnel system excavated; total project cost forecast €10.5bn (2023); the 2032 commissioning date is under review pending an updated construction programme.
- Type
- High-speed rail SPV — bi-national project company (Societas Europaea, founded 16 Dec 2004): ÖBB-Infrastruktur 50%, Italian holding TFB 50% (RFI 89.857%); seat Innsbruck and Bolzano
- Where
- Austria · Innsbruck
- Programmes
- Connecting Europe Facility, TEN-T, ERTMS / ETCS
- Technology areas
- Signalling & train control, Track & civil, Electrification, Digital operations, Cybersecurity, AI inspection
Structure
- owned by ÖBB-Infrastruktur — 50% (the Italian holding TFB, RFI 89.857%, holds the other 50%) (active · since 2004)
Sources for these relationships (1)
- ● Galleria di Base del Brennero – Brenner Basistunnel BBT SE · Company (shareholders, founding) (published 2026 · checked 2026-09-11)
Tenders
| Tender | Status | Value band | Next key date |
|---|---|---|---|
| BBT Brenner base tunnel, 55 km, railway equipment | In execution | over $1bn | Completion 2032 |
Withheld in the free surface
- Procurement structure
- Award history (1)
- Entry path
- Portals (3)
- Published contacts (1)
Full detail withheld: 5 fields. In the European Union edition · See a fully open example
8 sources · 6 primary
- ● Galleria di Base del Brennero – Brenner Basistunnel BBT SE · Company (shareholders, founding) (published 2026 · checked 2026-09-11)
- ● Galleria di Base del Brennero – Brenner Basistunnel BBT SE · Project overview (55 km tunnel, 64 km with Inn valley tunnel) (published 2026 · checked 2026-09-11)
- ● Galleria di Base del Brennero – Brenner Basistunnel BBT SE · Project progress (km excavated, lots) (published 2026 · checked 2026-09-11)
- ● Galleria di Base del Brennero – Brenner Basistunnel BBT SE · Nach Genehmigung der Prognose für die Gesamtprojektkosten Refinanzierungsanträge gestellt (newsroom) (published 2023-05-02 · checked 2026-09-11)
- ○ Südtirol News · BBT-Betrieb 2032 wird in Frage gestellt — Bauprogramm-Aktualisierung (published 2026-03-10 · checked 2026-09-11)
- ● Parlament Österreich — Parlamentskorrespondenz · Verkehrsminister legt aktualisierten ÖBB-Rahmenplan 2027-2032 für Ausbau des Schienennetzes vor (PK0614) (published 2026-06-24 · checked 2026-09-11)
- ○ ORF Tirol · Baukosten für BBT steigen auf 10,5 Mrd. Euro (published 2023-05-03 · checked 2026-09-11)
- ● Galleria di Base del Brennero – Brenner Basistunnel BBT SE · Transparente Verwaltung — Ausschreibungen (electronic tender database on vemap) (published 2026 · checked 2026-09-12)