Austria

12 buyers · 36 tenders · checked 2026-10-03

ÖBB Rahmenplan 2027-2032 fixes €19.5bn infrastructure; Koralmbahn opened December 2025; Semmering tunnel 2030, Brenner 96% excavated 2032; ÖBB taking 130 trains 2026-2027; Vienna U2xU5 metro.

Everything here is free. One market edition opens in full with one email. Open your free edition

1Metro systems operating
12Buyers tracked
36Tenders tracked
Live pipeline
Six open rail competitions on 13 Sept 2026, none with a published value (Austrian rail buyers publish none); €13.4bn of rail public service contracts and a €19.5bn Rahmenplan are the priced frame, with €1.1bn of valued ÖBB-Infrastruktur turnout frameworks and €754m of Wiener Linien U5 civil lots the largest single procurements tracked
Technology areas
Track & civil, Electrification, Signalling & train control, Rolling-stock hardware, Predictive maintenance, Digital operations, Cybersecurity, AI inspection

Key figures

ÖBB Rahmenplan 2027–2032€19.5 billionÖBB Rahmenplan 2027–2032 — federal rail infrastructure investment, adopted 17 June 2026 (€3.0–3.8bn a year)
2 sources · all primary
ÖBB-Infrastruktur rail network…4,875 km · 1,046 stationsÖBB-Infrastruktur rail network and stations; about 18,400 employees
1 source · primary
  • ● ÖBB-Infrastruktur AG · Company (network, stations, employees, ownership) (published 2026 · checked 2026-09-11)
Koralmbahn Graz–Klagenfurt in p…14 December 2025Koralmbahn Graz–Klagenfurt in passenger service: 130 km new line, 33 km Koralmtunnel; ÖBB press release gives 45 minutes Graz–Klagenfurt, unsereoebb.at 41 minutes by RJX; cost forecast €6.139bn (Rechnungshof, end-2023)
4 sources · all primary
  • ● ÖBB-Holding AG · Koralmbahn: Noch 200 Tage bis zur Inbetriebnahme (press release) (published 2025-05-27 · checked 2026-09-11)
  • ● ÖBB-Holding AG · Die neue Koralmbahn — Südstrecke (unsereoebb.at) (published 2025 · checked 2026-09-11)
  • ● Rechnungshof Österreich · Rechnungshof veröffentlichte Bericht 'Projekt Koralmbahn' (published 2025-04-04 · checked 2026-09-11)
  • ● ÖBB-Holding AG · ÖBB Bilanz 2025: Plus bei Fahrgästen, Rezession drückt ÖBB-Ergebnis (press release) (published 2026-04-17 · checked 2026-09-11)
Brenner base tunnel (55 km): 22…96% excavatedBrenner base tunnel (55 km): 221 of 230 km of tunnel system excavated; cost forecast €10.5bn (2023); 2032 commissioning under review
3 sources · 2 primary
ÖBB ETCS Level 2 strategy: new-…3,700 km by 2038ÖBB ETCS Level 2 strategy: new-build lines to 2026, TEN-T corridors by 2030, core network by 2038 — Siemens Mobility €400m framework, 21 radio block centres
2 sources · all primary
  • ● ÖBB-Infrastruktur AG · ETCS Ausbau — ETCS expansion strategy to 2038 (published 2026 · checked 2026-09-11)
  • ● Siemens Mobility · Siemens Mobility and ÖBB digitize Austria's rail network (press release) (published 2023-08-22 · checked 2026-09-11)
Semmering base tunnel (27 km2030Semmering base tunnel (27 km, Gloggnitz–Mürzzuschlag): ÖBB's page says 'from 2029' and '2030 first trains'; excavation complete
1 source · primary

Buyers

Tenders

TenderBuyerStatusValue bandNext key date
ÖBB-Infrastruktur Lieboch–Köflach line upgrade, lot 15ÖBB-InfrastrukturOpenno value published — ÖBB-Infrastruktur publishes values only at award, never on a contract noticeCloses October 2026
ÖBB-Infrastruktur Klammtunnel modernisation, Loifarn–DorfgasteinÖBB-InfrastrukturOpenno value published — ÖBB-Infrastruktur publishes values only at award, never on a contract noticeCloses October 2026
Wiener Linien U5 stage 2 construction sections · 2 partsWiener LinienBids closedVaries by part
Wiener Linien U5 stage 2, sections 5B–8Wiener LinienBids closed$500m–1bnPublished October 2025
Wiener Linien U5 section U5/4 Arne-Karlsson-ParkWiener LinienBids closed$100–500mPublished October 2025
Wiener Linien U5 stage 2, building-strengthening packageWiener LinienBids closedno value published on this notice — Wiener Linien publishes none for this packageBids closed September 2026 · award expected
ÖBB-Infrastruktur Traiskirchen Aspangbahn station rebuildÖBB-InfrastrukturBids closedno value published — ÖBB-Infrastruktur publishes values only at award, never on a contract noticeBids closed September 2026 · award expected
ÖBB-Infrastruktur Völs station rebuild, step-free accessÖBB-InfrastrukturBids closedno value published — ÖBB-Infrastruktur publishes values only at award, never on a contract noticeBids closed September 2026 · award expected
ÖBB-Infrastruktur Salzach bridge renewal, Bruck-FuschÖBB-InfrastrukturBids closedno value published — ÖBB-Infrastruktur publishes values only at award, never on a contract noticeBids closed September 2026 · award expected
ÖBB-Personenverkehr EMU framework, Isar-Noris-AltmühlÖBB-PersonenverkehrAwarded$500m–1bnPublished February 2025
Rail Cargo Austria double-deck car-carrier wagonsRail Cargo AustriaAwarded$100–500mPublished February 2026
ÖBB-Infrastruktur Linz–Marchtrenk four-track upgrade, section 2ÖBB-InfrastrukturAwarded$100–500mPublished October 2025
ÖBB-Infrastruktur mechanised track renewal frameworkÖBB-InfrastrukturAwarded$100–500mPublished February 2026
ÖBB-Infrastruktur tamping, levelling, stabilisation frameworkÖBB-InfrastrukturAwarded$100–500mPublished April 2026
ÖBB-Infrastruktur turnout prestressed-concrete sleepers frameworkÖBB-InfrastrukturAwarded$100–500mPublished March 2026
ÖBB-Infrastruktur Hinterstoder–Pießling-Vorderstoder double-tracking, south sectionÖBB-InfrastrukturAwarded$25–100mPublished August 2026
ÖBB-Infrastruktur Vienna S-Bahn, Rennweg–Wien MitteÖBB-InfrastrukturAwarded$25–100mPublished September 2025
ÖBB-Infrastruktur catenary installation framework, three regional lotsÖBB-InfrastrukturAwarded$25–100mPublished August 2026
ÖBB-Personenverkehr day and night coaches, 3rd modificationÖBB-PersonenverkehrAwarded$25–100mPublished July 2026
ÖBB-Personenverkehr single-deck EMU, 2nd modificationÖBB-PersonenverkehrAwarded$25–100mPublished May 2026
Salzburg Linien Salzburger Lokalbahn interlocking adaptationsSalzburg AGAwarded$5–25mPublished October 2025
Wiener Lokalbahnen Badner Bahn catenary framework 2026–2028Wiener LokalbahnenAwarded$5–25mPublished April 2026
ÖBB-Infrastruktur Lavanttal 20 MW frequency converterÖBB-InfrastrukturAwarded$5–25mPublished June 2026
ÖBB-Infrastruktur Semmering base tunnel catenary installationÖBB-InfrastrukturAwarded$5–25mPublished August 2026
ÖBB-Infrastruktur Semmering tunnel overhead conductor-rail systemÖBB-InfrastrukturAwarded$5–25mPublished December 2025
BBT Brenner base tunnel, 55 km, railway equipmentBBT SEIn executionover $1bnCompletion 2032
SCHIG Styria public service contractSCHIGIn executionover $1bnPublished January 2024
SCHIG Upper Austria public service contractSCHIGIn executionover $1bnPublished January 2024
SCHIG eastern public service contract, ÖBB-PersonenverkehrSCHIGIn executionover $1bnPublished January 2024
ÖBB-Infrastruktur turnouts and crossings framework, six lotsÖBB-InfrastrukturIn executionover $1bnPublished June 2024
ÖBB-Personenverkehr Stadler KISS, 76 double-deck trainsÖBB-PersonenverkehrIn executionover $1bn
SCHIG Graz-Köflacher Bahn public service contractSCHIGIn execution$500m–1bnPublished January 2024
Salzburg AG Salzburger Lokalbahn ETCS Level 2 frameworkSalzburg AGIn execution$100–500mAwarded December 2024
ÖBB-Infrastruktur ETCS Level 2 framework to 2038ÖBB-InfrastrukturIn execution$100–500mAwarded August 2023
ÖBB-Infrastruktur Koralmtunnel railway equipment, general contractor 1ÖBB-InfrastrukturIn execution$100–500m
ÖBB-Infrastruktur turnout main components framework, three lotsÖBB-InfrastrukturIn execution$100–500mPublished June 2024
ÖBB-Infrastruktur Rahmenplan 2027–2032 federal investment programmeÖBB-InfrastrukturPlannedover $1bn

Cities

CityNetwork statusNetworks
Viennaoperational — U-Bahn (U2xU5 expansion under construction, U5 automated from 2030), trams, S-Bahn trunk rebuild; ÖBB seatWiener U-Bahn (Wiener Linien); Badner Bahn (Wiener Lokalbahnen); Vienna S-Bahn (ÖBB)
Grazoperational — trams (Innenstadtentlastung opened Nov 2025, 31 Flexity from 2026); Koralmbahn to Klagenfurt since Dec 2025Graz trams (Graz Linien); Koralmbahn / S-Bahn Steiermark (ÖBB)
Linzoperational — trams and trolleybuses; Regional-Stadtbahn (S6/S7) in planning; Westbahn Linz–Wels four-trackingLinz trams (LINZ AG LINIEN); Regional-Stadtbahn Linz (Schiene OÖ, planned)
Innsbruckoperational — trams and Regionalbahn (Rum reached 2023, Völs branch planned); Brenner base tunnel north portalInnsbruck trams / Regionalbahn (IVB); Brenner base tunnel (BBT SE, under construction)
Salzburgoperational — Salzburger Lokalbahn and trolleybuses; S-Link underground extension refused by referendum (Nov 2024)Salzburger Lokalbahn (Salzburg AG)

Players with a footprint here

PlayerKindFootprint
SwietelskyTrack & electrification contractorProject presence
STRABAGCivil contractorHeadquarters
voestalpine RSTrack technology supplierHeadquarters, Plant
Plasser & TheurerTrack technology supplierHeadquarters
Rhomberg SersaTrack & electrification contractorHeadquarters
PORRCivil contractorProject presence
ÖBBOperator groupHeadquarters
GranitCivil contractorProject presence
EuroptenTrack & electrification contractorHeadquarters
HABAUCivil contractorProject presence
ELLRolling-stock lessorHeadquarters
FrauscherSignalling & systemsHeadquarters

What changed

From This Week in Rail, newest first.

  • 2026-09-28 — ÖBB's Semmering Base Tunnel moves into full-scale installation of the tunnel's technical equipment.
  • 2026-09-21 — ÖBB completes an upgrade of its Unterinntal tunnels.
  • 2026-09-21 — ÖBB begins rebuilding Straßwalchen station.
  • 2026-09-21 — Austria's mobility ministry secures funding for the electrification of the Zillertalbahn, Pinzgauer Lokalbahn and Murtalbahn narrow-gauge lines.

Withheld in the free surface

  • Capex in this region (3)
  • Market narrative

Full detail withheld: 2 fields. In the European Union edition · See a fully open example

  • Rahmenplan profile
  • Fleet programme
  • Semmering cost
  • Methodology note

Full detail withheld: 4 fields. In the European Union edition · See a fully open example

Sources

  • ● Bundesministerium für Innovation, Mobilität und Infrastruktur (BMIMI) · Ausbauplan ÖBB — Rahmenplan (§ 42 Bundesbahngesetz, annuity model) (published 2026 · checked 2026-09-11)
  • ● Bundesministerium für Innovation, Mobilität und Infrastruktur (BMIMI) · Bundesregierung beschließt ÖBB-Rahmenplan 2027–2032 (press release) (published 2026-06-17 · checked 2026-09-11)
  • ○ ORF Niederösterreich · Semmering-Basistunnel verzögert sich erneut (2030; 3.9 bn) (published 2022-04-15 · checked 2026-09-11)
  • ● ÖBB-Holding AG · ÖBB Bilanz 2025: Plus bei Fahrgästen, Rezession drückt ÖBB-Ergebnis (press release) (published 2026-04-17 · checked 2026-09-11)
  • ● ÖBB-Holding AG · ÖBB Flotte — fleet investment to 2030 (published 2026 · checked 2026-09-11)
  • ● ÖBB-Infrastruktur AG · Rahmenplan 2027–2032 (published 2026 · checked 2026-09-11)
  • ● ÖBB-Holding AG · Mehr Railjets der neuen Generation für den wachsenden Tagesfernverkehr (press release) (published 2025-07-10 · checked 2026-09-11)
  • ○ ORF Salzburg · Bevölkerung spricht sich gegen S-Link aus (referendum result) (published 2024-11-10 · checked 2026-09-11)
  • ● Parlament Österreich — Parlamentskorrespondenz · Verkehrsminister legt aktualisierten ÖBB-Rahmenplan 2027-2032 für Ausbau des Schienennetzes vor (PK0614) (published 2026-06-24 · checked 2026-09-11)
  • ● Rechnungshof Österreich · Rechnungshof veröffentlichte Bericht 'Projekt Koralmbahn' (published 2025-04-04 · checked 2026-09-11)
  • ● Siemens Mobility · Siemens Mobility and ÖBB digitize Austria's rail network (press release) (published 2023-08-22 · checked 2026-09-11)
  • ○ Südtirol News · BBT-Betrieb 2032 wird in Frage gestellt — Bauprogramm-Aktualisierung (published 2026-03-10 · checked 2026-09-11)
  • ● Tenders Electronic Daily (TED) · ÖBB-Infrastruktur AG — Austria – Railway construction works – (ProVia-ID 130429) Rahmenvertrag Stopfarbeiten im gesamten Normalspurstreckennetz — notice 230735-2026 (published 2026-04-03 · checked 2026-09-11)
  • ● Tenders Electronic Daily (TED) · WIENER LINIEN GmbH & Co KG — Austria – Construction work – Konstruktiver Ingenieurbau, Tunnelbau, Gleisbau - BAUABSCHNITTE U5/5B bis U5/8 — notice 683798-2025 (published 2025-10-17 · checked 2026-09-11)
  • ● Stadt Wien — Presse-Service · Öffi-Ausbau U2xU5 leistet Beitrag zur Budgetkonsolidierung und bleibt gesichert (new timetable) (published 2025-11-12 · checked 2026-09-11)

Browse: the Atlas · European Union · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.