Every field-level change on the free surface of the Atlas in the last 90 days, as at 18 November 2026, from the refresh pipeline. Exact values and dates change too, but they are shown only inside editions.

European Union

82 changes in 90 days.

DateRecordFieldFromTo
18 November 2026SJMandateSweden's state-owned passenger train company: awarded the Västtågen operating and maintenance contract (about SEK 12bn,…Sweden's state-owned passenger train company: awarded the Västtågen operating and maintenance contract (about SEK 12bn,…
18 November 2026SL / Region StockholmMandateOwns and procures Stockholm's public transport: an 11-year metro operating contract with Connecting Stockholm (about SE…Owns and procures Stockholm's public transport: an 11-year metro operating contract with Connecting Stockholm (about SE…
18 November 2026MM Milan metro partially underground railwayStatusOpenBids closed
18 November 2026MM Milan metro partially underground railwayStatus detailBids due 15 October 2026 after a published deadline extension. TED notice 522601-2026 (28 July 2026, 'PROROGA DEL TERMI…Bids due 6 November 2026 after a second published deadline extension. TED notice 687887-2026 (6 October 2026, 'PROROGA…
18 November 2026Trafikverket Almedal Borås BEST upgradeStatusOpenBids closed
18 November 2026Trafikverket Almedal Borås BEST upgradeStatus detailCall for competition published September 2026 (negotiated procedure with prior call); deadline for receipt of requests…Call for competition published September 2026 (negotiated procedure with prior call); deadline for receipt of requests…
18 November 2026DB InfraGO GMT 2027 package 6Sources{'ted_t_de_infrago_gmt2027_paket6_751510': {'name': 'Tenders Electronic Daily (TED)', 'doc': "DB Netz AG (Bukr 16) — GM…—
18 November 2026DB InfraGO GMT 2027 package 6StatusOpenBids closed
18 November 2026DB InfraGO GMT 2027 package 6Status detailOpen for bids; submission deadline November 2026. DB InfraGO publishes no value.Submission deadline extended by corrigendum (751510-2026) to 9 November 2026, now passed. DB InfraGO publishes no value…
18 November 2026DB InfraGO GMT 2027 package 6Ted t de infrago gmt2027 paket6 751510—{'name': 'Tenders Electronic Daily (TED)', 'doc': "DB Netz AG (Bukr 16) — GMT 2027 Paket 6, 4 Lose (26GMT87122), change…
18 November 2026VRR NWL Rhein-Emscher-Express RE 3 franchiseStatusOpenBids closed
18 November 2026VRR NWL Rhein-Emscher-Express RE 3 franchiseStatus detailOpen for bids to 6 November 2026. The notice of 1 October 2026 extended the date from 5 October, the third extension on…The notice of 1 October 2026 extended the date from 5 October, the third extension on this procedure. The authorities p…
18 November 2026ÖBB-Infrastruktur Lieboch–Köflach line upgrade, lot 15StatusOpenBids closed
18 November 2026ÖBB-Infrastruktur Lieboch–Köflach line upgrade, lot 15Status detailOpen for bids; submission deadline October 2026. ÖBB-Infrastruktur publishes no value on any of its contract notices —…Submission deadline October 2026. ÖBB-Infrastruktur publishes no value on any of its contract notices — 525 of them sin…
18 November 2026ZSSK class 361 and 362 locomotives overhaulStatus detailNegotiated procedure with a prior call; deadline for requests to participate 30 September 2026, now passed. Two lots, e…Negotiated procedure with a prior call; deadline for requests to participate extended by corrigendum 670850-2026 to 202…
18 November 2026ZSSK class 361 and 362 locomotives overhaulStatusOpenBids closed
18 November 2026ZSSK class 361 and 362 locomotives overhaulStatus detailNegotiated procedure with a prior call; deadline for requests to participate September 2026, so the market is still ope…Negotiated procedure with a prior call; deadline for requests to participate 30 September 2026, now passed. Two lots, e…
18 November 2026DRSI single passenger information system SloveniaStatusOpenBids closed
18 November 2026DRSI single passenger information system SloveniaStatus detailOpen procedure A-17/26, contract notice 624149-2026 of September 2026; tenders due October 2026, opening the same day a…Open procedure A-17/26, contract notice 624149-2026 of September 2026. The contract is an eight-year framework agreemen…
11 November 2026DB InfraGO permanent-way repair frameworks wave 1StatusOpenBids closed
11 November 2026DB InfraGO permanent-way repair frameworks wave 1Status detailOpen for bids; submission deadline October 2026. The figure is the framework maximum published on the notice under eFor…Submission deadline October 2026. The figure is the framework maximum published on the notice under eForms BT-271 — the…
11 November 2026DB InfraGO Schadschwellenprogramm GoS Südost 2027StatusOpenBids closed
11 November 2026DB InfraGO Schadschwellenprogramm GoS Südost 2027Status detailOpen for bids; submission deadline October 2026. DB InfraGO publishes no value.Submission deadline October 2026. DB InfraGO publishes no value; no award on Tenders Electronic Daily (TED) as of 2026-…
11 November 2026SPL Grand Est Infrastructures technical assistance frameworkStatusOpenBids closed
11 November 2026SPL Grand Est Infrastructures technical assistance frameworkStatus detailTenders due 23 October 2026; the notice was published 16 September 2026.Tenders due 23 October 2026; the notice was published 16 September 2026; no award on Tenders Electronic Daily (TED) as…
11 November 2026DB InfraGO Rahmenvereinbarung iBS II traffic controlStatusOpenBids closed
11 November 2026DB InfraGO Rahmenvereinbarung iBS II traffic controlStatus detailOpen for requests to participate; deadline October 2026. Negotiated procedure with a prior call for competition. DB Inf…Negotiated procedure with a prior call for competition. DB InfraGO publishes no value; participation deadline extended…
11 November 2026FerrovieNord Regio Express-Transfrontaliero fleet frameworkStatusOpenBids closed
11 November 2026FerrovieNord Regio Express-Transfrontaliero fleet frameworkStatus detailBids due 27 October 2026; no award on TED as of 3 October 2026. A separate procedure from the cancelled framework of Ma…Bids due 27 October 2026; no award on TED as of 3 October 2026. A separate procedure from the cancelled framework of Ma…
11 November 2026SDES-NG remote signalling input output systemStatusOpenBids closed
11 November 2026SDES-NG remote signalling input output systemStatus detailBids close 26 October 2026; the notice publishes no value.Bids close 26 October 2026; the notice publishes no value; participation deadline 2026-10-26; no award on Tenders Elect…
11 November 2026Bayonne Allées Marines track regenerationStatusOpenBids closed
11 November 2026Bayonne Allées Marines track regenerationStatus detailBids close 30 October 2026; the notice publishes no value.Bids close 30 October 2026; the notice publishes no value; participation deadline 2026-10-30; no award on Tenders Elect…
11 November 2026Operation and maintenance of drainage and geotechnical assetsStatusOpenBids closed
11 November 2026Operation and maintenance of drainage and geotechnical assetsStatus detailContract notice published September 2026; tenders due October 2026Contract notice published September 2026; tenders due October 2026; participation deadline 2026-11-05; no award on Tend…
11 November 2026Tallinna Linnatransport eleven trams option elevenStatusOpenBids closed
11 November 2026Tallinna Linnatransport eleven trams option elevenStatus detailCompetitive procedure with negotiation, buyer reference 299391. The notice current on TED on the run date is 549650-202…Competitive procedure with negotiation, buyer reference 299391. The notice current on TED on the run date is 549650-202…
11 November 2026BEG second Munich S-Bahn contract 2. MSBVStatusOpenBids closed
11 November 2026BEG second Munich S-Bahn contract 2. MSBVStatus detailRequests to participate close 30 October 2026; no contract value is published and the notice gives scope instead.Requests to participate close 30 October 2026; no contract value is published and the notice gives scope instead; parti…
7 November 2026Provincies Overijssel Gelderland Zutphen-Hengelo-Oldenzaal concessionStatusPlannedCancelled
7 November 2026Provincies Overijssel Gelderland Zutphen-Hengelo-Oldenzaal concessionStatus detailNotice of intention to award directly (provincies Overijssel and Gelderland) published April 2026, after a voluntary ex…The December 2025 ex-ante transparency notice named Arriva Personenvervoer Nederland B.V. as the intended holder at abo…
7 November 2026NetherlandsSummary lineProRail 7,000 km (ERTMS Tranche 1 €3.8bn constructing); NS orders Stadler/CAF (€400m+, €600m+); Amsterdam RET 38 metros…ProRail 7,000 km (ERTMS Tranche 1 €3.8bn constructing); NS orders Stadler/CAF (€400m+, €600m+); Rotterdam RET 38 metros…
7 November 2026NetherlandsLive or recent tenders tracked3031
7 November 2026_metaNotesFourth EU region. All six tenders are TED records with published values; Adif's programme envelope is trade press (Seco…Fourth EU region. All six tenders are TED records with published values. Caution on Euskal Trenbide Sarea notices: ETS…
7 November 2026_metaBoundary noteSpain footprint: Adif/Adif AV and Renfe (Madrid seat), FGC and Metro de Madrid, ETS. Regional operators (Euskotren, FGV…Spain footprint: Adif/Adif AV and Renfe (Madrid seat), FGC and Metro de Madrid, ETS. Not yet carried: Renfe Mercancias…
7 November 2026rel_adif_awarded_siemens_mobilityLabelRailway equipment maintenance — Siemens Rail Automation (€64.6m, June 2026)Safety-installation maintenance support, LOT-0001 of seven - Siemens Rail Automation, one of six lot holders (EUR 20.57…
7 November 2026rel_metro_madrid_awarded_alstomLabelSignalling/CBTC upgrade — Alstom Movilidad (€69.0m, May 2026)Line 6 signalling and CBTC upgrade - Alstom Movilidad (EUR 69.0m, contract concluded January 2025)
7 November 2026rel_metro_madrid_awarded_alstomSince2026-052025-01
7 November 2026rel_pkp_intercity_awarded_newag_overhaul_2026_10LabelFourth-level periodic overhaul of rolling stock — NewagFourth-level (P4) periodic overhaul of ten rail vehicles, PLN 43,169,138.20 — Newag
7 November 2026rel_pkp_intercity_awarded_newag_overhaul_2026_10Since2026-10-192026-10-15
7 November 2026rel_pkp_plk_awarded_alstomLabelRailway equipment major repair — Alstom Polska (PLN 112.8m, January 2026)Major repair of Alstom-built electric point machines, 2026–2029, PLN 112,758,800 — Alstom Polska SA
7 November 2026rel_pkp_plk_awarded_alstomSince2026-012025-12-01
7 November 2026rel_pkp_plk_awarded_budimex_podlezeSince—2025-12-10
7 November 2026SpainLive pipeline band€4.85bn+ valued items tracked on TED in 2026 (Renfe €4.15bn the largest)EUR 4.79bn+ valued items tracked on TED in 2026 (Renfe EUR 4.15bn the largest)
7 November 2026polandLabelGórnośląsko-Zagłębiowska Metropolia zero-emission rail rolling stock for the metropolis and the Śląskie voivodeship — b…Górnośląsko-Zagłębiowska Metropolia zero-emission rail rolling stock for the metropolis and the Śląskie voivodeship — b…
7 November 2026PolandHeadlinePoland publishes its numbers in złoty and there are a lot of them. PKP PLK is contracting inside a PLN 180bn programme…Poland publishes its numbers in złoty and there are a lot of them. PKP PLK is contracting inside a PLN 180bn programme…
7 November 2026PolandLive or recent tenders tracked3637
7 November 2026ETSOne-line descriptionBuilds and maintains the Basque Country's regional rail and tram infrastructure; €59m tram extension awarded June 2026.Builds and maintains Basque regional rail and tram infrastructure; EUR 58.9m Bilbao southern rail bypass tunnel award,…
7 November 2026FGCMandateOperates Catalonia's regional railways and is buying 36 trains (€437m) for the Barcelona–Vallès line.Operates Catalonia's regional railways and is buying 36 trains (EUR 437m) for the Llobregat-Anoia line.
7 November 2026FGCOne-line descriptionOperates Catalonia's regional railways and is buying 36 trains (€437m) for the Barcelona–Vallès line.Operates Catalonia's regional railways and is buying 36 trains (EUR 437m) for the Llobregat-Anoia line.
7 November 2026Den HaagMandateContracting authority for the Vlietlijn tram line (Den Haag Centraal–Binckhorst–Voorburg–Rijswijk, €600m estimated on T…Contracting authority for the Vlietlijn tram line (Den Haag Centraal–Binckhorst–Voorburg–Rijswijk, €600m estimated on T…
7 November 2026rel_adif_awarded_arcelormittal_rail_frameworkLabelFramework agreement to supply rail for partial renewals at various points on the network (€26.5m)Framework agreement to supply rail for partial renewals on line 700 (Cortes de Navarra-Castejon de Ebro and Castejon de…
7 November 2026rel_adif_awarded_arcelormittal_vitoria_araiaLabelContract to supply and transport rail for the Vitoria–Araia track renewal (€9.6m)Supply and transport of rail for the Vitoria-Araia track renewal (EUR 9.65m published as the value of contracts awarded…
7 November 2026rel_adif_awarded_cafLabelSignalling works package, Espeluy — UTE CAF/Magtel (€67.7m, May 2026)Linea 400 safety installations, Espeluy-Cordoba - UTE CAFMAGTEL ESPELUY, CAF Signalling with Magtel Operaciones (EUR 67…
7 November 2026ProRail ERTMS object-controller cabinets OCK frameworkStatus detailContract notice April 2026, republished May 2026; competitive dialogue; 8-year framework. Deadline for receipt of reque…Contract notice April 2026, republished May 2026; competitive dialogue; 8-year framework. Participation deadline 27 May…
7 November 2026ProRail ICT network fibre telecom Noord ZuidStatus detailAward notice January 2025 (restricted procedure); two lots; the TED award record names BAM Telecom bv — trade press (Ra…Winner decision 11 November 2024, award notice January 2025 (restricted procedure); two area lots, one each to BAM Tele…
7 November 2026ProRail ERTMS Zeeland line Roosendaal-VlissingenScopeProRail — ERTMS Zeeland line (Roosendaal–Vlissingen): design, construction supervision, testing and commissioning, awar…ProRail — ERTMS Zeeland line (Roosendaal–Vlissingen): design, construction supervision, testing and commissioning, awar…
7 November 2026RET 38 new 90 m metro trainsStatus detailContract notice July 2025 on TED (460385-2025) and TenderNed (386164), negotiated procedure with call, 30-year lot; req…Contract notice July 2025 on TED (460385-2025) and TenderNed (386164), negotiated procedure with call, 30-year lot; par…
7 November 2026PKP PLK major track repair engineeringStatus detailBids closed February 2026; awarded March 2026 to the Track Tec Construction / Infrakol consortium against the estimate…Bids closed 5 February 2026; awarded 23 February 2026 to the TRACK TEC CONSTRUCTION – INFRAKOL consortium, below the es…
7 November 2026Tramwaje Śląskie Sosnowiec tram track constructionStatus detailOpen procedure (przetarg nieograniczony); bids due 2026-11-19 12:45.Open procedure (przetarg nieograniczony), reference UE/JRP/C/428/2026; bids due 2026-11-19 12:45, opening 13:00. Still…
7 November 2026GVB Activa Tramserie 17G 75 tramsStatus detailContract notice April 2026 (negotiated procedure with call); deadline for receipt of requests to participate May 2026;…Contract notice April 2026 (negotiated procedure with call); participation deadline 26 May 2026; no award on TED as of…
7 November 2026Górnośląsko-Zagłębiowska Metropolia 32 zero-emission electric unitsStatus detailThe first notice of February 2026 carried a March 2026 deadline and the procedure has been re-published eight times sin…The first notice of February 2026 carried a March 2026 deadline and the procedure has been re-published eight times sin…
7 November 2026PKP PLK 2026 contracting planValue bandvalue not publishedPLN 11.5bn (2026 tender plan)
7 November 2026PKP PLK 2026 contracting planStatus detailRolling contracting programme rather than a single procedure, so it carries no participation deadline: PKP PLK states t…Rolling contracting programme rather than a single procedure, so it carries no participation deadline: PKP PLK states t…
7 November 2026Adif safety installations maintenance support seven lotsScopeAdif — repair and maintenance of railway equipment, awarded to Siemens Rail AutomationAdif - expert support for safety-installation maintenance, seven lots, six holders
7 November 2026Adif safety installations maintenance support seven lotsTitleAdif repair maintenance railway equipment SiemensAdif safety installations maintenance support seven lots
7 November 2026Adif safety installations maintenance support seven lotsValue band€64.6mEUR 107.6m seven-lot estimate; EUR 63.79m awarded across six lots
7 November 2026Adif signalling renewal Madrid Cercanias C-5Status detail—Participation deadline July 2026; economic-bid opening set for October 2026 by TED corrigendum 696279-2026; no award on…
7 November 2026Adif signalling renewal Madrid Cercanias C-5City ref—madrid
7 November 2026Adif signalling renewal Madrid Cercanias C-5ScopeAdif — design and execution of railway signalling works (contract notice)Adif - signalling renewal on Madrid Cercanias line C-5, Atocha-Humanes
7 November 2026Adif signalling renewal Madrid Cercanias C-5TitleAdif design execution railway signalling worksAdif signalling renewal Madrid Cercanias C-5
7 November 2026ETS Vitoria-Gasteiz tram extension Aldaia branchValue band€59.0mEUR 8.68m winning tender (EUR 9.24m estimate)

United States

12 changes in 90 days.

DateRecordFieldFromTo
18 November 2026NJ TRANSIT Newark Broad Street facilityStatusOpenBids closed
18 November 2026NJ TRANSIT Newark Broad Street facilityStatus detailBids due November 2026.Bids due 10 November 2026, now passed.
18 November 2026NJ TRANSIT systemwide A&E servicesStatusOpenBids closed
18 November 2026NJ TRANSIT systemwide A&E servicesStatus detailProposals due October 2026; this is the next phase of the group two and group three task order consultant programmes.Proposals due 21 October 2026, now passed; this is the next phase of the group two and group three task order consultan…
18 November 2026rel_metra_awarded_gannett_fleming_transystemsRecord added—Added
18 November 2026rel_metra_awarded_progress_railRecord added—Added
18 November 2026rel_metra_awarded_siemens_mobilityRecord added—Added
18 November 2026rel_metra_awarded_voestalpine_railway_systemsRecord added—Added
11 November 2026NICTD traction power substation modernisationStatusOpenBids closed
11 November 2026NICTD traction power substation modernisationStatus detailBids close on 5 November 2026. NICTD publishes no estimated value; seven addenda had been issued by 2 October 2026.Bids close on 5 November 2026. NICTD publishes no estimated value; seven addenda had been issued by 2 October 2026; par…
11 November 2026SEPTA Chinatown Station ADA Improvement ProjectStatusOpenBids closed
11 November 2026SEPTA Chinatown Station ADA Improvement ProjectStatus detailSealed bids are accepted until 10:00am in October 2026, the date set by Rev 2 of the invitation to bid issued as Addend…Sealed bids are accepted until 10:00am in October 2026, the date set by Rev 2 of the invitation to bid issued as Addend…

United Kingdom

6 changes in 90 days.

DateRecordFieldFromTo
18 November 2026Safety and assurance framework North West CentralStatusOpenBids closed
18 November 2026Safety and assurance framework North West CentralStatus detailCompetitive flexible procedure open; submissions close 2 November 2026.Competitive flexible procedure; submissions close 2 November 2026, now passed. No award on UK Find a Tender as of 2026-…
18 November 2026Operational Property Inspections FrameworkStatusOpenBids closed
18 November 2026Operational Property Inspections FrameworkStatus detailCompetitive flexible procedure open; submissions close 12 November 2026.Competitive flexible procedure; submissions close 12 November 2026, now passed. No award on UK Find a Tender as of 2026…
18 November 2026Aerial LiDAR survey of UK rail networkStatusOpenBids closed
18 November 2026Aerial LiDAR survey of UK rail networkStatus detailSelection stage open; the expression-of-interest deadline is 9 November 2026.Selection stage; the expression-of-interest deadline is 9 November 2026; participation deadline 2026-11-09; no award on…

Corrections applied

A correction is a change made because the earlier value was wrong or out of date against its source: a proposal whose id ends in “fix” or in a number. Ageing status flips, wording passes and additions of new records are left out. Values held inside editions are not quoted.

DateRecordWhat changedWhy
18 November 2026SJMandate: Sweden's state-owned passenger train company: awarded the Västtågen operating and maintenance contract (about SEK 12bn,… → Sweden's state-owned passenger train company: awarded the Västtågen operating and maintenance contract (about SEK 12bn,…Refresh proposal 2026-11-16_sj_1. The source quotes are held with the proposal.
18 November 2026SL / Region StockholmMandate: Owns and procures Stockholm's public transport: an 11-year metro operating contract with Connecting Stockholm (about SE… → Owns and procures Stockholm's public transport: an 11-year metro operating contract with Connecting Stockholm (about SE…
1 field shown only inside editions
Refresh proposal 2026-11-16_region_stockholm_trafikforvaltningen_1. The source quotes are held with the proposal.
7 November 2026Provincies Overijssel Gelderland Zutphen-Hengelo-Oldenzaal concessionStatus: Planned → Cancelled
Status detail: Notice of intention to award directly (provincies Overijssel and Gelderland) published April 2026, after a voluntary ex… → The December 2025 ex-ante transparency notice named Arriva Personenvervoer Nederland B.V. as the intended holder at abo…
1 field shown only inside editions
Refresh proposal 2026-11-07_t_nl_overijssel_zutphen_hengelo_oldenzaal_1. The source quotes are held with the proposal.
7 November 2026NetherlandsSummary line: ProRail 7,000 km (ERTMS Tranche 1 €3.8bn constructing); NS orders Stadler/CAF (€400m+, €600m+); Amsterdam RET 38 metros… → ProRail 7,000 km (ERTMS Tranche 1 €3.8bn constructing); NS orders Stadler/CAF (€400m+, €600m+); Rotterdam RET 38 metros…
Live or recent tenders tracked: 30 → 31
Refresh proposal 2026-11-07_netherlands_1. The source quotes are held with the proposal.
7 November 2026netherlands1 field shown only inside editionsRefresh proposal 2026-11-07_netherlands_market_block_1. The source quotes are held with the proposal.
7 November 2026_meta2 fields shown only inside editionsRefresh proposal 2026-11-07__meta_1. The source quotes are held with the proposal.
7 November 2026rel_adif_awarded_siemens_mobilityLabel: Railway equipment maintenance — Siemens Rail Automation (€64.6m, June 2026) → Safety-installation maintenance support, LOT-0001 of seven - Siemens Rail Automation, one of six lot holders (EUR 20.57…
1 field shown only inside editions
Refresh proposal 2026-11-07_rel_adif_awarded_siemens_mobility_1. The source quotes are held with the proposal.
7 November 2026rel_metro_madrid_awarded_alstomLabel: Signalling/CBTC upgrade — Alstom Movilidad (€69.0m, May 2026) → Line 6 signalling and CBTC upgrade - Alstom Movilidad (EUR 69.0m, contract concluded January 2025)
Since: 2026-05 → 2025-01
1 field shown only inside editions
Refresh proposal 2026-11-07_rel_metro_madrid_awarded_alstom_1. The source quotes are held with the proposal.
7 November 2026rel_pkp_intercity_awarded_newag_overhaul_2026_10Label: Fourth-level periodic overhaul of rolling stock — Newag → Fourth-level (P4) periodic overhaul of ten rail vehicles, PLN 43,169,138.20 — Newag
Since: 2026-10-19 → 2026-10-15
1 field shown only inside editions
Refresh proposal 2026-11-07_rel_pkp_intercity_awarded_newag_overhaul_2026_10_1. The source quotes are held with the proposal.
7 November 2026rel_pkp_plk_awarded_alstomLabel: Railway equipment major repair — Alstom Polska (PLN 112.8m, January 2026) → Major repair of Alstom-built electric point machines, 2026–2029, PLN 112,758,800 — Alstom Polska SA
Since: 2026-01 → 2025-12-01
1 field shown only inside editions
Refresh proposal 2026-11-07_rel_pkp_plk_awarded_alstom_1. The source quotes are held with the proposal.
7 November 2026rel_pkp_plk_awarded_budimex_podlezeSince: — → 2025-12-10
1 field shown only inside editions
Refresh proposal 2026-11-07_rel_pkp_plk_awarded_budimex_podleze_1. The source quotes are held with the proposal.
7 November 2026SpainLive pipeline band: €4.85bn+ valued items tracked on TED in 2026 (Renfe €4.15bn the largest) → EUR 4.79bn+ valued items tracked on TED in 2026 (Renfe EUR 4.15bn the largest)
2 fields shown only inside editions
Refresh proposal 2026-11-07_spain_1. The source quotes are held with the proposal.
7 November 2026polandLabel: Górnośląsko-Zagłębiowska Metropolia zero-emission rail rolling stock for the metropolis and the Śląskie voivodeship — b… → Górnośląsko-Zagłębiowska Metropolia zero-emission rail rolling stock for the metropolis and the Śląskie voivodeship — b…
1 field shown only inside editions
Refresh proposal 2026-11-07_poland_1. The source quotes are held with the proposal.
7 November 2026PolandHeadline: Poland publishes its numbers in złoty and there are a lot of them. PKP PLK is contracting inside a PLN 180bn programme… → Poland publishes its numbers in złoty and there are a lot of them. PKP PLK is contracting inside a PLN 180bn programme…
Live or recent tenders tracked: 36 → 37
Refresh proposal 2026-11-07_poland_region_1. The source quotes are held with the proposal.
7 November 2026ETSOne-line description: Builds and maintains the Basque Country's regional rail and tram infrastructure; €59m tram extension awarded June 2026. → Builds and maintains Basque regional rail and tram infrastructure; EUR 58.9m Bilbao southern rail bypass tunnel award,…
3 fields shown only inside editions
Refresh proposal 2026-11-07_ets_1. The source quotes are held with the proposal.
7 November 2026FGCMandate: Operates Catalonia's regional railways and is buying 36 trains (€437m) for the Barcelona–Vallès line. → Operates Catalonia's regional railways and is buying 36 trains (EUR 437m) for the Llobregat-Anoia line.
One-line description: Operates Catalonia's regional railways and is buying 36 trains (€437m) for the Barcelona–Vallès line. → Operates Catalonia's regional railways and is buying 36 trains (EUR 437m) for the Llobregat-Anoia line.
1 field shown only inside editions
Refresh proposal 2026-11-07_fgc_1. The source quotes are held with the proposal.
7 November 2026Metro de Madrid2 fields shown only inside editionsRefresh proposal 2026-11-07_metro_madrid_1. The source quotes are held with the proposal.
7 November 2026Den HaagMandate: Contracting authority for the Vlietlijn tram line (Den Haag Centraal–Binckhorst–Voorburg–Rijswijk, €600m estimated on T… → Contracting authority for the Vlietlijn tram line (Den Haag Centraal–Binckhorst–Voorburg–Rijswijk, €600m estimated on T…
1 field shown only inside editions
Refresh proposal 2026-11-07_gemeente_den_haag_1. The source quotes are held with the proposal.
7 November 2026ProRail1 field shown only inside editionsRefresh proposal 2026-11-07_prorail_1. The source quotes are held with the proposal.
7 November 2026ProRail1 field shown only inside editionsRefresh proposal 2026-11-07_prorail_2. The source quotes are held with the proposal.
7 November 2026rel_adif_awarded_arcelormittal_rail_frameworkLabel: Framework agreement to supply rail for partial renewals at various points on the network (€26.5m) → Framework agreement to supply rail for partial renewals on line 700 (Cortes de Navarra-Castejon de Ebro and Castejon de…Refresh proposal 2026-11-07_rel_adif_awarded_arcelormittal_rail_framework_1. The source quotes are held with the proposal.
7 November 2026rel_adif_awarded_arcelormittal_vitoria_araiaLabel: Contract to supply and transport rail for the Vitoria–Araia track renewal (€9.6m) → Supply and transport of rail for the Vitoria-Araia track renewal (EUR 9.65m published as the value of contracts awarded…Refresh proposal 2026-11-07_rel_adif_awarded_arcelormittal_vitoria_araia_1. The source quotes are held with the proposal.
7 November 2026rel_adif_awarded_cafLabel: Signalling works package, Espeluy — UTE CAF/Magtel (€67.7m, May 2026) → Linea 400 safety installations, Espeluy-Cordoba - UTE CAFMAGTEL ESPELUY, CAF Signalling with Magtel Operaciones (EUR 67…Refresh proposal 2026-11-07_rel_adif_awarded_caf_1. The source quotes are held with the proposal.
7 November 2026NS 15-year SLT sprinter fleet support2 fields shown only inside editionsRefresh proposal 2026-11-07_t_nl_ns_slt_ltsa_1. The source quotes are held with the proposal.
7 November 2026ProRail ERTMS object-controller cabinets OCK frameworkStatus detail: Contract notice April 2026, republished May 2026; competitive dialogue; 8-year framework. Deadline for receipt of reque… → Contract notice April 2026, republished May 2026; competitive dialogue; 8-year framework. Participation deadline 27 May…Refresh proposal 2026-11-07_t_nl_prorail_ertms_ock_1. The source quotes are held with the proposal.
7 November 2026ProRail ICT network fibre telecom Noord ZuidStatus detail: Award notice January 2025 (restricted procedure); two lots; the TED award record names BAM Telecom bv — trade press (Ra… → Winner decision 11 November 2024, award notice January 2025 (restricted procedure); two area lots, one each to BAM Tele…
3 fields shown only inside editions
Refresh proposal 2026-11-07_t_nl_prorail_ict_network_1. The source quotes are held with the proposal.
7 November 2026ProRail PHS Amsterdam Centraal contract 62 fields shown only inside editionsRefresh proposal 2026-11-07_t_nl_prorail_phs_amsterdam_c6_1. The source quotes are held with the proposal.
7 November 2026ProRail ERTMS Zeeland line Roosendaal-VlissingenScope: ProRail — ERTMS Zeeland line (Roosendaal–Vlissingen): design, construction supervision, testing and commissioning, awar… → ProRail — ERTMS Zeeland line (Roosendaal–Vlissingen): design, construction supervision, testing and commissioning, awar…
2 fields shown only inside editions
Refresh proposal 2026-11-07_t_nl_prorail_zeeland_ertms_1. The source quotes are held with the proposal.
7 November 2026RET 38 new 90 m metro trainsStatus detail: Contract notice July 2025 on TED (460385-2025) and TenderNed (386164), negotiated procedure with call, 30-year lot; req… → Contract notice July 2025 on TED (460385-2025) and TenderNed (386164), negotiated procedure with call, 30-year lot; par…Refresh proposal 2026-11-07_t_nl_ret_38_metros_1. The source quotes are held with the proposal.
7 November 2026RET HVAC air-conditioning metro tram framework3 fields shown only inside editionsRefresh proposal 2026-11-07_t_nl_ret_hvac_1. The source quotes are held with the proposal.
7 November 2026Adif2 fields shown only inside editionsRefresh proposal 2026-11-07_adif_1. The source quotes are held with the proposal.
7 November 2026PKP PLK line 309 Kłodzko Nowe Kudowa2 fields shown only inside editionsRefresh proposal 2026-11-07_t_pl_plk_kudowa_1. The source quotes are held with the proposal.
7 November 2026PKP PLK investment works lines 29 362 fields shown only inside editionsRefresh proposal 2026-11-07_t_pl_plk_lines_29_36_1. The source quotes are held with the proposal.
7 November 2026PKP PLK major track repair engineeringStatus detail: Bids closed February 2026; awarded March 2026 to the Track Tec Construction / Infrakol consortium against the estimate… → Bids closed 5 February 2026; awarded 23 February 2026 to the TRACK TEC CONSTRUCTION – INFRAKOL consortium, below the es…
2 fields shown only inside editions
Refresh proposal 2026-11-07_t_pl_plk_track_repair_43128_1. The source quotes are held with the proposal.
7 November 2026Tramwaje Śląskie Sosnowiec tram track constructionStatus detail: Open procedure (przetarg nieograniczony); bids due 2026-11-19 12:45. → Open procedure (przetarg nieograniczony), reference UE/JRP/C/428/2026; bids due 2026-11-19 12:45, opening 13:00. Still…
2 fields shown only inside editions
Refresh proposal 2026-11-07_t_pl_tramwaje_slaskie_sosnowiec_track_1. The source quotes are held with the proposal.
7 November 2026Tramwaje Warszawskie fast tram Kasprzaka Wilanów2 fields shown only inside editionsRefresh proposal 2026-11-07_t_pl_tw_kasprzaka_tramway_1. The source quotes are held with the proposal.
7 November 2026Tramwaje Warszawskie Mokotów depot track rebuilding1 field shown only inside editionsRefresh proposal 2026-11-07_t_pl_tw_mokotow_depot_1. The source quotes are held with the proposal.
7 November 2026Gemeente Den Haag INTHR tram lines 6 122 fields shown only inside editionsRefresh proposal 2026-11-07_t_nl_den_haag_inthr_lijn_6_12_1. The source quotes are held with the proposal.
7 November 2026GVB Infra 44 rectifier stations replacement1 field shown only inside editionsRefresh proposal 2026-11-07_t_nl_gvb_gelijkrichterstations_1. The source quotes are held with the proposal.
7 November 2026GVB Activa Tramserie 17G 75 tramsStatus detail: Contract notice April 2026 (negotiated procedure with call); deadline for receipt of requests to participate May 2026;… → Contract notice April 2026 (negotiated procedure with call); participation deadline 26 May 2026; no award on TED as of…Refresh proposal 2026-11-07_t_nl_gvb_tram_procurement_1. The source quotes are held with the proposal.
7 November 2026Renfe Viajeros supply high-speed trains commercial2 fields shown only inside editionsRefresh proposal 2026-11-07_t_es_renfe_hs_trains_1. The source quotes are held with the proposal.
7 November 2026CPK Łódź long-distance tunnel line 851 field shown only inside editionsRefresh proposal 2026-11-07_t_pl_cpk_lodz_tunnel_1. The source quotes are held with the proposal.
7 November 2026Gdańskie Autobusy i Tramwaje bidirectional trams3 fields shown only inside editionsRefresh proposal 2026-11-07_t_pl_gait_pesa_trams_1. The source quotes are held with the proposal.
7 November 2026Gdańskie Autobusy i Tramwaje bidirectional trams2 fields shown only inside editionsRefresh proposal 2026-11-07_t_pl_gait_pesa_trams_2. The source quotes are held with the proposal.
7 November 2026Górnośląsko-Zagłębiowska Metropolia 32 zero-emission electric unitsStatus detail: The first notice of February 2026 carried a March 2026 deadline and the procedure has been re-published eight times sin… → The first notice of February 2026 carried a March 2026 deadline and the procedure has been re-published eight times sin…
3 fields shown only inside editions
Refresh proposal 2026-11-07_t_pl_gzm_zero_emission_fleet_1. The source quotes are held with the proposal.
7 November 2026Koleje Małopolskie P4-level regional fleet overhaul2 fields shown only inside editionsRefresh proposal 2026-11-07_t_pl_koleje_malopolskie_p4_1. The source quotes are held with the proposal.
7 November 2026PKP PLK 2026 contracting planValue band: value not published → PLN 11.5bn (2026 tender plan)
Status detail: Rolling contracting programme rather than a single procedure, so it carries no participation deadline: PKP PLK states t… → Rolling contracting programme rather than a single procedure, so it carries no participation deadline: PKP PLK states t…
1 field shown only inside editions
Refresh proposal 2026-11-07_t_pl_plk_2026_contract_plan_1. The source quotes are held with the proposal.
7 November 2026PKP PLK railway equipment repair maintenance2 fields shown only inside editionsRefresh proposal 2026-11-07_t_pl_plk_alstom_maintenance_1. The source quotes are held with the proposal.
7 November 2026Adif safety installations maintenance support seven lotsScope: Adif — repair and maintenance of railway equipment, awarded to Siemens Rail Automation → Adif - expert support for safety-installation maintenance, seven lots, six holders
Title: Adif repair maintenance railway equipment Siemens → Adif safety installations maintenance support seven lots
Value band: €64.6m → EUR 107.6m seven-lot estimate; EUR 63.79m awarded across six lots
6 fields shown only inside editions
Refresh proposal 2026-11-07_t_es_adif_maintenance_siemens_1. The source quotes are held with the proposal.
7 November 2026Adif signalling renewal Madrid Cercanias C-5Status detail: — → Participation deadline July 2026; economic-bid opening set for October 2026 by TED corrigendum 696279-2026; no award on…
1 field shown only inside editions
Refresh proposal 2026-11-07_t_es_adif_signalling_works_1. The source quotes are held with the proposal.
7 November 2026Adif signalling renewal Madrid Cercanias C-5City ref: — → madrid
Scope: Adif — design and execution of railway signalling works (contract notice) → Adif - signalling renewal on Madrid Cercanias line C-5, Atocha-Humanes
Title: Adif design execution railway signalling works → Adif signalling renewal Madrid Cercanias C-5
1 field shown only inside editions
Refresh proposal 2026-11-07_t_es_adif_signalling_works_2. The source quotes are held with the proposal.
7 November 2026ETS Vitoria-Gasteiz tram extension Aldaia branchValue band: €59.0m → EUR 8.68m winning tender (EUR 9.24m estimate)
Value band: $25–100m → $5–25m
Scope: Euskal Trenbide Sarea — tramway extension construction works (Basque Country) → ETS - Vitoria-Gasteiz to Zabalgana tram extension, Aldaia branch works
Title: Euskal Trenbide Sarea tramway extension Basque → ETS Vitoria-Gasteiz tram extension Aldaia branch
6 fields shown only inside editions
Refresh proposal 2026-11-07_t_es_ets_tram_1. The source quotes are held with the proposal.
7 November 2026FGC 36 trains Llobregat Anoia lineStatus: Bids closed → Open
Status detail: participation deadline September 2026; no award recorded as of September 2026 → Participation deadline December 2026 - extended from September 2026 by TED corrigendum 452135-2026; no award on TED as…
2 fields shown only inside editions
Refresh proposal 2026-11-07_t_es_fgc_36_trains_1. The source quotes are held with the proposal.
7 November 2026FGC 36 trains Llobregat Anoia lineScope: FGC — construction and supply of 36 trains for the Barcelona–Vallès line → FGC - construction and supply of 36 trains for the Llobregat-Anoia line
Title: FGC 36 trains Barcelona Vallès line → FGC 36 trains Llobregat Anoia line
1 field shown only inside editions
Refresh proposal 2026-11-07_t_es_fgc_36_trains_2. The source quotes are held with the proposal.
7 November 2026Metro de Madrid Line 6 CBTC upgradeScope: Metro de Madrid — signalling and CBTC system upgrade works, awarded to Alstom → Metro de Madrid - Line 6 signalling and CBTC upgrade works, awarded to Alstom
Title: Metro de Madrid signalling CBTC system upgrade → Metro de Madrid Line 6 CBTC upgrade
4 fields shown only inside editions
Refresh proposal 2026-11-07_t_es_metro_madrid_cbtc_1. The source quotes are held with the proposal.
4 November 2026Hradčanská metro station escalator replacement and modernisationStatus: Awarded → In execution
Scope: DPP — Hradčanská metro station: escalator replacement and station and substation modernisation, awarded → DPP — Hradčanská metro station: escalator replacement and station and substation modernisation, in execution
Refresh proposal 2026-11-02_dpp_1. The source quotes are held with the proposal.
4 November 2026GVBMandate: Operates Amsterdam's metro and trams under the Vervoerregio concession (from 1 July 2025) and manages the rail infrastr… → Operates Amsterdam's metro and trams under the Vervoerregio concession (from 1 July 2025) and manages the rail infrastr…
1 field shown only inside editions
Refresh proposal 2026-11-02_gvb_amsterdam_1. The source quotes are held with the proposal.
4 November 2026ProRail2 fields shown only inside editionsRefresh proposal 2026-11-02_prorail_1. The source quotes are held with the proposal.
4 November 2026SL / Region Stockholm2 fields shown only inside editionsRefresh proposal 2026-11-02_region_stockholm_trafikforvaltningen_1. The source quotes are held with the proposal.
4 November 2026SJMandate: Sweden's state-owned passenger train company: awarded the Västtågen operating and maintenance contract (about SEK 12bn,… → Sweden's state-owned passenger train company: awarded the Västtågen operating and maintenance contract (about SEK 12bn,…
2 fields shown only inside editions
Refresh proposal 2026-11-02_sj_1. The source quotes are held with the proposal.
4 November 2026TrafikverketMandate: Manages about 14,200 km of Sweden's 15,600 km of track (around 80 percent electrified), carries out the SEK 1,171bn nat… → Manages about 14,200 km of Sweden's 15,600 km of track (around 80 percent electrified), carries out the SEK 1,171bn nat…Refresh proposal 2026-11-02_trafikverket_1. The source quotes are held with the proposal.
4 November 2026Västtrafik2 fields shown only inside editionsRefresh proposal 2026-11-02_vasttrafik_1. The source quotes are held with the proposal.
21 October 2026IP Porto Campanhã Oiã high-speed concession1 field shown only inside editionsRefresh proposal 2026-10-19_t_pt_lav_porto_oia_2. The source quotes are held with the proposal.
21 October 2026IP Porto Campanhã Oiã high-speed concessionStatus detail: Concession contract signed July 2025 after award in October 2024; construction expected to start in the third quarter o… → Concession contract signed July 2025 after award in October 2024; construction began 12 October 2026 on the 71 km Porto…Refresh proposal 2026-10-19_t_pt_lav_porto_oia_1. The source quotes are held with the proposal.
21 October 2026SGPMandate: Builds the Grand Paris Express: 200 km of metro line and 68 stations, 80% of them interchanges, on four new lines (15,… → Builds the Grand Paris Express: 200 km of metro line and 68 stations, 80% of them interchanges, on four new lines (15,…
Programme tags: ['cef', 'ten_t', 'high_speed_plan'] → ['cef', 'ten_t', 'high_speed_plan', 'serm']
Mandate: Builds the Grand Paris Express: 200 km of metro line and 68 stations, 80% of them interchanges, on four new lines (15,… → Builds the Grand Paris Express: 200 km of metro line and 68 stations, 80% of them interchanges, on four new lines (15,…
2 fields shown only inside editions
Refresh proposal 2026-10-19_sgp_1. The source quotes are held with the proposal.
21 October 2026ÖBB-InfrastrukturMandate: Owns, builds and maintains Austria's 4,875 km federal rail network and 1,046 stations; delivers the six-year Rahmenplan… → Owns, builds and maintains Austria's 4,875 km federal rail network and 1,046 stations; delivers the six-year Rahmenplan…
1 field shown only inside editions
Refresh proposal 2026-10-19_obb_infrastruktur_1. The source quotes are held with the proposal.
21 October 2026Aarhus LetbaneMandate: Owns and runs Denmark's first light rail: 110 km from Odder in the south to Grenaa in the north-east through Aarhus, op… → Owns and runs Denmark's first light rail: 110 km from Odder in the south to Grenaa in the north-east through Aarhus, op…
1 field shown only inside editions
Refresh proposal 2026-10-21_aarhus_letbane_1. The source quotes are held with the proposal.
14 October 2026Miami River Miami Intermodal Center Capacity ImprovementStatus: Bids closed → Awarded
Status detail: Bids opened at FDOT District Four's letting of July 2026, moved there from the July 2026 letting after three addenda: f… → FDOT District Four's intent-to-award table for the 31 July 2026 letting, posted 25 August 2026, names Prince-Railworks…
Refresh proposal 2026-10-12_t_fl_fdot_mr_micci_1. The source quotes are held with the proposal.
7 October 2026TII1 field shown only inside editionsRefresh proposal 2026-10-07_ie_tii_amey_ocs_1. The source quotes are held with the proposal.
3 October 2026GermanyLive pipeline band: €3.6bn+ of valued items tracked on TED (Sept 2025 – Sept 2026) → €10.1bn of valued items tracked on TED (Sept 2025 – Oct 2026): €3.8bn of awards and closed tenders, plus €6.4bn of fram…Refresh proposal 2026-10-03_germany_pipeline_band_2. The source quotes are held with the proposal.
3 October 2026HungaryBodies: ['kbm', 'mav_zrt', 'mav_palyamukodtetesi', 'mav_szemelyszallitasi', 'mav_szolgaltato_kozpont', 'gysev', 'bkv', 'bkk', '… → ['kbm', 'mav_zrt', 'mav_palyamukodtetesi', 'mav_szemelyszallitasi', 'mav_szolgaltato_kozpont', 'gysev', 'bkv', 'bkk', '…
Bodies tracked: 10 → 12
Refresh proposal 2026-10-03_hungary_region_counts_2. The source quotes are held with the proposal.
3 October 2026FranceLive pipeline band: €14.9bn of valued items tracked on TED (July 2025 – September 2026) → €23.4bn of valued items tracked on TED (2025 – October 2026), excluding one procedure closed with no winnerRefresh proposal 2026-10-03_france_pipeline_band_2. The source quotes are held with the proposal.
3 October 2026ItalyLive pipeline band: €6.9bn of valued items tracked on TED in 2026, excluding the FerrovieNord framework closed with no winner (largest: EAV… → €10.4bn of valued items tracked on TED in 2025–26, excluding the FerrovieNord framework closed with no winner (largest:…Refresh proposal 2026-10-03_italy_pipeline_band_2. The source quotes are held with the proposal.
3 October 2026GermanyLive or recent tenders tracked: 55 → 61Refresh proposal 2026-10-03_germany_region_counts_2. The source quotes are held with the proposal.
3 October 2026FranceBodies: ['sncf_reseau', 'idfm', 'art_fr', 'sncf_voyageurs', 'dgitm', 'afit_france', 'sgp', 'ratp', 'sytral', 'rtm', 'tisseo', '… → ['sncf_reseau', 'idfm', 'art_fr', 'sncf_voyageurs', 'dgitm', 'afit_france', 'sgp', 'ratp', 'sytral', 'rtm', 'tisseo', '…
Bodies tracked: 18 → 22
Live or recent tenders tracked: 27 → 49
Refresh proposal 2026-10-03_france_region_counts_2. The source quotes are held with the proposal.
3 October 2026ItalyBodies: ['rfi', 'ferrovienord', 'eav', 'mm_spa', 'roma_capitale', 'circumetnea'] → ['rfi', 'ferrovienord', 'eav', 'mm_spa', 'roma_capitale', 'circumetnea', 'torino_l2_commissario', 'comune_di_palermo',…
Bodies tracked: 6 → 10
Live or recent tenders tracked: 7 → 19
Refresh proposal 2026-10-03_italy_region_counts_2. The source quotes are held with the proposal.
3 October 2026ItalyHeadline: PNRR made 2025–26 Italy's peak rail-spend years: RFI invested a record €11.6bn in 2025 across 1,300 sites and the TED r… → PNRR made 2025–26 Italy's peak rail-spend years: RFI invested a record €11.6bn in 2025 across 1,300 sites and the TED r…Refresh proposal 2026-10-03_italy_punct_0. The source quotes are held with the proposal.
3 October 2026FerrovieNordMandate: Owns Lombardy's regional network and fleet used by Trenord; its €1.81bn single-operator rolling-stock framework closed… → Owns Lombardy's regional network and fleet used by Trenord; its €1.81bn single-operator rolling-stock framework closed…Refresh proposal 2026-10-03_ferrovienord_punct_1. The source quotes are held with the proposal.
3 October 2026EnglandBodies: ['network_rail', 'hs2_ltd', 'tfl', 'dft', 'nexus', 'west_midlands_trains', 'east_midlands_railway', 'transpennine_expre… → ['network_rail', 'hs2_ltd', 'tfl', 'dft', 'nexus', 'west_midlands_trains', 'east_midlands_railway', 'transpennine_expre…
Bodies tracked: 8 → 10
Live or recent tenders tracked: 8 → 12
Refresh proposal 2026-10-03_england_region_counts_1. The source quotes are held with the proposal.
3 October 2026FranceBodies: ['sncf_reseau', 'idfm', 'art_fr', 'sncf_voyageurs', 'dgitm', 'afit_france', 'sgp', 'ratp', 'sytral', 'rtm', 'tisseo', '… → ['sncf_reseau', 'idfm', 'art_fr', 'sncf_voyageurs', 'dgitm', 'afit_france', 'sgp', 'ratp', 'sytral', 'rtm', 'tisseo', '…
Bodies tracked: 17 → 18
Refresh proposal 2026-10-03_france_region_counts_1. The source quotes are held with the proposal.
3 October 2026RFI2 fields shown only inside editionsRefresh proposal 2026-10-03_rfi_1. The source quotes are held with the proposal.
3 October 2026Ferrovia Circumetnea rolling-stock frameworkStatus detail: — → Contract concluded 26 September 2025; TED published the award notice on 15 May 2026.
4 fields shown only inside editions
Refresh proposal 2026-10-03_t_it_circumetnea_fleet_1. The source quotes are held with the proposal.
3 October 2026Campania regional railway works design constructionScope: EAV — Campania regional railway works: executive design and construction, awarded to Consorzio Partenope → EAV — Campania regional railway works, two lots awarded: Consorzio Partenope 10 (civils) and a consortium including CAF…
Modality: ['civil', 'track', 'station_depot'] → ['civil', 'track', 'station_depot', 'rolling_stock']
Status detail: — → Both lots concluded in 2026; TED published the award 18 May 2026. Lot 1 was concluded 31 March 2026 and lot 2 on 4 May…
5 fields shown only inside editions
Refresh proposal 2026-10-03_t_it_eav_campania_1. The source quotes are held with the proposal.
3 October 2026FerrovieNord rolling-stock supply framework LombardyStatus: Awarded → Cancelled
Status detail: — → Closed with no winner: no tenders received, and the buyer cited changed needs (TED result notice of 8 May 2026). Ferrov…
Scope: FerrovieNord — single-operator framework for rolling-stock supply (Lombardy regional fleet) → FerrovieNord — single-operator rolling-stock framework (Lombardy regional fleet): closed with no winner
4 fields shown only inside editions
Refresh proposal 2026-10-03_t_it_ferrovienord_fleet_1. The source quotes are held with the proposal.
3 October 2026MM Milan metro partially underground railwayStatus: Bids closed → Open
Status detail: participation deadline September 2026; no award recorded as of September 2026 → Bids due 15 October 2026 after a published deadline extension. TED notice 522601-2026 (28 July 2026, 'PROROGA DEL TERMI…
4 fields shown only inside editions
Refresh proposal 2026-10-03_t_it_mm_milan_metro_1. The source quotes are held with the proposal.
3 October 2026DAC.0037.2026 framework design execution worksStatus detail: — → Bids closed 4 May 2026; no award on TED as of 3 October 2026. The published figure is the procedure estimate across 37…
2 fields shown only inside editions
Refresh proposal 2026-10-03_t_it_rfi_dac0037_1. The source quotes are held with the proposal.
3 October 2026Santomarco tunnel design and constructionStatus detail: — → Contract concluded 18 December 2025; TED published the award 8 January 2026.
2 fields shown only inside editions
Refresh proposal 2026-10-03_t_it_rfi_santomarco_1. The source quotes are held with the proposal.
3 October 2026Roma Capitale tramway works design constructionStatus detail: — → Bids closed 3 June 2026; no award on TED as of 3 October 2026.
2 fields shown only inside editions
Refresh proposal 2026-10-03_t_it_roma_tram_1. The source quotes are held with the proposal.
3 October 2026DB InfraGO E/M accompanying works framework 2027Status detail: Deadline September 2026. Negotiated procedure with a prior call for competition, so the date is the request-to-particip… → Requests to participate closed 21 September 2026; no award on TED. Read 3 October 2026; negotiated procedure with a pri…
1 field shown only inside editions
Refresh proposal 2026-10-03_t_de_infrago_whz_obp2027_1. The source quotes are held with the proposal.
3 October 2026DB InfraGO ZIM 6 train-information monitorsStatus detail: Participation deadline July 2026, extended from 2 June by the re-publications of 21 and May 2026; no award on TED as of… → Bids closed 3 July 2026; no award on TED. Read 3 October 2026. The submission deadline was extended from 2 June 2026 by…
1 field shown only inside editions
Refresh proposal 2026-10-03_t_de_infrago_zim6_monitors_1. The source quotes are held with the proposal.
3 October 2026Hamburg LSBG U-Bahn Farmsen interchange Baulos 1Status detail: Open for bids; submission deadline September 2026; participation deadline September 2026; no award recorded as of Septe… → Bids closed 15 September 2026; no award on TED. Read 3 October 2026.
1 field shown only inside editions
Refresh proposal 2026-10-03_t_de_lsbg_ubahn_farmsen_baulos1_1. The source quotes are held with the proposal.
3 October 2026RMV Vergabeverfahren 2031 Niddertal public service2 fields shown only inside editionsRefresh proposal 2026-10-03_t_de_rmv_niddertal_2031_1. The source quotes are held with the proposal.
3 October 2026Stadtwerke München Tram Westtangente construction sectionStatus detail: Submission deadline September 2026. SWM publishes no value; participation deadline September 2026; no award on Tenders… → Bids closed 21 September 2026; no award on TED. Read 3 October 2026. SWM publishes no value.
1 field shown only inside editions
Refresh proposal 2026-10-03_t_de_swm_tram_westtangente_ba3_1. The source quotes are held with the proposal.
3 October 2026Verband Region Stuttgart S-Bahn Stuttgart re-letStatus detail: Open for requests to participate; deadline September 2026. Negotiated procedure with a prior call for competition, so t… → Requests to participate closed 15 September 2026; no award on TED. Read 3 October 2026; negotiated procedure with a pri…
1 field shown only inside editions
Refresh proposal 2026-10-03_t_de_vrs_sbahn_stuttgart_relet_1. The source quotes are held with the proposal.
3 October 2026VRS1 field shown only inside editionsRefresh proposal 2026-10-03_vrs_1. The source quotes are held with the proposal.
3 October 2026_meta1 field shown only inside editionsRefresh proposal 2026-10-03__meta_1. The source quotes are held with the proposal.
3 October 2026CircumetneaMandate: Runs the Catania metro and Circumetnea railway; awarded a €253m rolling-stock framework to Stadler (May 2026). → Runs the Catania metro and Circumetnea railway; awarded Stadler a €253m framework for 15 hydrogen traction units in Sep…
One-line description: Runs the Catania metro and Circumetnea railway; awarded a €253m rolling-stock framework to Stadler (May 2026). → Runs the Catania metro and Circumetnea railway; awarded Stadler a €253m framework for 15 hydrogen traction units in Sep…
1 field shown only inside editions
Refresh proposal 2026-10-03_circumetnea_1. The source quotes are held with the proposal.
3 October 2026EAVMandate: Owns and operates Campania's regional railways (Circumvesuviana, Cumana, Circumflegrea) and awarded €2.37bn of design-a… → Owns and operates Campania's regional railways (Circumvesuviana, Cumana, Circumflegrea) and awarded €2.37bn across two…
One-line description: Owns and operates Campania's regional railways (Circumvesuviana, Cumana, Circumflegrea) and awarded €2.37bn of design-a… → Owns and operates Campania's regional railways (Circumvesuviana, Cumana, Circumflegrea); awarded €2.37bn across two lot…
1 field shown only inside editions
Refresh proposal 2026-10-03_eav_1. The source quotes are held with the proposal.
3 October 2026FerrovieNordMandate: Owns Lombardy's regional network and fleet used by Trenord; awarded a €1.81bn single-operator rolling-stock framework i… → Owns Lombardy's regional network and fleet used by Trenord; its €1.81bn single-operator rolling-stock framework closed…
One-line description: Owns Lombardy's regional network and fleet used by Trenord; awarded a €1.81bn single-operator rolling-stock framework i… → Owns Lombardy's regional network and fleet used by Trenord; its €1.81bn fleet framework closed without award in 2026.
1 field shown only inside editions
Refresh proposal 2026-10-03_ferrovienord_1. The source quotes are held with the proposal.
3 October 2026ItalyHeadline: PNRR made 2025–26 Italy's peak rail-spend years: RFI invested a record €11.6bn in 2025 across 1,300 sites and the TED r… → PNRR made 2025–26 Italy's peak rail-spend years: RFI invested a record €11.6bn in 2025 across 1,300 sites and the TED r…
Live pipeline band: €8.9bn+ valued items tracked on TED in 2026 (largest: EAV €2.37bn, FerrovieNord €1.81bn, RFI Santomarco €1.59bn) → €6.9bn of valued items tracked on TED in 2026, excluding the FerrovieNord framework closed with no winner (largest: EAV…
1 field shown only inside editions
Refresh proposal 2026-10-03_italy_1. The source quotes are held with the proposal.
3 October 2026MMMandate: Designs and builds Milan's metro extensions; tendering €1.12bn of partially underground railway works (bids due Sept 20… → Designs and builds Milan's metro extensions; tendering the €1.12bn main works package of the M5 extension to Monza (bid…
One-line description: Designs and builds Milan's metro extensions; tendering €1.12bn of partially underground railway works (bids due Sept 20… → Designs and builds Milan's metro extensions; tendering the €1.12bn M5 extension to Monza (bids due 15 October 2026).
Refresh proposal 2026-10-03_mm_spa_1. The source quotes are held with the proposal.
3 October 2026rel_circumetnea_awarded_stadlerLabel: Rolling-stock framework (€252.7m, May 2026) → Framework for 15 hydrogen traction units (€252.7m, concluded September 2025)
Since: 2026-05 → 2025-09
Refresh proposal 2026-10-03_rel_circumetnea_awarded_stadler_1. The source quotes are held with the proposal.
3 October 2026rel_rfi_awarded_cinelLabel: Supply of steel blocks, DAC.0195.2026 (August 2026; €32.8m reported) → Supply of steel blocks, DAC.0195.2026, lot 1 of 3 — €2,980,632.45 (concluded 31 August 2026). Lots 2 and 3 went to anot…Refresh proposal 2026-10-03_rel_rfi_awarded_cinel_1. The source quotes are held with the proposal.
3 October 2026rel_rfi_awarded_sviLabel: Full-maintenance-service contract for railway recovery vehicles (September 2026; €69.2m reported) → Motorised recovery vehicles under full maintenance service, lot 1 of 2 — €39,113,000 (concluded 4 September 2026). The…Refresh proposal 2026-10-03_rel_rfi_awarded_svi_1. The source quotes are held with the proposal.
3 October 2026rel_rfi_awarded_vossloh_switchesSince: — → 2025-11Refresh proposal 2026-10-03_rel_rfi_awarded_vossloh_switches_1. The source quotes are held with the proposal.
3 October 2026RATP line 8 maintenance workshop civil worksScope: RATP — new train maintenance workshop for metro line 8 at Créteil/Valenton, civil works, awarded to a Bouygues Bâtiment… → RATP — new train maintenance workshop for metro line 8 at Créteil/Valenton, civil works, awarded to a Bouygues Bâtiment…
2 fields shown only inside editions
Refresh proposal 2026-10-03_t_fr_ratp_amt_ligne8_1. The source quotes are held with the proposal.
3 October 2026RATP industrial supplies distribution framework2 fields shown only inside editionsRefresh proposal 2026-10-03_t_fr_ratp_industrial_supplies_1. The source quotes are held with the proposal.
3 October 2026SNCF Réseau Bordeaux southern rail access AFSB HourcadeStatus detail: — → Contract concluded 24 March 2025; TED published the award notice on 10 April 2026.
1 field shown only inside editions
Refresh proposal 2026-10-03_t_fr_sncf_afsb_hourcade_1. The source quotes are held with the proposal.
3 October 2026SNCF Réseau Bordeaux rail access AFSB civil worksStatus detail: — → Awarded 22 May 2025 and concluded 3 July 2025; TED published the award notice on 15 September 2025.
2 fields shown only inside editions
Refresh proposal 2026-10-03_t_fr_sncf_afsb_oa6_1. The source quotes are held with the proposal.
3 October 2026Rail project operations management multi-holder frameworkValue band: €393.5m → €393.5m framework maximum
3 fields shown only inside editions
Refresh proposal 2026-10-03_t_fr_sncf_reseau_pm_framework_1. The source quotes are held with the proposal.
3 October 2026SNCF Voyageurs electrical maintenance AGC TER 2N TGVValue band: €57.7m → €57.7m framework maximum (no tender value published)
4 fields shown only inside editions
Refresh proposal 2026-10-03_t_fr_sncf_voyageurs_electrical_maintenance_1. The source quotes are held with the proposal.
3 October 2026Tisséo Voyageurs VAL 206 VAL 208 fleet maintenance3 fields shown only inside editionsRefresh proposal 2026-10-03_t_fr_tisseo_metro_maintenance_1. The source quotes are held with the proposal.
3 October 2026BEG1 field shown only inside editionsRefresh proposal 2026-10-03_beg_1. The source quotes are held with the proposal.
3 October 2026DB InfraGO1 field shown only inside editionsRefresh proposal 2026-10-03_db_infrago_1. The source quotes are held with the proposal.
3 October 2026GermanyBodies: ['db_infrago', 'gvb_goerlitz', 'db_fernverkehr', 'db_regio', 'db_projekt_stuttgart_ulm', 'bmv', 'eba', 'beg', 'nvbw', '… → ['db_infrago', 'gvb_goerlitz', 'db_fernverkehr', 'db_regio', 'db_projekt_stuttgart_ulm', 'bmv', 'eba', 'beg', 'nvbw', '…
Bodies tracked: 16 → 25
Live or recent tenders tracked: 27 → 55
Refresh proposal 2026-10-03_germany_region_1. The source quotes are held with the proposal.
3 October 2026go.Rheinland1 field shown only inside editionsRefresh proposal 2026-10-03_go_rheinland_1. The source quotes are held with the proposal.
3 October 2026rel_db_infrago_awarded_strabagLabel: Berlin–Brandenburg line expansion (€105m); Berlin-Köpenick station → Berlin-Köpenick station upgrade for regional services, about €154m (October 2022)
Since: — → 2022-10
Refresh proposal 2026-10-03_rel_db_infrago_awarded_strabag_1. The source quotes are held with the proposal.
3 October 2026rel_db_infrago_awarded_vossloh_turnoutsLabel: Large turnout components for Deutsche Bahn → Large turnout components framework, deliveries to 2028 with two option years (announced March 2026)
Since: — → 2026-03
Refresh proposal 2026-10-03_rel_db_infrago_awarded_vossloh_turnouts_1. The source quotes are held with the proposal.
3 October 2026SWM2 fields shown only inside editionsRefresh proposal 2026-10-03_swm_1. The source quotes are held with the proposal.
3 October 2026DB InfraGO ABS 46/2 Friedrichsfeld raising section3 fields shown only inside editionsRefresh proposal 2026-10-03_t_de_abs462_friedrichsfeld_1. The source quotes are held with the proposal.
3 October 2026BEG Expressverkehr Ostbayern EVO fifteen-yearStatus detail: Submission deadline September 2026. The authority publishes no contract value; participation deadline September 2026; n… → Bids closed 24 September 2026; no award on TED. Read 3 October 2026. The notice of 23 September 2026 extended the date…
5 fields shown only inside editions
Refresh proposal 2026-10-03_t_de_beg_expressverkehr_ostbayern_1. The source quotes are held with the proposal.
3 October 2026Hamburg Port Authority tamping ballast-regulation frameworkStatus detail: Open for requests to participate; deadline September 2026. Negotiated procedure with a prior call for competition; part… → Requests to participate closed 18 September 2026; no award on TED. Read 3 October 2026; negotiated procedure with a pri…
3 fields shown only inside editions
Refresh proposal 2026-10-03_t_de_hpa_hafenbahn_tamping_1. The source quotes are held with the proposal.
3 October 2026franceLabel: Rail public-service contracts awarded by Hauts-de-France (SNCF Voyageurs, July 2026), Nouvelle-Aquitaine lot A (SNCF Vo… → Rail public-service contracts concluded by Hauts-de-France (SNCF Voyageurs, May 2026), Nouvelle-Aquitaine lot A (SNCF V…
Sources: ['ted_t_fr_hdf_rail_concession', 'ted_t_fr_na_psc_poitou'] → ['ted_t_fr_hdf_rail_concession', 'ted_t_fr_na_psc_poitou', 'ted_t_fr_normandie_psc']
Refresh proposal 2026-10-03_mb_france_regional_concessions_1. The source quotes are held with the proposal.
3 October 2026_meta1 field shown only inside editionsRefresh proposal 2026-10-03_meta_france_1. The source quotes are held with the proposal.
3 October 2026FranceLive pipeline band: €15.5bn+ of valued items tracked on TED (Sept 2025 – Sept 2026) → €14.9bn of valued items tracked on TED (July 2025 – September 2026)
1 field shown only inside editions
Refresh proposal 2026-10-03_region_france_1. The source quotes are held with the proposal.
3 October 2026rel_mel_awarded_siemens_mobilityLabel: Lille metro fleet renewal (€445.7m, December 2025) → Lille metro fleet renewal (€445.7m, concluded October 2025)
Since: 2025-12 → 2025-10
Refresh proposal 2026-10-03_rel_mel_awarded_siemens_mobility_1. The source quotes are held with the proposal.
3 October 2026rel_region_hdf_awarded_sncf_groupLabel: Regional rail public service concession — SNCF Voyageurs (€3.01bn, July 2026) → Regional rail public service concession — SNCF Voyageurs (€3.01bn, concluded May 2026)
Since: 2026-07 → 2026-05
Refresh proposal 2026-10-03_rel_region_hdf_awarded_sncf_group_1. The source quotes are held with the proposal.
3 October 2026rel_region_na_awarded_sncf_groupLabel: Regional rail public service contract, lot A Poitou-Charentes — SNCF Voyageurs (€955.9m, July 2026) → Regional rail public service contract, lot A Poitou-Charentes — SNCF Voyageurs (€955.9m, awarded April 2026, concluded…
Since: 2026-07 → 2026-06
Refresh proposal 2026-10-03_rel_region_na_awarded_sncf_group_1. The source quotes are held with the proposal.
3 October 2026rel_sgp_awarded_colas_railLabel: High- and low-voltage, traction and line cabling for line 17 section 17.3 (€42.2m, September 2026) → High- and low-voltage, traction and line cabling for line 17 section 17.3, shared with Bouygues Énergie & Services (€42…
Since: 2026-09 → 2026-07
Refresh proposal 2026-10-03_rel_sgp_awarded_colas_rail_1. The source quotes are held with the proposal.
3 October 2026rel_sncf_reseau_awarded_arcadisLabel: Studies framework (Etudes Emergence) — Arcadis ESG (€52.2m, January 2026) → Etudes Emergence Ferroviaires studies framework, one of fifteen holders (€52.2m framework maximum, concluded January 20…
1 field shown only inside editions
Refresh proposal 2026-10-03_rel_sncf_reseau_awarded_arcadis_1. The source quotes are held with the proposal.
3 October 2026rel_sncf_reseau_awarded_nge_tsoLabel: Gretz–Troyes catenary phase 2 — TSO Caténaires (€30.8m, January 2026) → Gretz–Troyes catenary phase 2 — TSO Caténaires, one of six named winners (€30.8m, concluded December 2025)
Since: 2026-01 → 2025-12
Refresh proposal 2026-10-03_rel_sncf_reseau_awarded_nge_tso_1. The source quotes are held with the proposal.
3 October 2026rel_sncf_reseau_awarded_setecLabel: Accès Alpins / CFAL Nord design (€50.2m, March 2026); digital signalling with Alstom (€50m) → Accès Alpins / CFAL Nord principal design, one of four winners across two lots (€50.2m, concluded January 2026)
Since: 2026-03 → 2026-01
Refresh proposal 2026-10-03_rel_sncf_reseau_awarded_setec_1. The source quotes are held with the proposal.
3 October 2026rel_sncf_reseau_awarded_vinci_afsbLabel: Bordeaux southern rail access civil works GC_OA6 — GTM GC Nouvelle Aquitaine (€48.1m, September 2025); Hourcade works b… → Bordeaux southern rail access civil works GC_OA6 — grouping including GTM GC Nouvelle Aquitaine (€48.1m, concluded July…
Since: 2025-09 → 2025-03
Refresh proposal 2026-10-03_rel_sncf_reseau_awarded_vinci_afsb_1. The source quotes are held with the proposal.
3 October 2026Lyon-Turin CFAL Nord principal design APD2 fields shown only inside editionsRefresh proposal 2026-10-03_t_fr_alpes_moe_1. The source quotes are held with the proposal.
3 October 2026Région Auvergne-Rhône-Alpes regional rail fleet managementValue band: €1.06bn → €1.06bn contracts value; €1.11bn tender value
3 fields shown only inside editions
Refresh proposal 2026-10-03_t_fr_aura_fleet_concession_1. The source quotes are held with the proposal.
3 October 2026DGITM technical legal financial rail advisory frameworkValue band: €25.0m → EUR 25.0m framework maximum; EUR 17.5m procedure estimate; EUR 9.97m winning tender
4 fields shown only inside editions
Refresh proposal 2026-10-03_t_fr_dgitm_rail_advisory_1. The source quotes are held with the proposal.
3 October 2026Gretz-Troyes electrification phase 2 catenary works3 fields shown only inside editionsRefresh proposal 2026-10-03_t_fr_gretz_troyes_catenary_1. The source quotes are held with the proposal.
3 October 2026Île-de-France Mobilités Transilien rail operationStatus detail: — → Awarded 27 May 2026 and concluded 3 June 2026, for a 150-month term.
2 fields shown only inside editions
Refresh proposal 2026-10-03_t_fr_idfm_transilien_contract_1. The source quotes are held with the proposal.
3 October 2026Ligne Nouvelle Montpellier–Perpignan construction Phase 1Status detail: Design-build contract notice first published June 2026 and re-published in September 2026 (notice 616556-2026); deadlin… → Requests to participate close 6 October 2026, so the procedure is open today. The June 2026 notice set a 22 September d…Refresh proposal 2026-10-03_t_fr_lnmp_phase1_1. The source quotes are held with the proposal.
3 October 2026Métropole Européenne de Lille VAL 208 refurbishment1 field shown only inside editionsRefresh proposal 2026-10-03_t_fr_mel_val208_refurbishment_1. The source quotes are held with the proposal.
3 October 2026go.Rheinland1 field shown only inside editionsRefresh proposal 2026-10-03_go_rheinland_2. The source quotes are held with the proposal.
3 October 2026DGITM1 field shown only inside editionsRefresh proposal 2026-10-03_b_dgitm_1. The source quotes are held with the proposal.
3 October 2026RATP2 fields shown only inside editionsRefresh proposal 2026-10-03_b_ratp_1. The source quotes are held with the proposal.
3 October 2026Région Grand Est1 field shown only inside editionsRefresh proposal 2026-10-03_b_region_grand_est_1. The source quotes are held with the proposal.
3 October 2026Région Hauts-de-FranceMandate: Lets the Hauts-de-France regional rail public service concession, awarded to SNCF Voyageurs at €3,011,700,000 as publis… → Lets the Hauts-de-France regional rail public service concession, awarded to SNCF Voyageurs in a contract concluded in…Refresh proposal 2026-10-03_b_region_hdf_1. The source quotes are held with the proposal.
3 October 2026Région Nouvelle-AquitaineMandate: Is the mobility organising authority for a regional network of 32 railway lines and buys the trains itself, while SNCF… → Is the mobility organising authority for a regional network of 32 railway lines and buys the trains itself, while SNCF…Refresh proposal 2026-10-03_b_region_na_1. The source quotes are held with the proposal.
3 October 2026RTM3 fields shown only inside editionsRefresh proposal 2026-10-03_b_rtm_1. The source quotes are held with the proposal.
3 October 2026SGP6 fields shown only inside editionsRefresh proposal 2026-10-03_b_sgp_1. The source quotes are held with the proposal.
3 October 2026SNCF Réseau7 fields shown only inside editionsRefresh proposal 2026-10-03_b_sncf_reseau_1. The source quotes are held with the proposal.
3 October 2026SNCF Voyageurs2 fields shown only inside editionsRefresh proposal 2026-10-03_b_sncf_voyageurs_1. The source quotes are held with the proposal.
3 October 2026france2 fields shown only inside editionsRefresh proposal 2026-10-03_mb_france_competition_effect_1. The source quotes are held with the proposal.
3 October 2026Société des grands projets voltage traction cabling 17.3Status detail: — → Awarded 23 June 2026 and concluded 28 July 2026, for a 60-month term. TED published the award notice on 8 September 202…
2 fields shown only inside editions
Refresh proposal 2026-10-03_t_fr_sgp_htbt_l17_3_1. The source quotes are held with the proposal.
3 October 2026Track catenary Grand Paris Express 17 section 17.32 fields shown only inside editionsRefresh proposal 2026-10-03_t_fr_sgp_track_l17_3_1. The source quotes are held with the proposal.
3 October 2026Région Nouvelle-Aquitaine Poitou-Charentes rail serviceStatus detail: — → Awarded 20 April 2026 and concluded 9 June 2026, for a ten-year term. TED published the award notice on 9 July 2026.
2 fields shown only inside editions
Refresh proposal 2026-10-03_t_fr_na_psc_poitou_1. The source quotes are held with the proposal.
3 October 2026Métropole Européenne de Lille metro fleet renewalStatus detail: — → Contract concluded 22 October 2025; TED published the award notice on 8 December 2025.
1 field shown only inside editions
Refresh proposal 2026-10-03_t_fr_mel_metro_fleet_1. The source quotes are held with the proposal.
3 October 2026Région Hauts-de-France regional rail concessionStatus detail: Concession of 126 months with a start date of June 2025; the award notice was published in July 2026, so the contract i… → Concession concluded 28 May 2026, running 126 months from 2 June 2025. TED published the award notice on 13 July 2026.
1 field shown only inside editions
Refresh proposal 2026-10-03_t_fr_hdf_rail_concession_1. The source quotes are held with the proposal.
3 October 2026DB InfraGO Karlsruhe–Basel upgrade PfA 9.2Status detail: Open for bids; submission deadline October 2026. DB InfraGO publishes no value. → Open for bids to 19 October 2026. The notice of 21 September 2026 extended the date from 5 October. DB InfraGO publishe…
4 fields shown only inside editions
Refresh proposal 2026-10-03_t_de_infrago_kaba_pfa92_1. The source quotes are held with the proposal.
3 October 2026VRR NWL Rhein-Emscher-Express RE 3 franchiseStatus detail: Open for bids; submission deadline October 2026. The authorities publish no contract value. → Open for bids to 6 November 2026. The notice of 1 October 2026 extended the date from 5 October, the third extension on…
4 fields shown only inside editions
Refresh proposal 2026-10-03_t_de_vrr_rhein_emscher_express_re3_1. The source quotes are held with the proposal.
3 October 2026DB InfraGO München-Pasing north platform constructionStatus: Open → Bids closed
Status detail: Open for requests to participate; deadline September 2026. Negotiated procedure with a prior call for competition. DB I… → Requests to participate closed 28 September 2026; no award on TED. Read 3 October 2026; negotiated procedure with a pri…
1 field shown only inside editions
Refresh proposal 2026-10-03_t_de_infrago_pasing_nordbahnsteig_1. The source quotes are held with the proposal.
3 October 2026DB InfraGO Nordmainische S-Bahn Frankfurt-Fechenheim sectionStatus: Open → Bids closed
Status detail: Open for requests to participate; deadline October 2026. Negotiated procedure with a prior call for competition. DB Inf… → Requests to participate closed 2 October 2026; no award on TED. Read 3 October 2026; negotiated procedure with a prior…
1 field shown only inside editions
Refresh proposal 2026-10-03_t_de_infrago_nordmainische_fechenheim_1. The source quotes are held with the proposal.
3 October 2026TLBV BEG Südthüringen-Unterfranken-Netz SUNStatus: Open → Bids closed
Status detail: Open for bids; submission deadline September 2026. The authorities publish no contract value. → Bids closed 24 September 2026; no award on TED. Read 3 October 2026. The authorities publish no contract value.
1 field shown only inside editions
Refresh proposal 2026-10-03_t_de_tlbv_suedthueringen_unterfranken_1. The source quotes are held with the proposal.
3 October 2026DB InfraGO Korridorsanierung Remagen–Mainz Left RhineStatus detail: Open for requests to participate; deadline October 2026. Negotiated procedure with a prior call for competition. DB Inf… → Open for requests to participate to 15 October 2026. The notice of 29 September 2026 extended the date from 1 October;…
3 fields shown only inside editions
Refresh proposal 2026-10-03_t_de_infrago_korridor_remagen_mainz_1. The source quotes are held with the proposal.
29 September 2026STARFour Specialist Technical Commercial Advisory RailStatus detail: Competitive flexible procedure at selection stage; requests to participate (procurement-specific questionnaire) due Sep… → Competitive flexible procedure at selection stage. Requests to participate (procurement-specific questionnaire) were du…Refresh proposal 2026-09-29_t_dft_starfour_1. The source quotes are held with the proposal.
23 September 2026Saskatchewan2 fields shown only inside editionsRefresh proposal 2026-09-22_saskatchewan_2. The source quotes are held with the proposal.
23 September 2026SaskatchewanHeadline: Saskatchewan has no rail transit system — Saskatoon Transit and Regina Transit are both bus-only. Freight moves on CN a… → Saskatchewan has no rail transit system — Saskatoon Transit and Regina Transit are both bus-only. Freight moves on CN a…Refresh proposal 2026-09-22_saskatchewan_1. The source quotes are held with the proposal.
23 September 2026Saskatchewan Highways1 field shown only inside editionsRefresh proposal 2026-09-23_b_sk_highways_source_fix. The source quotes are held with the proposal.
23 September 2026Saskatchewan HighwaysMandate: Provincial ministry responsible for Saskatchewan's roughly 26,000 km highway network and, through its Policy and Progra… → Provincial ministry responsible for Saskatchewan's roughly 26,000 km highway network and, through its Policy and Progra…
Type detail: Provincial ministry (formerly the Ministry of Highways and Infrastructure) — highway network, transportation policy and… → Provincial ministry (formerly the Ministry of Highways and Infrastructure) — highway network, transportation policy, sa…
2 fields shown only inside editions
Refresh proposal 2026-09-22_b_sk_highways_3. The source quotes are held with the proposal.
23 September 2026Saskatchewan Highways4 fields shown only inside editionsRefresh proposal 2026-09-22_b_sk_highways_4. The source quotes are held with the proposal.
23 September 2026CN CPKC mainline rail link GTHAStatus detail: Committed and expensed in full by 31 March 2025 per the GTHA's FY2024-25 audited financial statements (Note 14); a gove… → Complete: committed and expensed in full by 31 March 2025 per the GTHA's FY2024-25 audited financial statements (Note 1…Refresh proposal 2026-09-22_t_sk_gth_2024_cn_cp_link_15m_5. The source quotes are held with the proposal.
22 September 2026BEG Expressverkehr Ostbayern EVO fifteen-yearStatus detail: Open for bids; submission deadline 21 September 2026. The authority publishes no contract value; participation deadline… → Submission deadline 21 September 2026. The authority publishes no contract value; participation deadline 2026-09-21; no…Refresh proposal 2026-09-22_t_de_beg_expressverkehr_ostbayern_detailfix. The source quotes are held with the proposal.
22 September 2026DB InfraGO steel sleeper supply framework 2027Status detail: Open for requests to participate; deadline 21 September 2026. Negotiated procedure with a prior call for competition. D… → Deadline 21 September 2026. Negotiated procedure with a prior call for competition. DB InfraGO publishes no value; part…Refresh proposal 2026-09-22_t_de_infrago_stahlgleisschwelle_2027_detailfix. The source quotes are held with the proposal.
22 September 2026DB InfraGO E/M accompanying works framework 2027Status detail: Open for requests to participate; deadline 21 September 2026. Negotiated procedure with a prior call for competition, s… → Deadline 21 September 2026. Negotiated procedure with a prior call for competition, so the date is the request-to-parti…Refresh proposal 2026-09-22_t_de_infrago_whz_obp2027_detailfix. The source quotes are held with the proposal.
22 September 2026Stadtwerke München Tram Westtangente construction sectionStatus detail: Open for bids; submission deadline 21 September 2026. SWM publishes no value; participation deadline 2026-09-21; no awa… → Submission deadline 21 September 2026. SWM publishes no value; participation deadline 2026-09-21; no award on Tenders E…Refresh proposal 2026-09-22_t_de_swm_tram_westtangente_ba3_detailfix. The source quotes are held with the proposal.
22 September 2026CFR SA central systems cybersecurity railway ITStatus detail: Participation deadline 21 September 2026, 15:00; bids can still be submitted; participation deadline 2026-09-21; no awa… → Participation deadline 21 September 2026, 15:00; participation deadline 2026-09-21; no award on Tenders Electronic Dail…Refresh proposal 2026-09-22_t_ro_cfr_cyber_architecture_detailfix. The source quotes are held with the proposal.
22 September 2026Municipiul București Bd. Dimitrie Pompeiu tram extensionStatus detail: Participation deadline 21 September 2026; bids can still be submitted; participation deadline 2026-09-21; no award on T… → Participation deadline 21 September 2026; participation deadline 2026-09-21; no award on Tenders Electronic Daily (TED)…Refresh proposal 2026-09-22_t_ro_pmb_pompeiu_tram_detailfix. The source quotes are held with the proposal.

Spotted an error? Write to partners@mainline-railway.com. Every correction is owned by the Managing Partner, who spot-checks output and signs off on fixes. A corrected record shows the change on the page.