NBIF Southern Rail Connection
NBIF Southern Rail Connection - about 15 track miles linking the yard to existing CSX and Norfolk Southern infrastructure, design ongoing
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Buyer
- South Carolina State Ports Authority (SC Ports)
- Where
- South Carolina · North Charleston
- Segments
- Track, Civil works
- Technology areas
- Track & civil
- Status
- Planned — SC Ports says design of the Southern Rail Connection is ongoing; no contract is published.
- Value band
- No cost published
- Currency
- USD
- Key dates (month)
- Status read October 2026
Next step
Withheld in the free surface
- Full scope
- How the figure was arrived at
- Key dates (1)
Full detail withheld: 3 fields. In the United States edition · See a fully open example
1 source · primary
- ● SC Ports Authority · Navy Base Intermodal Facility page: status 'construction is nearly complete', 118-acre site, 1 million rail lifts a year, six rail-mounted gantry cranes, Southern Rail Connection of about 15 track miles with design ongoing. Undated page; scspa.com sub-pages return HTTP 403 to curl and were read through a fetch tool. Read 8 October 2026. (checked 2026-10-08)
Related tenders
Same buyer first, then the same segment in this market.
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Ashmont and Mattapan Infrastructure Upgrades | MBTA | Open | $100–500m | |
| Navy Base Intermodal Facility rail yard | SC Ports | In execution | $500m–1bn | |
| Inland Port Greer expansion | SC Ports | In execution | $25–100m |
Show all 6 related tenders
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Light Rail Modernization Program Tranche 3 Cromwell Facility | MDOT MTA | Open | estimated cost class L: over $100 million, in MTA's own construction look-ahead of August 2026; MTA publishes no contract value | Published July 2026 |
| Red Line Hi-Rail Access Tunnel Alewife | MBTA | Open | $25–100m | |
| Light Rail Metro Facilities Ancillary maintenance construction | MDOT MTA | Open | estimated cost class H: $15 million to $30 million, for the matching line in MTA's own on-call master contract look-ahead of August 2026; MTA publishes no contract value |
Browse: the Atlas · United States · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.