NBIF Southern Rail Connection

NBIF Southern Rail Connection - about 15 track miles linking the yard to existing CSX and Norfolk Southern infrastructure, design ongoing

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Buyer
South Carolina State Ports Authority (SC Ports)
Where
South Carolina · North Charleston
Segments
Track, Civil works
Technology areas
Track & civil
Status
Planned — SC Ports says design of the Southern Rail Connection is ongoing; no contract is published.
Value band
No cost published
Currency
USD
Key dates (month)
Status read October 2026

Next step

Planned — no solicitation published.

Read the notice: SC Ports Authority ↗

Withheld in the free surface

  • Full scope
  • How the figure was arrived at
  • Key dates (1)

Full detail withheld: 3 fields. In the United States edition · See a fully open example

1 source · primary
  • ● SC Ports Authority · Navy Base Intermodal Facility page: status 'construction is nearly complete', 118-acre site, 1 million rail lifts a year, six rail-mounted gantry cranes, Southern Rail Connection of about 15 track miles with design ongoing. Undated page; scspa.com sub-pages return HTTP 403 to curl and were read through a fetch tool. Read 8 October 2026. (checked 2026-10-08)

Related tenders

Same buyer first, then the same segment in this market.

TenderBuyerStatusValue bandNext key date
Ashmont and Mattapan Infrastructure UpgradesMBTAOpen$100–500m
Navy Base Intermodal Facility rail yardSC PortsIn execution$500m–1bn
Inland Port Greer expansionSC PortsIn execution$25–100m
Show all 6 related tenders
TenderBuyerStatusValue bandNext key date
Light Rail Modernization Program Tranche 3 Cromwell FacilityMDOT MTAOpenestimated cost class L: over $100 million, in MTA's own construction look-ahead of August 2026; MTA publishes no contract valuePublished July 2026
Red Line Hi-Rail Access Tunnel AlewifeMBTAOpen$25–100m
Light Rail Metro Facilities Ancillary maintenance constructionMDOT MTAOpenestimated cost class H: $15 million to $30 million, for the matching line in MTA's own on-call master contract look-ahead of August 2026; MTA publishes no contract value