Assembly Street rail corridor consolidation
Assembly Street Railroad Corridor and Consolidation - consolidation and grade separation of Norfolk Southern and CSX lines south of downtown Columbia
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Buyer
- City of Columbia, South Carolina
- Where
- South Carolina · Columbia
- Segments
- Track, Civil works
- Technology areas
- Track & civil
- Status
- Planned — FRA selected a crossing-elimination grant for the project in January 2025.
- Value band
- $100–500m
- Currency
- USD
- Key dates (month)
- Pe agreements November 2021 · Fra agreement period October 2017 · Fra rce selection announced January 2025
Status in full
Read more
FRA selected a crossing-elimination grant for the project in January 2025. Environmental review and design were under way in 2025, and no construction contract is published.
Next step
Withheld in the free surface
- Full scope
- Exact value
- How the figure was arrived at
- Key dates (3)
Full detail withheld: 4 fields. In the United States edition · See a fully open example
5 sources · 3 primary
- ● SCDOT / FRA · South Carolina Statewide Rail Plan 2024 (Cambridge Systematics for SCDOT, November 2024) bound with the FRA acceptance letter of 8 May 2025: funding sources, projects under construction (Table 4-2), unfunded needs (Tables 4-3, 4-7, 5-1), Palmetto Railways profile, CRISI, INFRA and BUILD awards. Read 8 October 2026. (published 2025-05-08 · checked 2026-10-08)
- ● SCDOT · 2022 Rail Plan Analysis Implementation Update, January 2023, filed with the General Assembly: SCDOT as State Rail Transportation Authority, BUILD award for the Upstate Express project, Camp Hall INFRA award, Assembly Street consolidation. Read 8 October 2026. (published 2023-01 · checked 2026-10-08)
- ● Office of Rep. James E. Clyburn · Release of 10 January 2025: USDOT/FRA Rail Crossing Elimination Grant Program awards of $204.2 million for the Assembly Street Railroad Project in Columbia and $940,000 for Rivers Avenue grade separation planning in North Charleston. FRA's own selections PDF returns 403. (published 2025-01-10 · checked 2026-10-08)
- ○ SCBIZ · 'Columbia receives $204M in federal funding for railroad improvements', 16 January 2025 (Secondary): City of Columbia, Railroad Crossing Elimination Grant Program, Assembly Street Railroad Separation Project, 20 per cent non-federal match from the city, Richland County and SCDOT. (published 2025-01-16 · checked 2026-10-08)
- ○ The Columbia Star · 'Railroad improvements move one step closer', 16 January 2025 (Secondary): funding stack of $279 million ($204 million RCE, $10 million congressionally directed spending, $35 million State, $5 million City, $25 million pending Richland County penny), estimated total $265 to $305 million. (published 2025-01-16 · checked 2026-10-08)
Related tenders
Same buyer first, then the same segment in this market.
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Ashmont and Mattapan Infrastructure Upgrades | MBTA | Open | $100–500m | |
| Light Rail Modernization Program Tranche 3 Cromwell Facility | MDOT MTA | Open | estimated cost class L: over $100 million, in MTA's own construction look-ahead of August 2026; MTA publishes no contract value | Published July 2026 |
| Red Line Hi-Rail Access Tunnel Alewife | MBTA | Open | $25–100m |
Show all 6 related tenders
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Light Rail Metro Facilities Ancillary maintenance construction | MDOT MTA | Open | estimated cost class H: $15 million to $30 million, for the matching line in MTA's own on-call master contract look-ahead of August 2026; MTA publishes no contract value | |
| MARC Mechanical Ancillary maintenance construction master contract | MDOT MTA | Open | estimated cost class G: $10 million to $15 million, for the matching line in MTA's own on-call master contract look-ahead of August 2026; MTA publishes no contract value | |
| CTA Red Line Extension 120th Street yard shop | CTA | Open | over $20m projected (CTA Buying Plan projection, not an award) | Closes October 2026 |
Browse: the Atlas · United States · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.