Eagle River Bridge 127.5 Replacement
Replacement of the 308-foot Eagle River deck girder bridge at MP 127.5 with a 360-foot triple-span deck plate girder bridge, funded by an FTA State of Good Repair grant
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the United States edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Buyer
- Alaska Railroad Corporation
- Where
- Alaska · Anchorage
- Segments
- Civil works, Track
- Technology areas
- Track & civil
- Status
- In execution — Kiewit is building the bridge, with construction running into the second quarter of 2027.
- Value band
- $25–100m
- Currency
- USD
- Key dates (month)
- Grant signed May 2025 · Construction start April 2025 · Construction end planned 2027 · Completion estimated December 2027 · Grant performance end March 2028
Next step
Recorded award: Alaska Railroad — State of Good Repair grant, Eagle River Bridge 127.5 replacement
Withheld in the free surface
- Full scope
- Exact value
- How the figure was arrived at
- Key dates (5)
- Published bidders
Full detail withheld: 5 fields. In the United States edition · See a fully open example
2 sources · all primary
- ● Alaska Railroad fact sheet: Bridge 127.5 Replacement · Eagle River bridge replacement: new 360-foot triple-span bridge, contractor selected 2022, construction from April 2025 into the second quarter of 2027, completion estimated end 2027, 80% FTA funded (published 2026-04-13 · checked 2026-10-08)
- ● USAspending award AK-2025-014 · FTA State of Good Repair grant to Alaska Railroad Corporation for phase 1 of the bridge replacement at MP 127.5: federal 33,390,210, non-federal 8,347,553, signed 5 May 2025, performance to 31 March 2028 (published 2025-05-05 · checked 2026-10-08)
Related tenders
Same buyer first, then the same segment in this market.
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Ship Creek Bridge 114.3 Replacement | Alaska Railroad | In execution | $5–25m | Completion September 2025 |
| Whittier Portage Tunnel Upgrade and Well Cars | Alaska Railroad | Planned | $25–100m | |
| Track Rehabilitation and Commuter Locomotive Overhaul | Alaska Railroad | Planned | $5–25m |
Show all 6 related tenders
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| Positive Train Control Vital Functions | Alaska Railroad | In execution | $5–25m | |
| Hurricane Gulch Bridge rehabilitation | Alaska Railroad | Planned | $25–100m | |
| Willow Bridge 190.5 Replacement | Alaska Railroad | Planned | $5–25m |
Browse: the Atlas · United States · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.