Nebraska
5 buyers · 12 tenders · checked 2026-10-08
Omaha's streetcar build, a Lincoln viaduct selection and two short-line FRA grants; NDOT buys crossings, not trains.
Everything here is free. One market edition opens in full with one email. Open your free edition
0Metro systems operating
5Buyers tracked
12Tenders tracked
5Cities tracked
Omaha Streetcar under construction; Amtrak California Zephyr; 12 freight operators on 3,375 miles of track; no metro or commuter railRail systems note
- Live pipeline
- Omaha Streetcar programme: $421m City bond estimate (programme figure, July 2025); Kiewit mainline contract: $210.4m guaranteed maximum price ($215.8m after change order); Utilities East 4B: $71.86m (all schedules); CAF vehicles: $41.1m plus escalation (board award; CAF cites about US$54m); maintenance facility: $26.68m; I-480 bridges: $20.60m; Utilities West 4A: $10.53m; operations contract and special trackwork: awards pending, no value published; Lincoln 33rd/Cornhusker viaduct: up to $66.7m FRA selection; Nebraska Central grants: $8.18m and $6.32m; Manning Rail grant: $5.43m
- Technology areas
- Track & civil, Rolling-stock hardware, Electrification
Key figures
Freight track3,375 miles
1 source · primary
- ● NDOT Rail Division page · NDOT's Rail Division page: mission, 12 freight operators, 3,375 miles of freight track, 3,002 public crossings, 702 with safety devices, and links to older Nebraska rail studies (published 2026-10-08 · checked 2026-10-08)
Omaha Streetcar estimate$421m
2 sources · all secondary
- ○ WOWT report on the streetcar cost update (8 July 2025) · TV report: the Mayor put the bond estimate at $421m, up from $389m at 60 percent design in June 2024 and below the $440m bond authority; design at 100 percent, most key contracts let, completion goal 2028. Secondary (published 2025-07-08 · checked 2026-10-08)
- ○ Wikipedia, Omaha Streetcar · Encyclopedia summary of the City's bond ordinances: $440m approved 13 December 2022 ($360m TIF revenue bonds, $80m lease-revenue bonds), later series, six CAF Urbos vehicles, opening moved to 2028. Secondary: the ordinances themselves were not read because cityofomaha.org returns 403 (published 2026-08-01 · checked 2026-10-08)
Lincoln viaduct selection$66.7m
2 sources · all secondary
- ○ US Senate office release on Nebraska Railroad Crossing Elimination awards (15 January 2025) · Release listing three FRA Railroad Crossing Elimination awards totalling about $67.9m: 33rd/Cornhusker Viaduct in Lincoln $66,706,880, and $600,000 each for the Grand Island and Omaha to Lincoln studies. Secondary: railroads.dot.gov returns 403 (published 2025-01-15 · checked 2026-10-08)
- ○ 10/11 Now report on the Lincoln viaduct grant (10 January 2025) · TV report: up to $66.7m from FRA for a bridge over the rail corridor eliminating the North 33rd Street and Adams Street crossings; BNSF, the City and the Railroad Transportation Safety District provide a 20 percent match; recipient not explicitly named, total project cost not stated. Secondary (published 2025-01-10 · checked 2026-10-08)
Omaha to Lincoln study142 crossings
1 source · primary
- ● NDOT Omaha to Lincoln Rail Crossing Safety Improvement Plan site · NDOT's study site: 142 crossings over 64.5 miles of BNSF corridor, FRA-funded, schedule from March 2026 to a final plan in early summer 2027 (published 2026-10-08 · checked 2026-10-08)
Short-line FRA grants$19.9m
3 sources · all primary
- ● USAspending award 69A36520401460CRSNE · FRA CRISI-line project grant to Nebraska Central Railroad Company, NCRC infrastructure improvements project; federal $8,181,640 with non-federal $6,694,069; performance 1 May 2020 to 31 July 2027 (published 2026-02-17 · checked 2026-10-08)
- ● USAspending award 69A36524420300CRSNE · FRA grant to Nebraska Central Railroad Company for four rail sidings; federal $6,317,982 with non-federal $4,390,462; signed 6 March 2024; performance to 31 October 2026; track leased from Union Pacific (published 2024-03-18 · checked 2026-10-08)
- ● USAspending award 69A36525421410CRSNE · FRA grant to Manning Rail, Inc. (Fairmont, Fillmore County) to upgrade a line for grain shuttle trains; federal $5,433,342 with non-federal $1,822,834; signed 23 September 2025; performance to 30 April 2028 (published 2025-09-29 · checked 2026-10-08)
State Rail Plan ActLB1098
1 source · primary
- ● Nebraska Legislature, LB1098 State Rail Plan Act (as introduced) · Bill text as introduced, read first time 16 January 2026, referred to Transportation and Telecommunications Committee: designates NDOT the rail transportation authority, annual passenger-rail study, state rail plan by 30 June 2027. Status after introduction not checked (published 2026-01-16 · checked 2026-10-08)
Streetcar extension studyNorth 24th Street study
1 source · secondary
- ○ WOWT report on a North 24th Street extension study (5 August 2026) · TV report: federal funds secured to study extending the Omaha Streetcar towards North 24th Street; the amount and programme are not stated in the article. Secondary (published 2026-08-05 · checked 2026-10-08)
Buyers
| Buyer | Type | Tenders | Contracts awarded |
|---|---|---|---|
| Omaha Streetcar Authority | Transit authority | 8 | 2 |
| Nebraska Central Railroad Company | Freight railroad | 2 | 0 |
| City of Lincoln (Transportation and Utilities) | Other | 1 | 0 |
| Manning Rail, Inc. | Freight railroad | 1 | 0 |
| Nebraska Department of Transportation, Rail Division | State DOT | 0 | 0 |
Tenders
Cities
| City | Network status | Networks |
|---|---|---|
| Norfolk | base of the Nebraska Central Railroad, a short line on Union Pacific-leased branches with two FRA grants in execution. | |
| Omaha | streetcar under construction and Union Pacific headquarters - the Omaha Streetcar starter line is being built along Farnam and Harney Streets for opening in 2028; Union Pacific's headquarters and its Harriman Dispatching Center are in the city; Amtrak's California Zephyr is the only passenger train. | Omaha Streetcar (under construction) |
| Lincoln | state capital with the NDOT headquarters and a funded crossing project - the 33rd and Cornhusker viaduct would replace two BNSF crossings; the Omaha to Lincoln crossing study covers the BNSF corridor to Omaha. | |
| North Platte | Union Pacific's Bailey Yard, the largest railroad classification yard in the world at about 2,850 acres; a private facility with no public programme found. | |
| Fairmont | home of Manning Rail, a seven-mile grain short line tied into BNSF, with an FRA grant for a track upgrade. |
Withheld in the free surface
- Capex in this region (3)
- Live pipeline value (2)
- Market narrative
Full detail withheld: 3 fields. In the United States edition · See a fully open example
- Note
- Methodology note
Full detail withheld: 2 fields. In the United States edition · See a fully open example
Sources
- ○ Flatwater Free Press report of the Omaha Streetcar Authority meeting of 15 December 2025 · Report: unanimous approval of a $5.38m change order to the Kiewit Construction contract for a track and power test section; completion expected September 2028; streetcars expected 2027; total Kiewit contract value not stated. Secondary; article posted 5 January 2026 (published 2026-01-05 · checked 2026-10-08)
- ● NDOT Rail Funding Information page · NDOT's page on the two crossing-safety funding sources: the Grade Crossing Protection Fund ($30,000 a month from the Highway Trust Fund, state share 95 percent) and the federal Section 130 programme (published 2026-10-08 · checked 2026-10-08)
- ● NDOT Rail Division page · NDOT's Rail Division page: mission, 12 freight operators, 3,375 miles of freight track, 3,002 public crossings, 702 with safety devices, and links to older Nebraska rail studies (published 2026-10-08 · checked 2026-10-08)
- ● Nebraska Legislature, LB1098 State Rail Plan Act (as introduced) · Bill text as introduced, read first time 16 January 2026, referred to Transportation and Telecommunications Committee: designates NDOT the rail transportation authority, annual passenger-rail study, state rail plan by 30 June 2027. Status after introduction not checked (published 2026-01-16 · checked 2026-10-08)
- ● Omaha Streetcar Authority, Bid Results & Tabulations · Authority's own bid-results page and Package 3B bid tabulation (opened 18 Dec 2024). 403 to curl; read from Internet Archive copy of 3 March 2026 (published 2025-06-16 · checked 2026-10-08)
- ● Union Pacific, North Platte train town page · Union Pacific's own page: Bailey Yard is the largest railroad classification yard in the world, about 2,850 acres and eight miles long (published 2026-10-08 · checked 2026-10-08)
- ● Union Pacific, Omaha train town page · Union Pacific's own page: headquarters at 14th and Douglas Streets, Omaha; the Harriman Dispatching Center dispatches trains across the 23-state network; Omaha Shops founded 1863 (published 2026-10-08 · checked 2026-10-08)
- ● USAspending query: FRA awards with Nebraska place of performance since FY2019 · API search listing every FRA-awarded project grant in Nebraska since 1 October 2018: the three railroad grants above, one at $4,505,542 to Nebraska Kansas & Colorado Railway (completed August 2024), the NDOT planning grant, and university research grants (published 2026-10-08 · checked 2026-10-08)
- ○ WOWT report on a North 24th Street extension study (5 August 2026) · TV report: federal funds secured to study extending the Omaha Streetcar towards North 24th Street; the amount and programme are not stated in the article. Secondary (published 2026-08-05 · checked 2026-10-08)
- ○ WOWT report on the streetcar cost update (8 July 2025) · TV report: the Mayor put the bond estimate at $421m, up from $389m at 60 percent design in June 2024 and below the $440m bond authority; design at 100 percent, most key contracts let, completion goal 2028. Secondary (published 2025-07-08 · checked 2026-10-08)
- ○ WOWT report on the maintenance facility contract (13 January 2025) · TV report: the Omaha Streetcar Authority board approved $26,680,000 to Sampson Construction Co. Inc. as lowest and best of three bids opened 18 December 2024 (Hausmann $27.9m, Hawkins $29m). Secondary: omahastreetcar.org returns 403 (published 2025-01-13 · checked 2026-10-08)