Missouri
5 buyers · 22 tenders · checked 2026-10-07
Bi-State's MetroLink fleet replacement and tunnel works, Kansas City's two streetcar extensions and MoDOT's Amtrak and bridge grants are Missouri's rail buying programmes.
Everything here is free. One market edition opens in full with one email. Open your free edition
2Metro systems operating
5Buyers tracked
22Tenders tracked
2Cities tracked
- Live pipeline
- Bi-State draft FY2027-29 capital budget: $934.9m (programme; includes $247.8m light rail vehicle purchases); Siemens MetroLink vehicles: $390.4m contract for up to 55 cars (Bi-State); Union Station tunnel: $56m draft-budget line (Bi-State); KCI Construction tunnel track contract: $6.17m ceiling; FTA state-of-good-repair grants to Bi-State: $26.6m to $35.2m each; Norfolk Southern Grand River Bridge: $17.25m USDOT grant (MoDOT); U.S. 60 BNSF overpass: $10.4m FRA CRISI grant (MoDOT); Missouri River Runner: $16m state support in FY2025 (MoDOT); TRRA bridge grants: $28.8m, $20.0m and $7.2m (FRA)
- Technology areas
- Rolling-stock hardware, Track & civil, Signalling & train control, Electrification, Predictive maintenance, Digital operations
Key figures
MetroLink Siemens fleet order$390.4m; up to 55 vehicles
2 sources · all primary
- ● Metro Transit St. Louis: Contract for New MetroLink Vehicles Approved · NextStop blog release of 29 November 2023: board approved a $390.4 million contract with Siemens Mobility for up to 55 high-floor light rail vehicles; 75 vehicles in the existing fleet; $196 million federal funding. (published 2023-11-29 · checked 2026-10-07)
- ● Metro Transit St. Louis: Light Rail Vehicle (LRV) Replacement project page · Project page: 55 new vehicles, Siemens, built in Sacramento, design review phase, first deliveries expected 2027, $196.2 million FTA grant. (published 2026 · checked 2026-10-07)
FTA grant for MetroLink vehicles$196.3m
1 source · primary
- ● USAspending.gov: FTA grant MO-2024-021, Bi-State Development · Federal award record: $196,296,401, CFDA 20.525 (State of Good Repair), 1 August 2024 to 30 October 2032; competitive rail vehicle replacement funding for the St. Louis urbanized area; programmed project $392,592,802 ($196,296,401 federal, $117,777,841 federal match, $78,518,561 local). (published 2024-08-01 · checked 2026-10-07)
Bi-State three-year capital draft$934.9m
2 sources · all primary
- ● Bi-State Development: Board of Commissioners special meeting materials, 26 March 2026 · Board packet with the draft FY2027 Operating and Capital Budget (Resolution 1470): three-year capital budget FY2027-FY2029, project-type summary, Union Station Tunnel line. Retrieved with a browser user-agent. (published 2026-03-26 · checked 2026-10-07)
- ● Bi-State Development: Board of Commissioners open meeting materials, 12 June 2026 · Board packet containing the open-session minutes of 14 May 2026: Resolution 1491 (sole-source, Union Station tunnel track rehabilitation, KCI Construction), Resolution 1492 (Millstone Weber, McDonnell Boulevard tunnel track), Resolution 1485 (Modjeski & Masters design modification), budget status and Green Line BRT remarks. Retrieved with a browser user-agent. (published 2026-06-12 · checked 2026-10-07)
KC Streetcar federal grant$174.1m
3 sources · all primary
- ● USAspending.gov: FTA grant MO-2021-001, City of Kansas City (KC Streetcar South Extension) · Federal award record: $174,059,270, CFDA 20.500 (Capital Investment Grants), 9 January 2021 to 31 December 2028, recipient City of Kansas City, titled KC Streetcar South Extension. (published 2021-01-09 · checked 2026-10-07)
- ● KC Streetcar: ridership release after the Main Street Extension opened · Release of 10 December 2025: average weekday ridership rose from about 4,000 before 24 October 2025 to about 10,000 once the Main Street Extension opened. (published 2025-12-10 · checked 2026-10-07)
- ● KC Streetcar: Riverfront Extension Grand Opening page · Page: grand opening ceremony Monday 18 May 2026, after which the Riverfront Extension opens for full passenger service between UMKC and the Riverfront. (published 2026-05-18 · checked 2026-10-07)
Missouri River Runner state support$16m
1 source · primary
- ● MoDOT: Missouri River Runner 2026 Economic Impact Study handout · Handout: 194,276 passengers in 2024; two daily round trips over 283 miles between St. Louis and Kansas City; in FY2025 MoDOT received $16 million in state support for operation; no dedicated state funding source for passenger rail, funding is a yearly general revenue appropriation. (published 2026 · checked 2026-10-07)
TRRA bridge grants$28.8m
3 sources · all primary
- ● USAspending.gov: FRA CRISI grant 69A36522403380CRSMO, Terminal Railroad Association of St. Louis · Federal award record: $28,790,947, CFDA 20.325 (CRISI), 1 May 2022 to 31 January 2029, signed 25 August 2022; rehabilitate the bridge to a state of good repair for freight and passenger rail (the record does not name the bridge). (published 2022-08-25 · checked 2026-10-07)
- ● USAspending.gov: FRA CRISI grant 69A36521402540CRSMO, Terminal Railroad Association of St. Louis · Federal award record: $20,032,989.16, CFDA 20.325, 1 February 2021 to 31 January 2024, signed 4 February 2021; titled The Merchants Bridge Rehabilitation Program. (published 2021-02-04 · checked 2026-10-07)
- ● USAspending.gov: FRA CRISI grant 69A36520401670CRSMO, Terminal Railroad Association of St. Louis · Federal award record: $7,170,346, CFDA 20.325, 1 August 2020 to 31 December 2023, signed 1 September 2020; replacement of the MacArthur Bridge truss over South Broadway. (published 2020-09-01 · checked 2026-10-07)
Buyers
| Buyer | Type | Tenders | Contracts awarded |
|---|---|---|---|
| Bi-State Development (Metro Transit St. Louis) | Transit authority | 14 | 2 |
| Missouri Department of Transportation | State DOT | 3 | 0 |
| Terminal Railroad Association of St. Louis | Freight railroad | 3 | 0 |
| Kansas City Area Transportation Authority | Transit authority | 1 | 0 |
| Kansas City Streetcar Authority | Transit authority | 1 | 0 |
Tenders
Cities
| City | Network status | Networks |
|---|---|---|
| St. Louis | operational: Metro Transit's MetroLink light rail (over 46 miles across Missouri and Illinois) with the 1890s Union Station tunnel being rehabilitated and 55 Siemens vehicles on order; the Terminal Railroad Association of St. Louis holds three FRA bridge grants; the Northside-Southside Green Line corridor has moved from light rail to bus rapid transit | Metro Transit MetroLink (light rail) |
| Kansas City | operational: the KC Streetcar runs from the River Market to UMKC after the Main Street extension (24 October 2025) and the Riverfront extension (18 May 2026) opened; KCSA is reprocuring the operations contract and studying capacity for a relocated Royals stadium; a NorthRail study covers a Missouri River crossing to North Kansas City | KC Streetcar |
Withheld in the free surface
- Capex in this region (3)
- Market narrative
Full detail withheld: 2 fields. In the United States edition · See a fully open example
- Note
Full detail withheld: 1 field. In the United States edition · See a fully open example
Sources
- ● Bi-State Development: Board of Commissioners special meeting materials, 26 March 2026 · Board packet with the draft FY2027 Operating and Capital Budget (Resolution 1470): three-year capital budget FY2027-FY2029, project-type summary, Union Station Tunnel line. Retrieved with a browser user-agent. (published 2026-03-26 · checked 2026-10-07)
- ● Bi-State Development: Board of Commissioners open meeting materials, 12 June 2026 · Board packet containing the open-session minutes of 14 May 2026: Resolution 1491 (sole-source, Union Station tunnel track rehabilitation, KCI Construction), Resolution 1492 (Millstone Weber, McDonnell Boulevard tunnel track), Resolution 1485 (Modjeski & Masters design modification), budget status and Green Line BRT remarks. Retrieved with a browser user-agent. (published 2026-06-12 · checked 2026-10-07)
- ● Bi-State Development: Procurement Opportunities · Current-opportunities page: BSD solicitations are visible and biddable only to registered iSupplier/Sourcing users with a login; no solicitation list is public. (published 2026 · checked 2026-10-07)
- ○ Citizens for Modern Transit: Green Line bus rapid transit page · Advocacy-group summary (Secondary) of the Northside-Southside project: switch from light rail to BRT requested by the City in September 2025; East-West Gateway adopted the 11.5-mile Florissant Avenue alignment in June 2026; FTA accepts the mode change. Used only for the East-West Gateway June 2026 step because no primary page for it was reachable. (published 2026 · checked 2026-10-07)
- ● KC Streetcar Authority: Board meeting deck, 30 July 2026 · Board deck: elevated-rail repair of 18 July 2026 completed within 24 hours, data collection over 3 to 6 months to develop an ongoing capital programme for the downtown guideway; Midtown East-West RAISE grant of $4.5 million to KCATA; O&M reprocurement schedule. (published 2026-07-30 · checked 2026-10-07)
- ● KC Streetcar Authority: Board meeting deck, 24 September 2026 · Board deck: O&M contract with Herzog Transit Services expires 30 April 2028; RFP planned October 2026, negotiations complete summer 2027, contract executed late 2027; system-wide capacity and reliability study with HDR support; contract security services to be reprocured spring 2027. (published 2026-09-24 · checked 2026-10-07)
- ○ KCTV5: Streetcar extension down to UMKC will hold grand opening this fall · Secondary report of 24 July 2025: the Main Street extension costs $352 million, fully covered by federal and local sources; opening set for 24 October 2025. Used only for the total project cost because the FTA project profile returns HTTP 403. (published 2025-07-24 · checked 2026-10-07)
- ● MoDOT: Missouri River Runner 2026 Economic Impact Study handout · Handout: 194,276 passengers in 2024; two daily round trips over 283 miles between St. Louis and Kansas City; in FY2025 MoDOT received $16 million in state support for operation; no dedicated state funding source for passenger rail, funding is a yearly general revenue appropriation. (published 2026 · checked 2026-10-07)
- ● MoDOT: Long-Range Transportation Plan and State Freight and Rail Plan updates · Page: MoDOT is updating its Long-Range Transportation Plan and State Freight and Rail Plan together, a roadmap through 2050; the rail plan will include an updated economic impact analysis for public ports and the Missouri River Runner. (published 2026 · checked 2026-10-07)
- ● USAspending.gov: USDOT grant 69A36525420150RASMO, Missouri Department of Transportation · Federal award record: $17,250,000, CFDA 20.933 (National Infrastructure Investments), 1 June 2025 to 31 March 2028, signed 28 July 2025; partial reconstruction of Norfolk Southern's Grand River Bridge with a ballast-deck steel superstructure and a higher low-chord. (published 2025-07-28 · checked 2026-10-07)
- ● USAspending.gov: FRA CRISI grant 69A36525420750CRSMO, Missouri Department of Transportation · Federal award record: $10,357,239, CFDA 20.325, 1 January 2025 to 30 June 2028, signed 16 June 2025; full life-cycle grant for a grade-separated interchange and rail overpass on U.S. 60 with BNSF, closing eight at-grade crossings. (published 2025-06-16 · checked 2026-10-07)
- ● USAspending.gov: FRA CRISI grant 69A36522403380CRSMO, Terminal Railroad Association of St. Louis · Federal award record: $28,790,947, CFDA 20.325 (CRISI), 1 May 2022 to 31 January 2029, signed 25 August 2022; rehabilitate the bridge to a state of good repair for freight and passenger rail (the record does not name the bridge). (published 2022-08-25 · checked 2026-10-07)
- ● USAspending.gov: spending by award API · Federal award search API used to list FTA and FRA assistance awards with Missouri recipients, 1 October 2018 to 7 October 2026, because transit.dot.gov and railroads.dot.gov return HTTP 403. (published 2026-10-07 · checked 2026-10-07)