Connecticut

2 buyers · 34 tenders · checked 2026-10-07

One state buyer, CTDOT: $1.667bn Walk Bridge Program, Time for CT, $3.07bn Devon Bridge plan, Hartford Line double track, 60 Alstom coaches.

Everything here is free. One market edition opens in full with one email. Open your free edition

0Metro systems operating
2Buyers tracked
34Tenders tracked
5Cities tracked
Live pipeline
$1,667.0m Walk Bridge Program (capital-plan programme budget); $3,074.0m Devon Rail Bridge Replacement (capital-plan programme budget, design); $376.0m TIME-2 Norwalk; $315m Alstom 60-coach order; $280m Hartford Line Phase 3B double track (capital-plan budget); FRA grants including $574.6m Walk Bridge and $172m TIME-1
Technology areas
Track & civil, Electrification, Signalling & train control, Rolling-stock hardware, Digital operations

Key figures

Walk Bridge programme budget$1,667.0mWalk Bridge Program construction funding in the FFY2026-2030 capital plan sheet: federal $1,284.5m, state $382.5m; sheet stamped last updated 14 September 2023.
1 source · primary
FRA Northeast Corridor awardsnearly $2bn FFY2022-23Ten Connecticut projects selected for nearly $2bn of FRA FSP-NEC funding for FFY2022 and FFY2023, including $826,652,000 for Amtrak's Connecticut River Bridge and $1.168bn for CTDOT-managed projects; four projects for $291m in FFY2024.
1 source · primary
Devon Bridge replacement budget$3,074.0mDevon Rail Bridge Replacement programme budget in design, with an FRA award of $245,920,000 for design and NEPA.
2 sources · all primary
Hartford Line state commitmentover $1bn stateCTDOT states it has committed over $1bn of state funds to match federal grants on the Hartford Line Rail Program; FSP-NEC grants of $206.9m are part of a $2.3bn federal commitment statewide.
1 source · primary
60-coach order$315mAlstom contract for 60 single-level coaches announced 9 August 2023, first cars expected 2026.
1 source · primary
  • ● Governor of Connecticut (press release) · Purchase of 60 new rail cars: Alstom contract valued at 315 million, first cars expected 2026, 9 August 2023 (published 2023-08-09 · checked 2026-10-07)
Amtrak river bridge award$826,652,000FRA FSP-NEC award for Amtrak's Connecticut River Bridge replacement at Old Saybrook and Old Lyme; carried as t_amtrak_connecticut_river_bridge in the market file.
1 source · primary

Buyers

BuyerTypeTendersContracts awarded
Connecticut Department of Transportation (Office of Rail)State DOT321
Housatonic Railroad Co IncFreight railroad10

Tenders

TenderBuyerStatusValue bandNext key date
TIME-1 Contract A Bridgeport StratfordCTDOTAwarded$100–500mAwarded February 2026
Hartford Line Enfield station and trackCTDOTAwarded$25–100mAwarded October 2026
Housatonic River rail bridge interim repairsCTDOTAwarded$5–25mAwarded December 2025
Naugatuck railroad stationCTDOTAwarded$5–25mAwarded May 2025
New Haven coach yard acceptance facilityCTDOTAwarded$5–25mAwarded August 2025
Walk Bridge replacement NorwalkCTDOTIn executionover $1bnCompletion 2023
Alstom 60 commuter coachesCTDOTIn execution$100–500mPublished August 2023
Hartford Line Phase 4 stationsCTDOTIn execution$100–500m
Stamford maintenance-of-equipment facility renovationCTDOTIn execution$100–500mCompletion 2028
New Haven Rail Yard car and diesel shopsCTDOTIn execution$100–500m
TIME-2 projects East NorwalkCTDOTIn execution$100–500m
Waterbury Branch platform replacementsCTDOTIn execution$25–100m
Housatonic Railroad CRISI track and bridgesHousatonic RailroadIn execution$5–25m
Hartford Line Windsor Locks stationCTDOTIn execution$5–25mAwarded July 2022
Devon Rail Bridge replacementCTDOTPlannedover $1bn
New Haven Line station information upgradesCTDOTPlanned$100–500m
Hartford Line Phase 3B double trackCTDOTPlanned$100–500m
New Haven State Street Station platformCTDOTPlanned$100–500m
New Haven Union Station platformsCTDOTPlanned$100–500m
New Haven Line signal system improvementsCTDOTPlanned$100–500m
Stamford Yard catenary improvementsCTDOTPlanned$100–500m
Danbury fueling yard facilityCTDOTPlanned$25–100m
Derby-Shelton railroad stationCTDOTPlanned$25–100m
New Haven Line seven overpass bridges designCTDOTPlanned$25–100m
New Haven Line Power Phase 2 substationsCTDOTPlanned$60m-$89.99m scope band
New Haven Rail Yard wheel truing facilityCTDOTPlanned$25–100m
Stamford MOE PowerCTDOTPlannedAdvertising schedule scope band L ($30m to $39.99m)
Cos Cob Bridge replacement planningCTDOTPlanned$5–25m
New Haven Line fiber and CCTV upgradeCTDOTPlanned$5–25m
Springfield Line Connecticut River Bridge planningAmtrakPlanned$5–25m
Saugatuck River rail bridge planningCTDOTPlanned$5–25m
Shore Line East Madison stationCTDOTPlannedAdvertising schedule scope band K ($20m to $29.99m)
Waterbury station waiting roomCTDOTPlanned$5–25m
TIME-1 Contracts B and CCTDOTPlanned

Cities

CityNetwork statusNetworks
NorwalkWalk Bridge replacement under construction on the New Haven Line, with the TIME-2 bridges and East Norwalk station works alongside; East Norwalk station closed 26 September to 18 October 2026.Metro-North New Haven Line
New HavenUnion Station and State Street Station platform projects in design; the New Haven Rail Yard carries a car and diesel shop renovation, a coach acceptance facility and a planned wheel-truing shop.Metro-North New Haven Line; CTrail Hartford Line; CTrail Shore Line East
HartfordHartford Line terminus region: Phase 3B double track in West Hartford and Hartford is in design.CTrail Hartford Line
StamfordStamford maintenance-of-equipment facility renovation under way; yard catenary replacement in design; Stamford MOE power work scheduled for advertising in August 2027.Metro-North New Haven Line
BridgeportTIME-1 track, catenary and bridge corridor between Bridgeport and Stratford; Contract A awarded.Metro-North New Haven Line

Withheld in the free surface

  • Capex in this region (3)
  • Live pipeline value (3)
  • Market narrative

Full detail withheld: 3 fields. In the United States edition · See a fully open example

  • Advertising pipeline (2)

Full detail withheld: 1 field. In the United States edition · See a fully open example