Player · Civil contractor
? How to use this page

How to use a player page

  1. Where this supplier already holds positions, market by market.
  2. Competes with shows its rivals; Compare puts two players side by side.
  3. Order book and the partner path open with an edition.

Rail Vikas Nigam

State-owned · HQ India

Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the India edition — one edition is free with one email. Open your free edition · Open this record in the Atlas

Kind
Civil contractor
Markets
1
Positions held
6

Indian Railways' project-implementation PSU and metro executing agency.

Kind
Civil contractor
Headquarters
India
Ownership
State-owned
Segments
Civil works, Track, Electrification, Signalling, Rolling stock
Present in
India
Also a buyer
Rail Vikas Nigam Limited — Kolkata Metro corridors

Footprint

India

KindWhereDetailSources
HeadquartersDelhi-NCR, West Bengal, Haryana, MaharashtraNew Delhi; Navratna PSU (2003) — the Ministry of Railways' project-execution arm; Kolkata Metro corridors, HORC C-4 (₹1,088 cr), 25% of Kinet (Vande Bharat sleeper, Latur)
  • ○ Wikipedia · Rail Vikas Nigam — Navratna PSU under the Ministry of Railways (2003) (checked 2026-09-06)
  • ● Government of India — Integrated Government Online Directory · Ministry of Railways: PSUs / JVs / Companies (checked 2026-09-06)
  • ● HRIDC (official) · Company profile — GoH 51% : MoR 49% JV, incorporated 2017-08-22 (published 2026 · checked 2026-08-20)
  • ● HRIDC (official) · Haryana Rail Infrastructure Development Corporation — site and project pages (published 2026 · checked 2026-08-20)
  • ○ The Metro Rail Guy · HORC project page — route, packages, status (published 2026 · checked 2026-08-20)
  • ● AIIB (official) · Contract award notice, HORC package C-1 (KCC Buildcon) (published 2022-06-30 · checked 2026-08-20)
  • ○ The Metro Rail Guy · KCC Buildcon wins HORC C-1 priority section (₹158.16 cr) (published 2022-04-22 · checked 2026-08-20)
  • ○ The Metro Rail Guy · RVNL wins HORC C-4 tunnel contract (published 2023-03-18 · checked 2026-08-20)
  • ○ Metro Rail Today · RVNL wins ₹1,088 cr civil (tunnel) package, HORC (published 2023 · checked 2026-08-20)
  • ○ The Metro Rail Guy · PNC Infratech wins HORC C-23 contract (₹771.46 cr) (published 2023-02-28 · checked 2026-08-20)
  • ○ Swarajya · PNC Infratech wins 26 km Dhulawat–New Patli stretch, HORC (published 2023 · checked 2026-08-20)
  • ○ Metro Rail News · DBL wins HORC package C-5 (21.14 km, ₹1,092.45 cr) (published 2023 · checked 2026-08-20)
  • ○ The Metro Rail Guy · L&T awarded HORC electrification contract SYS-1 (₹980.68 cr) (published 2024-08-10 · checked 2026-08-20)
  • ○ Metro Rail Today · L&T bags ₹981 cr electrification contract, HORC (2x25kV OHE, power supply, SCADA) (published 2024 · checked 2026-08-20)
  • ○ tele.net · RailTel secures ₹82.04 cr S&T contract from HRIDC (Dhulawat–Manesar–New Patli; completion 2027-11-27) (published 2026-06-09 · checked 2026-08-20)
  • ○ The Tribune · Kurukshetra gets elevated rail corridor and Thanesar station; PM inaugurates (≈₹447 cr, 5.875 km) (published 2026-07 · checked 2026-08-20)
  • ● HORCL (official) · Haryana Orbital Rail Corporation Limited — HORC SPV site (published 2026 · checked 2026-08-20)
  • ● HRIDC (official) · Pre-tender query replies, tender HORC/HRIDC/C-6A/2026 — civil works + general electrical services, km 61.50–94.00 (New Patli–New Asaudha) incl. connectivities from Badsa station (published 2026-02-14 · checked 2026-09-05)

Ownership and structure

  • owned by Railway Board — Ministry of Railways public sector undertaking (administrative control) (active)
  • owns Kinet — 25% (TMH/Metrowagonmash 70%, LES 5%) (active)

Positions held

SegmentTechnologyPhase
  • awarded by CMRL — 12 underground stations Kilpauk–Taramani JICA-funded — RVNL (active · since 2023-09)
  • awarded by HRIDC — HORC C-4 Aravalli twin tunnel, 4.7 km (2023) (active · since 2023)
  • awarded by DMRC — Golden Line civil 7.3 km viaduct — RVNL (active)
  • awarded by BMRCL / Namma Metro — 750V DC third-rail Blue Line — RVNL (active)
  • awarded by K-RIDE — Corridor 4A 9 stations — RVNL (active)
  • in JV with Texmaco — Joint venture formed FY2026 (active)
Sources for these relationships (24)
  • ● AIIB (official) · Contract award notice, HORC package C-1 (KCC Buildcon) (published 2022-06-30 · checked 2026-08-20)
  • ● Business Standard (RVNL filing) · RVNL–Rithwik JV $64.4M (₹554 cr) LoA (BSRP C4A) (published 2025-02 · checked 2026-06-22)
  • ● HORCL (official) · Haryana Orbital Rail Corporation Limited — HORC SPV site (published 2026 · checked 2026-08-20)
  • ● HRIDC (official) · Pre-tender query replies, tender HORC/HRIDC/C-6A/2026 — civil works + general electrical services, km 61.50–94.00 (New Patli–New Asaudha) incl. connectivities from Badsa station (published 2026-02-14 · checked 2026-09-05)
  • ● HRIDC (official) · Haryana Rail Infrastructure Development Corporation — site and project pages (published 2026 · checked 2026-08-20)
  • ● HRIDC (official) · Company profile — GoH 51% : MoR 49% JV, incorporated 2017-08-22 (published 2026 · checked 2026-08-20)
  • ● Government of India — Integrated Government Online Directory · Ministry of Railways: PSUs / JVs / Companies (checked 2026-09-06)
  • ○ India Infoline · RVNL $52.0M (₹447 cr) DMRC Phase 4 (Golden Line ext.) (published 2025 · checked 2026-06-22)
  • ● Kinet Railway Solutions · Company home (TMH–RVNL JV; Latur) (checked 2026-09-06)
  • ○ Metro Rail News · DBL wins HORC package C-5 (21.14 km, ₹1,092.45 cr) (published 2023 · checked 2026-08-20)
  • ○ Metro Rail Today · RVNL $472M (₹4,058 cr) underground stations, Chennai Phase 2 (published 2023 · checked 2026-06-22)
  • ○ Metro Rail Today · RVNL wins ₹1,088 cr civil (tunnel) package, HORC (published 2023 · checked 2026-08-20)
  • ○ Metro Rail Today · L&T bags ₹981 cr electrification contract, HORC (2x25kV OHE, power supply, SCADA) (published 2024 · checked 2026-08-20)
  • ○ Metro Rail Today · Siemens–RVNL JV electrification (Blue Line) (published 2024-06 · checked 2026-06-22)
  • ○ ROLLINGSTOCK World · Kinet Railway Solutions produces first Vande Bharat sleeper body (checked 2026-09-06)
  • ○ Swarajya · PNC Infratech wins 26 km Dhulawat–New Patli stretch, HORC (published 2023 · checked 2026-08-20)
  • ○ tele.net · RailTel secures ₹82.04 cr S&T contract from HRIDC (Dhulawat–Manesar–New Patli; completion 2027-11-27) (published 2026-06-09 · checked 2026-08-20)
  • ● Texmaco Rail & Engineering · Rail EPC (Kalindee Rail Nirman merged; RVNL JV FY2026) (checked 2026-09-06)
  • ○ The Metro Rail Guy · KCC Buildcon wins HORC C-1 priority section (₹158.16 cr) (published 2022-04-22 · checked 2026-08-20)
  • ○ The Metro Rail Guy · PNC Infratech wins HORC C-23 contract (₹771.46 cr) (published 2023-02-28 · checked 2026-08-20)
  • ○ The Metro Rail Guy · RVNL wins HORC C-4 tunnel contract (published 2023-03-18 · checked 2026-08-20)
  • ○ The Metro Rail Guy · HORC project page — route, packages, status (published 2026 · checked 2026-08-20)
  • ○ The Metro Rail Guy · L&T awarded HORC electrification contract SYS-1 (₹980.68 cr) (published 2024-08-10 · checked 2026-08-20)
  • ○ The Tribune · Kurukshetra gets elevated rail corridor and Thanesar station; PM inaugurates (≈₹447 cr, 5.875 km) (published 2026-07 · checked 2026-08-20)

Competes with

Other civil contractor players present in the same markets.

PlayerHQMarketsPositions
L&TIndiaIndia10
GülermakTürkiyeIndia5
DBLIndiaIndia4
HCCIndiaIndia4
Ranjit BuildconIndiaIndia4
AfconsIndiaIndia3
CeigallIndiaIndia3
Tata ProjectsIndiaIndia3
1 source · secondary
  • ○ Wikipedia · Rail Vikas Nigam — Navratna PSU under the Ministry of Railways (2003) (checked 2026-09-06)

Browse: the Atlas · India · players · events

Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.