India · State
? How to use this page
How to use a region page
- Counts and the pipeline for this region come first; the tabs list its buyers, players and tenders.
- Cities on the map open their own pages.
- Capex, pipeline value and the market narrative open with this market's edition.
Delhi-NCR
10 buyers · 10 tenders · checked 2026-10-03
India's deepest urban-rail market and metro benchmark; largest DMRC network, first operational RRTS Namo Bharat, hosts national procurement policy headquarters.
Everything here is free. One market edition opens in full with one email. Open your free edition
3Metro systems operating
1RRTS operational
7Buyers tracked
10Tenders tracked
- Live pipeline
- $2.33B+ (₹20,000 cr+) in tracked tenders and recent awards
- Technology areas
- Signalling & train control, Rolling-stock hardware, Digital operations, Predictive maintenance, AI inspection, Cybersecurity, Track & civil, Electrification
Key figures
Delhi Metro operational network≈393 km, 12 lines, ≈288 stations
1 source · secondary
- ○ Wikipedia (cross-checked) · Delhi Metro — Haryana ends (Yellow/Violet/Green lines) (published 2026 · checked 2026-08-20)
NCRTC Namo Bharat RRTS82.15 km (Delhi–Meerut, fully operational 2026-02-26)
1 source · primary
- ● NCRTC (official) · Delhi–Meerut RRTS full corridor operational (published 2026-02-22 · checked 2026-06-22)
Buyers
| Buyer | Type | Tenders | Contracts awarded |
|---|---|---|---|
| Delhi Metro Rail Corporation | Metro corporation | 8 | 3 |
| Noida Metro Rail Corporation | Metro corporation | 2 | 3 |
| Railway Board / Ministry of Railways HQ | National rail HQ | 1 | 4 |
| National Capital Region Transport Corporation | RRTS SPV | 2 | 1 |
| National Capital Region Transport Corporation (Haryana footprint) | RRTS SPV | 1 | 0 |
| Northern Railway — Delhi Division | IR zone | 1 | 0 |
| Dedicated Freight Corridor Corporation of India | Freight corridor | 0 | 0 |
| Delhi Metro Rail Corporation (Haryana ends) | Metro corporation | 0 | 0 |
| Northern Railway — Ambala & Delhi Divisions (Haryana footprint) | IR zone | 0 | 0 |
| Rapid Metro Gurugram (GMRL/HMRTC transition) | Metro corporation | 0 | 0 |
Tenders
| Tender | Buyer | Status | Value band | Next key date |
|---|---|---|---|---|
| RRTS MRTS Make-in-India trainsets Savli | NCRTC | Awarded | $291–349M (₹2,500–3,000 cr) | |
| RRTS ETCS Hybrid L3 signalling | NCRTC | Awarded | $105–116M (₹900–1,000 cr) | |
| RS-17 312 standard-gauge coaches Phase 4 | DMRC | Awarded | $291–349M (₹2,500–3,000 cr) | Awarded 2025 |
| 10-year rolling stock maintenance Badli | DMRC | Awarded | $46.5–52.3M (₹400–450 cr) | Awarded September 2025 |
| DS-24 AFC 44 Phase-4 stations | DMRC | Awarded | $46.5–52.3M (₹400–450 cr) | |
| Golden Line civil 7.3 km viaduct | DMRC | Awarded | $46.5–52.3M (₹400–450 cr) | |
| Phase 4 CBTC ATS Pink Golden | DMRC | Awarded | $52.3–64.0M (₹450–550 cr) | Published April 2023 |
| Rithala–Narela–Nathupur corridor Phase 4 | DMRC | In execution | $698–756M (₹6,000–6,500 cr) | |
| National KAVACH signalling modernisation | Railway Board | Planned | $116–174M (₹1,000–1,500 cr) | Sanctioned April 2026 |
| KAVACH 811 route-km Ambala Division | NR (Delhi) | Planned | $23.3–29.1M (₹200–250 cr) | Sanctioned 2025–26 |
Cities
| City | Network status | Networks |
|---|---|---|
| Delhi | operational + Phase 4 construction | Delhi Metro (12 lines) |
| Ghaziabad | operational (RRTS + metro corridor) | Namo Bharat RRTS; Delhi Metro (Red/Blue reach) |
Players with a footprint here
| Player | Kind | Footprint |
|---|---|---|
| L&T | Civil contractor | Headquarters |
| RVNL | Civil contractor | Headquarters |
| Aurionpro | Technology vendor | Headquarters |
| RailTel | Technology vendor | Headquarters |
| IRCON | Civil contractor | Headquarters |
| ITD Cementation | Civil contractor | Headquarters |
| LEA Associates | Engineering consultant | Headquarters |
| SYSTRA | Engineering consultant | Regional HQ |
| ADB | Funder / investor | Office |
| CONCOR | Freight railroad | Headquarters |
| IRFC | Funder / investor | Headquarters |
| JICA | Funder / investor | Office |
| NDB | Funder / investor | Office |
| WSP | Engineering consultant | Office |
| World Bank | Funder / investor | Office |
Events here
| Event | Kind | City | Dates | Organiser |
|---|---|---|---|---|
| 8th Rail & Metro Technology Conclave & Expo 2027 | Conference | New Delhi | July 2027 | Rail Analysis (Projections Strategy LLP) |
| RailTrans Expo 2027 | Trade fair | New Delhi | 1–3 July 2027 | Urban Infra Group |
| IREE 2027 | Trade fair | New Delhi | October 2027 | CII with the Ministry of Railways |
What changed
From This Week in Rail, newest first.
- 2026-09-28 — NCRTC tenders enabling works, development works and commuter amenities for the Delhi–Ghaziabad–Meerut Namo Bharat corridor, bids closing 15 October.
- 2026-09-21 — NCRTC tenders facade-lighting works, with a two-year defect-liability period and a further three-year maintenance contract, for Sarai Kale Khan Namo Bharat station, bids close 30 September.
- 2026-09-21 — NCRTC will source 60% of the Namo Bharat corridor's power from solar energy.
- 2026-09-14 — NCRTC re-tenders the shifting of 400/220/66/33kV overhead transmission lines along the Delhi–Panipat–Karnal Namo Bharat corridor, bids now closing 29 September — extended from the 17 September deadline carried in the 24 August issue.
- 2026-09-07 — NCRTC tenders enabling, development, commuter-amenity and security works for the Delhi–Ghaziabad–Meerut Namo Bharat corridor; bids close 30 September
Withheld in the free surface
- Market narrative
- Allocation context (3)
Full detail withheld: 2 fields. In the India edition · See a fully open example
- Dmrc ridership (4)
- Dmrc phase4 (4)
- Noida metro (3)
- RRTS cost (4)
Full detail withheld: 4 fields. In the India edition · See a fully open example
Browse: the Atlas · India · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.