? How to use this page
How to use a buyer page
- Who this buyer is, then who already holds positions here and what it is tendering.
- Click Watch and every change lands in your weekly digest.
- How to sell here — the route in, thresholds, portals and contacts — opens with this market's edition.
National Capital Region Transport Corporation
Every fact on this page is free. Exact values, dates, award detail and the procurement route open in the India edition — one edition is free with one email. Open your free edition · Open this record in the Atlas
- Type
- RRTS SPV — GoI + Delhi/Haryana/Rajasthan/UP JV
- Market · Region
- India · Delhi-NCR, Uttar Pradesh
- Open tenders
- 0
- Technology areas
- Signalling & train control, Digital operations, Predictive maintenance, Cybersecurity, Rolling-stock hardware, Track & civil, Electrification, AI inspection
Builds and operates Namo Bharat RRTS and Meerut Metro, fully operational since Feb 2026.
About this buyer
Read more
Builds and operates the Regional Rapid Transit System (Namo Bharat); Delhi–Meerut (82.15 km) operational; Panipat (136 km) and Alwar (164 km) corridors approved.
- Type
- RRTS SPV — GoI + Delhi/Haryana/Rajasthan/UP JV
- Where
- Delhi-NCR, Uttar Pradesh · Meerut
- Technology areas
- Signalling & train control, Digital operations, Predictive maintenance, Cybersecurity, Rolling-stock hardware, Track & civil, Electrification, AI inspection
Structure
Who holds what here
- awarded Alstom — RRTS rolling stock and depot M&P; ETCS Hybrid Level 3 signalling and telecom (active)
- Contract detail and values (2)$500m–1bnIn the India edition See a fully open example
Sources for these relationships (6)
- ● National Portal of India · Metro rail projects under the Ministry of Housing and Urban Affairs (checked 2026-09-06)
- ● NCRTC (official) · NCRTC corporate site — Namo Bharat RRTS and Meerut Metro (published 2026 · checked 2026-08-20)
- ● New Development Bank · Mumbai Metro Rail II (Line 6) project — US$241m (checked 2026-09-06)
- ○ PRS Legislative Research · Demand for Grants analysis — Housing and Urban Affairs (13 metro projects as 50:50 JVs) (checked 2026-09-06)
- ○ Sify · NCRTC $106M (₹910 cr) signalling to Alstom (published 2024 · checked 2026-06-22)
- ○ Urban Transport News · Bombardier $300M (₹2,577 cr) RRTS rolling stock (published 2020 · checked 2026-06-22)
Tenders
| Tender | Status | Value band | Next key date |
|---|---|---|---|
| RRTS MRTS Make-in-India trainsets Savli | Awarded | $291–349M (₹2,500–3,000 cr) | |
| RRTS ETCS Hybrid L3 signalling | Awarded | $105–116M (₹900–1,000 cr) |
What changed
From This Week in Rail, newest first.
- 2026-09-28 — NCRTC tenders enabling works, development works and commuter amenities for the Delhi–Ghaziabad–Meerut Namo Bharat corridor, bids closing 15 October.
- 2026-09-21 — NCRTC tenders facade-lighting works, with a two-year defect-liability period and a further three-year maintenance contract, for Sarai Kale Khan Namo Bharat station, bids close 30 September.
- 2026-09-21 — NCRTC will source 60% of the Namo Bharat corridor's power from solar energy.
- 2026-09-14 — NCRTC re-tenders the shifting of 400/220/66/33kV overhead transmission lines along the Delhi–Panipat–Karnal Namo Bharat corridor, bids now closing 29 September — extended from the 17 September deadline carried in the 24 August issue.
- 2026-09-07 — NCRTC tenders enabling, development, commuter-amenity and security works for the Delhi–Ghaziabad–Meerut Namo Bharat corridor; bids close 30 September
Withheld in the free surface
- Procurement structure
- Award history (1)
- Entry path
- Portals (1)
Full detail withheld: 4 fields. In the India edition · See a fully open example
3 sources · 1 primary
- ● NCRTC (official) · NCRTC corporate site — Namo Bharat RRTS and Meerut Metro (published 2026 · checked 2026-08-20)
- ○ Sify · NCRTC $106M (₹910 cr) signalling to Alstom (published 2024 · checked 2026-06-22)
- ○ Urban Transport News · Bombardier $300M (₹2,577 cr) RRTS rolling stock (published 2020 · checked 2026-06-22)
Browse: the Atlas · India · players · events
Compiled by Watchtower to editorial standards the Managing Partner sets and enforces. Public record only — every datum carries its source.